• 제목/요약/키워드: Schedule Module

검색결과 69건 처리시간 0.029초

금형 생산관리를 위한 응용 소프트웨어의 개발 (Development of an Application Software for the Die-Production Information Management)

  • 공명달;김정자
    • 산업공학
    • /
    • 제9권2호
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구 (Module Suggestion to Develop an Integration System of Schedule and Change Control)

  • 소용성;오승준;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.393-396
    • /
    • 2002
  • 본 연구는 공정 및 변경관리 통합시스템 개발을 위한 모듈을 제안하고자 한다. 이를 위해 공정과 변경관리에 관련한 이론적 고찰을 바탕으로, 공정 및 변경 관리의 미 통합시 야기되는 문제점과 통합관리시의 기대효과를 통해 새로운 통합관리 모듈을 제시하고자 한다. 이와 같은 목적과 절차에 따라 수행된 본 연구의 결과를 요약하면 다음과 같다. 1) 변경예측정보관리 모듈의 제시: 아직 일어나지 않은 위험 사안에 대해 최선의 대응방안을 제시하는데 활용된다. 2) 변경정보 관리 모듈의 제시: 변경이 확정된 사안을 공정관리 시스템에 적용하는데 사용된다. 3) 변경이력관리 모듈의 제시: 변경이 결정된 공정 및 공사비 정보를 관리하고, 변경된 사항을 통하여 전체적인 변경 추세를 판단하는 데 사용된다.

  • PDF

BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module)

  • 박재현;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구 (A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction)

  • 김경훈;김경환;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.886-891
    • /
    • 2007
  • 최근 공정관리를 위한 각종 기법들이 개발되고 있으며, 실질적인 시공프로세스를 구체적인 3차원 이미지로 형상화하여 보여줌으로써, 공정계획에 대한 추상적인 개념 모델을 구체적인 것으로 변환하여 발전시킬 수 있다. 하지만 이는 3D-CAD와 공정프로그램을 연계하여 사용하는 방식으로 사람이 정보를 옮겨주거나 입력을 해야 하는 번거로움이 수반된다. 본 연구에서는 3D-CAD 객체 정보 시스템 활용 및 공정자동생성 모듈을 활용하여 통합DB 구축을 통한 실시간 철골공사 공정관리 시스템 프로세스를 구축하였다. 본 연구는 IDEF0 모델을 이용하여 철골공정 관리 프로세스를 제시하였으며, RFID 시스템 설계를 통하여 실시간 진도관리 및 분석 프로세스를 제시하였다. 이를 통해 예상공정정보의 신속한 생성과 실시간으로 실제공정정보와의 비교 ${\cdot}$ 분석 및 시뮬레이션을 실현하고자 한다.

  • PDF

UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 - (Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction -)

  • 박정로;김경환;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

연구로 가상 해체 시설 설계 (Design of a virtual dismantling facility for research reactor)

  • 박희성;김성균;이근우;오원진;박진호
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2005년도 추계 학술대회 논문집
    • /
    • pp.47-55
    • /
    • 2005
  • 가상의 연구로 해체 시설 환경을 설계하는데 필요한 단위 프로그램들의 특성을 검토한 후 결과 자료를 바탕으로 해체 디지털 목업 시스템의 설계가 완료되었다. 단위 프로그램들은 해체 데이터베이스 시스템 모듈 연구로 시설과 제염 및 해체 장비를 3차원으로 모델링하는 모듈, 3차원으로 방사능 오염 분포도를 묘사하는 모듈, 그리고 해체 일정 및 해체 비용을 평가하는 모듈 등으로 구분된다. 독립적으로 운영되는 이들 단위 모듈들을 통합된 시스템으로 만들기 위해 단위 모듈들의 아키텍쳐 설계 연구가 수행되었다. 연구 결과 다양한 모듈들로 구성된 해체 디지털 목업 시스템을 통합된 환경에서 시나리오를 시험 평가할 수 있도록 하기위해 연구로 시설의 제염 및 해체 활동을 시각적으로 보여줄 수 있는 가시화(visualization) 모듈과 해체 일정 및 해체 비용을 평가하고 분석하는 시뮬레이션(simulation) 모듈로 해체 디지털 목업 시스템의 아키텍쳐를 구현하였다.

  • PDF

Window환경에 기초한 발전기 예방정비계획 프로그램 개발 (A Development of Maintenance Scheduling Program Based on Windows)

  • 박영문;박종배;원종률;정만호;김진호;추진부;전동훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.823-825
    • /
    • 1996
  • This paper proposes a preventive maintenance scheduling system which is a user-friendly decision-making support system. The objective of the development of the package is to supply KEPCO's working experts with a useful tool for gaining a practical maintenance schedule. This program based on the MS Windows is made up of two main modules. The first is an interactive decision-making support module(IDSM). The main objective of this module is to provide various useful text and graphic information to users, and enable practicing engineers with sensitivity analysis of a targeting maintenance schedule. The second is a mathematical optimization module(MOM). In this module, the objective function of levelizing net reserve ratio with daily time-increment is optimized using the relaxation method.

  • PDF

기준생산계획 평가 시스템을 위한 시뮬레이션 모델 (A Simulation Model for Master Production Schedule (MPS) Evaluation System)

  • 최성훈
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1998년도 The Korea Society for Simulation 98 춘계학술대회 논문집
    • /
    • pp.106-110
    • /
    • 1998
  • Some successful scheduling systems are based on simulation technique. However, they are relatively expensive. A cost-effective solution is to apply general-purpose simulation software to the scheduling system. This paper is concerned with developing a simulation model for MPS(Master Production Schedule) evaluation system. The target system of the model is PC production system. AIM (Analyzer for Improving Manufacturing system), a well-known manufacturing oriented simulation software, is used for modeling tool. Eventually, the model can be included into an MPS evaluation system as simulation module and a scheduler can use the system to verify the MPS in advance.

  • PDF