1 |
Lee, D.G., 2013. Study on the PPR3-S information-based neutral model and system for integration and extension of shipbuilding production planning simulations. Ph.D. Thesis. Seoul National University.
|
2 |
Lee, J.H. Lee, P. Yoon, K.W. & Nam, J.H., 2014. Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation. Journal of the Society of Naval Architects of Korea, 51(6), pp.510-520.
DOI
|
3 |
Lee, J.M., 2007. Integrated process and measurement framework for planning production of large shipyards. Ph.D. Thesis. Seoul National University.
|
4 |
Nam, J.H. Lee, J.H. & Woo, J.H., 2015. Construction of Standardised Data Structure for Simulationof Mid-term Scheduling of Shipbuilding Process. International Journal of Computer Integrated Manufacturing, http://www.tandfonline.com/doi/full/10.1080/0951192X.2015.1066031.
|
5 |
Han, S.D. Ryu, C.H. Shin, J.G. & Lee, J.K., 2008. Implementation and Applications of Simulation based Digital Shipyard. Journal of CAD/CAM Engineers, 13(1), pp.18-26.
|
6 |
Kim, H.Y. Nam, J.H. Lee, J.H. & Lee, P., 2012. Construction of data structure for simulation system of shipbuilding midterm scheduling. Conference of Society of CAD/CAM Engineers, Korea, Fabruary 16~18, pp.69-72.
|
7 |
Song, Y.J. Lee, D.K. Choe, S.W. Woo, J.h. & Shin, J.G., 2009. Simulation-based Capacity Analysis of a Block-assembly Process in Shipproduction Planning. Journal of the Society of Naval Architects of Korea, 46(1), pp.78-86.
DOI
|
8 |
Woo, J.H., 2005. Modeling and simulation of IndoorShop system of shipbuilding by integration of the product, process, resource and schedule information. Ph.D. Thesis. Seoul National University.
|
9 |
Woo, J.H. & Song, Y.J., 2014. Systematisation of Ship Production Management and Casestudy for Ship Block Assembly Factory. International Journal of Computer Integrated Manufacturing, 27(4), pp.333-347.
DOI
|