• Title/Summary/Keyword: Schedule Model

Search Result 718, Processing Time 0.025 seconds

MODELING MEASURES OF RISK CORRELATION FOR QUANTITATIVE FLOAT MANAGEMENT OF CONSTRUCTION PROJECTS

  • Richard C. Jr. Thompson;Gunnar Lucko
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.459-466
    • /
    • 2013
  • Risk exists in all construction projects and resides among the collection of subcontractors and their array of individual activities. Wherever risk resides, the interrelation of participants to one another becomes paramount for the way in which risk is measured. Inherent risk becomes recognizable and quantifiable within network schedules in the form of consuming float - the flexibility to absorb delays. Allocating, owning, valuing, and expending such float in network schedules has been debated since the inception of the critical path method itself. This research investigates the foundational element of a three-part approach that examines how float can be traded as a commodity, a concept whose promise remains unfulfilled for lack of a holistic approach. The Capital Asset Pricing Model (CAPM) of financial portfolio theory, which describes the relationship between risk and expected return of individual stocks, is explored as an analogy to quantify the inherent risk of the participants in construction projects. The inherent relationship between them and their impact on overall schedule performance, defined as schedule risk -the likelihood of failing to meet schedule plans and the effect of such failure, is matched with the use of CAPM's beta component - the risk correlation measure of an individual stock to that of the entire market - to determine parallels with respect to the inner workings and risks represented by each entity or activity within a schedule. This correlation is the initial theoretical extension that is required to identify where risk resides within construction projects, allocate and commoditize it, and achieve actual tradability.

  • PDF

A Model of Military Helicopter Pilot Scheduling (군용 헬리콥터 조종사 스케줄링 모형)

  • Kim, Joo An;Lee, Moon Gul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.150-160
    • /
    • 2020
  • In this paper, we introduce a pilot's scheduling model which is able to maintain and balance their capabilities for each relevant skill level in military helicopter squadron. Flight scheduler has to consider many factors related pilot's flight information and spends a lot of times and efforts for flight planning without scientific process depending on his/her own capability and experience. This model reflected overall characteristics that include pilot's progression by basis monthly and cumulative flight hours, operational recent flight data and quickly find out a pinpoint areas of concern with respect to their mission subjects etc. There also include essential several constraints, such as personnel qualifications, and Army helicopter training policy's constraints such as regulations and guidelines. We presented binary Integer Programming (IP) mathematical formulation for optimization and demonstrated its effectiveness by comparisons of real schedule versus model's solution to several cases experimental scenarios and greedy random simulation model. The model made the schedule in less than 30 minutes, including the data preprocessing process, and the results of the allocation were more equal than the actual one. This makes it possible to reduce the workload of the scheduler and effectively manages the pilot's skills. We expect to set up and improve better flight planning and combat readiness in Korea Army aviation.

Development of Activity and WBS for Integrated Cost and Schedule Control Process in Bridge Works (공정$\cdot$공사비 통합관리를 위한 Activity 및 WBS 구축 방안 -교량공사 예시)

  • Kim Jung-Ki;Lee Young-Dae;Kim Soo-Yong;Park Hyeo;Kim Sung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.406-409
    • /
    • 2001
  • This study refers to development of WBS(Work Breakdown Structure) and Activity sample for integrated cost and schedule control system of sample bridge work in the field. The conclusions from this study may be summarized as following 1. It showed that the level of detail to network's activities depend upon schedule's intended purpose. 2. It is more effective 'activity to cost package model' than 'activity to resource model', for integrated cost and schedule control reflect the characteristics of domestic construction industry.

  • PDF

Design and Implementation of Mathematical Model based Hierarchical Conflict Detection and Resolution (수리모형 기반의 계층적 열차경합관리 설계 및 구현)

  • Kim, Kyung-Min;Hong, Soon-Heum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.687-694
    • /
    • 2008
  • Given the daily tactical schedule, the purpose of the traffic management system is to develop operating plan that will achieve the stated schedule as best as possible. The operating plan has to be modified during the day because of occurring disturbance(e.g. delay, infrastructure breakdown, etc.) Conflict detection and resolution(CDRS) are aimed for adjusting the distorted schedule to tactical schedule. Our research separate CDRS into two hierarchy modules, line conflict control module and station conflict control module. We define the role of each modules and design the cooperative architecture. We suggest the conflict detection and resolution approach based on mathematical model. These results can be implemented as prototype modules.

  • PDF

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.

A Study of Optimal Operation of Sewage Treatment Plants Using NLP (비선형계획법을 이용한 수도권 하수처리장의 최적운영에 관한 연구)

  • 김중훈;윤용남
    • Water for future
    • /
    • v.29 no.4
    • /
    • pp.131-138
    • /
    • 1996
  • The objective of this study is to develop an optimal operation model for the sewage treatment plants using nonlinear programming (NLP) technique and the QUAL2E model. The model finds the minimum-cost operation of sewage treatment plants while satisfying all design constraints and water quality (BOD) standard. The model is applied to four sewage treatment plants in Han River for the city of Seoul. It has been found that optimal operation schedule for the sewage treatment plants can be computed and it is more economic to operate the plants according to the schedule which satisfies the water quality constraints in the river. In addition, the water quality in the river can be predicted using the model under the treatment policy.

  • PDF

Stochastic Programming Approach to Scheduling Elective Surgeries and the Effects of Newsvendor Ratio on Operating Room Utilization (추계적 계획법을 이용한 수술실 예약 모델과 Newsvendor 비율의 자원 효율성에 대한 영향 분석)

  • Min, Dai-Ki
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.17-29
    • /
    • 2011
  • The purpose of this paper is to schedule elective surgery patients using a stochastic programming approach and to illustrate how operating room utilization behaves when a decision-maker varies costs associated with utilization. Because of the uncertainty in surgery durations, the underage and overage costs that a decision-maker considers plays an important role in allocating surgery cases into available operating room capacity. We formulate the problem as a stochastic mixed integer programming and propose a sampling-based approximation method for a computational purpose. Newsvendor model is employed to explain the results from numerical experiments that are conducted with the actual data from a hospital. The results show that the operating room utilization is more sensitive when the unit overtime cost is relatively larger than the unit cost for underutilized time.

Effect of an herbal formulation on DOCA-salt and fructose induced models of hypertension in rats

  • Athare, CL;Mohan, M;Kasture, SB
    • Advances in Traditional Medicine
    • /
    • v.8 no.4
    • /
    • pp.354-364
    • /
    • 2008
  • The present study was carried out to investigate the antihypertensive effect of a folklore herbal formulation (HF) (300mg/kg/day; p.o.) in deoxycorticosterone acetate (DOCA)-salt induced and fructose induced hypertensive rats. In DOCA model, DOCA (15 mg/kg, s.c., twice a week) was administered to unilateral nephrectomized rats for 4 weeks. In fructose model, drinking water was replaced with 10% fructose solution for 6 weeks to induce hypertension. Systolic blood pressure (BP) was measured once every week during the treatment schedule. After completion of treatment schedule, BP and vascular reactivity to various agonists like Noradrenaline, Adrenaline, Phenylephrine and Serotonin (5-hydroxytrptamine; 5-HT) were recorded in rats of both models. A cumulative concentration response curve of 5-HT was carried out in isolated rat fundus strip of the DOCA-salt induced and fructose induced hypertensive rats. The results tend to suggest that HF possesses antihypertensive activity.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF