• Title/Summary/Keyword: Schedule Planning

Search Result 364, Processing Time 0.031 seconds

A Development of Computerized Management System for Deconstruction (분별해체공사 통합관리 시스템의 개발)

  • Kim, Hyo-Jin;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.638-641
    • /
    • 2004
  • This study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse and recycle rate of material to be different from traditional demolition. The purpose of this system is to minimize environmental damages and reduce construction waste quantity of a country by planning and operating preliminarily estimation of demolition quantity, demolition methods of each structural elements and reuse or recycle methods of C&D waste. This system is consist of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management, and these all modules can be used individually module according to user's utilization purpose.

  • PDF

An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format (중립파일 기반의 조선소 시뮬레이션 환경에 관한 연구)

  • Woo, Jong Hun;Hwang, Yoon-Suk;Nam, Jong-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.53 no.1
    • /
    • pp.18-28
    • /
    • 2016
  • In shipbuilding, the scheduling system is susceptible to sudden changes and thus it turns to be difficult to predict the differences between schedule and production records in advance. A computer-based simulation is commonly utilized to overcome the discrepancies occurred in estimating workloads and resulting processing times. The main drawback of this simulation-based solution is its limited applicability because, in most cases, each shipyard requires specific and customized simulation environment. By standardizing the planning data of the midterm scheduling system, as proposed in this paper, the efficiency of the current simulation model can be enhanced. To present an alternative approach, this paper begins with the analysis of the complex planning data structure of several shipyards and then proceeds to construct a standard data structure based on the neutral format. An interface application is developed for the data transaction and simulation in on-line environment. As a result, a simulation-based production management of shipyards can be achieved by the efficient prediction of planning and scheduling.

A Decision Support System for an Optimal Transportation Network Planning in the Third Party Logistics

  • Park, Yong-Sung;Choi, Hyung-Rim;Kim, Hyun-Soo;Park, Nam-Kyu;Cho, Jae-Hyung;Gang, Moo-Hong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.240-257
    • /
    • 2006
  • In an effort to gain competitiveness, recently many companies are trying to outsource their logistics activities to the logistics specialists, while concentrating on their core and strategic business area. Because of this trend, the third party logistics comes to the fore, catching people's attention, and expanding its market rapidly. Under these circumstances, the third party logistics companies are making every effort to improve their logistics services and to develop an information system in order to enhance their competitiveness. In particular, among these efforts one of the critical parts is the decision support system for effective transportation network planning. To this end, this study has developed an efficient decision support system for an optimal transportation network planning by comprehensively considering the transportation mode, routing, assignment, and schedule. As a result of this study, the new system enables the expansion of the third party logistics companies' services including the multimodal transportation, not to mention one mode of transportation, and also gets them ready to plan an international transportation network.

  • PDF

A Study on the RTLS based Dynamic Planning of Yard Tractors in Container Terminals

  • Lee, Seok-Yong;Lee, Chul-Ho
    • Journal of Navigation and Port Research
    • /
    • v.31 no.2
    • /
    • pp.141-149
    • /
    • 2007
  • The competitiveness of container terminals hinges on minimizing the time vessels spend in port and on schedule services. Many previous researches on container terminals have tried to optimize the equipment allocation plan and to improve the activity of resources. Nevertheless, there have been few researches conducted on yard tractors, which move containers between the quay and the yard. The aim of this study is to propose the use of Real Time Location Systems (RTLS) based Dynamic Planning for yard tractors. Only RFID (Radio Frequency Identification) tags, which are attached to yard tractors, are able to support RTLS implementation. The system can provide real time job ordering in terms of load balancing using the information on location, in regards to the movement of yard tractors. This study will present the practical feasibility of RTLS, which can ultimately reduce the congestion of Hot Queues in container terminals. As a result, container terminals can be more productive and competitive. In order to accomplish the purpose of this study, we examined previous studies on the competitiveness of container terminals and summarized the potential of RTLS using RFID. In addition, we identified the role of yard tractors and proposed the two rules of Dynamic Planning for the yard tractors. We then fulfilled computational experiments on how yard tractors carrying containers by RTLS ordering Finally, the benefits and the implications of this study are discussed.

Analysis on the Orbit Prediction Accuracy of the Image Collection Planning for KOMPSAT-2 (아리랑위성 2호 영상촬영계획 궤도예측 정밀도 분석)

  • Jung, Ok-Chul;Kim, Hae-Dong;Chung, Dae-Won
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.223-228
    • /
    • 2008
  • In order to acquire the images requested by users, it is very important to calculate mission schedule parameters such as imaging execution time and attitude tilt angle accurately. These parameters are based on orbit prediction. This paper describes the accuracy of orbit propagation for image planning. The orbit prediction data from PSS and MAPS has a certain discrepancy due to different orbit propagator. It is necessary for mission planner to confirm this value during mission planning phase. The pointing error which means the difference between target center and real image received is calculated and analyzed using KOMPSAT-2 image data.

  • PDF

Demonstration Schedule of Eurofix Using Leran-C System

  • Kim, Minjung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2001.10a
    • /
    • pp.49-55
    • /
    • 2001
  • It was proposed and admitted at 9$^{th}$ FERNS Metting that FERNS countries, while recognizing that Loran-C is very important as a back-up for satellite systems, should consider whether the cost-effectiveness of the system could be improved by making use of its communication facilities to inegrate more closely with satellite system, members were requested to give this proposed consideration before the tenth session of the Council (CS 9/8/1 paragph 6.7). For this matter, Korea is planning to demonstrate treasmitting EUROFIX signals from Pohang station (Master of 9930 Chain) during FERNS meetings.

  • PDF

Research of Integrated System Design Process for Concurrency Design Activity (동시적 업무수행을 위한 통합된 시스템 설계 프로세스 연구)

  • Kim Jin-Hoon;Park Young-Won
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.141-152
    • /
    • 2004
  • This study describes process and method to establish concurrent and/or sequential schedule planning for the system design process of the EIA632 standard. For this purpose, the study suggest Process and method that are context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrent and/or sequential work flow. The proposed process and method will contribute to minimize time loss that is emerged from activities iteration.

Profitability Evaluation System for Railway Transportation Plan (철도수송계획의 수익성 평가체계)

  • Kim, Dong-Hui;Hong, Sun-Heum
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.211-214
    • /
    • 2004
  • In railway system, the transportation plan corresponds to master plan for transport services. This service plan must be constructed to minimize operational cost or maximize revenue considering transportation demands and resource capacities in the operation company, and includes several sub-planning activities such as train operation frequency plan, train (schedule) plan, train capacity assignment plan, and rolling stock requirement plan. In this paper, we present profitability evaluation system for current transportation plan. The proposed system can be used for evaluating profitability by estimating train service revenue considering customer demands.

  • PDF

Formulation and optimization of cubic polynomial joint trajectories for industrial robots (산업용 로보트를 위한 3차 다항식 조인트궤적의 구성과 최적화)

  • 김태산;배준경;박종국
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.92-97
    • /
    • 1988
  • The path planning is done at the joint level. Cubic spline functions are used for constructing joint trajectories for industrial robots. For N-joint robot, Cartesian knots are transformed into N sets of joint displacements, with one set for each joint. For industrial application the speed of operation affects the productivity. An algorithm is developed to schedule the time intervals between each pair of adjacent knots such that the total traveling time is minimized subject to the physical constraints on joint velocties acceleration and jerks.

  • PDF

금형공장의 공정관리를 위한 Modular Software System

  • 강무진;김영기
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1992.04a
    • /
    • pp.301-305
    • /
    • 1992
  • A mold plant is characterized by complex processes, frequent schedule changes, and lots of troubles. In order to control the production in mold plant efficiently, huge amount of informations are to be managed in the appropriate way. In this paper, a modular software system for production control is described, which is located between a higher level production planning system and a process control system. It contains the functions such as order processing, operations scheduling and control, tool managemant, NC program managememt including DNC functions, production data acquisition and progress control and statistics.