Development of an Application Software for the Die-Production Information Management (금형 생산관리를 위한 응용 소프트웨어의 개발)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

Module Suggestion to Develop an Integration System of Schedule and Change Control (공정 및 변경관리 통합시스템 개발을 위한 모듈 제안에 관한 연구)

  • So Young-Sung;Oh Seung-Jun;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.393-396
    • /
    • 2002
  • Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.

  • PDF

A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Design of a virtual dismantling facility for research reactor (연구로 가상 해체 시설 설계)

  • Park Hui-Seong;Kim Seong-Gyun;Lee Geun-U;O Won-Jin;Park Jin-Ho
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11a
    • /
    • pp.47-55
    • /
    • 2005
  • A design of a dismantling mock-up system have been established based on the result that analyzed a characteristic of modules which need to design a virtual dismantling facility. A unit program composed of a various module such as a decommissioning database system. 3D dosimetric mapping that represents a distribution of a radionuclide contamination, a evaluation module for a dismantling schedule and cost A research of software architecture was carried out in order to Integrate these components that have been independently operated. The result was established an architecture that consis of a visualization module which could be visualized D&D activities and a simulation module which tan he evaluated a dismantling schedule and decommissioning cost.

  • PDF

A Development of Maintenance Scheduling Program Based on Windows (Window환경에 기초한 발전기 예방정비계획 프로그램 개발)

  • Park, Young-Moon;Park, Jong-Bae;Won, Jong-Ryul;Jhong, Man-Ho;Kim, Jin-Ho;Choo, Jin-Boo;Jeon, Dong-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.823-825
    • /
    • 1996
  • This paper proposes a preventive maintenance scheduling system which is a user-friendly decision-making support system. The objective of the development of the package is to supply KEPCO's working experts with a useful tool for gaining a practical maintenance schedule. This program based on the MS Windows is made up of two main modules. The first is an interactive decision-making support module(IDSM). The main objective of this module is to provide various useful text and graphic information to users, and enable practicing engineers with sensitivity analysis of a targeting maintenance schedule. The second is a mathematical optimization module(MOM). In this module, the objective function of levelizing net reserve ratio with daily time-increment is optimized using the relaxation method.

  • PDF

A Simulation Model for Master Production Schedule (MPS) Evaluation System (기준생산계획 평가 시스템을 위한 시뮬레이션 모델)

  • 최성훈
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.03a
    • /
    • pp.106-110
    • /
    • 1998
  • Some successful scheduling systems are based on simulation technique. However, they are relatively expensive. A cost-effective solution is to apply general-purpose simulation software to the scheduling system. This paper is concerned with developing a simulation model for MPS(Master Production Schedule) evaluation system. The target system of the model is PC production system. AIM (Analyzer for Improving Manufacturing system), a well-known manufacturing oriented simulation software, is used for modeling tool. Eventually, the model can be included into an MPS evaluation system as simulation module and a scheduler can use the system to verify the MPS in advance.

  • PDF