• Title/Summary/Keyword: Safety-critical System

Search Result 876, Processing Time 0.028 seconds

A Suggestion for Worker Feature Extraction and Multiple-Object Tracking Method in Apartment Construction Sites (아파트 건설 현장 작업자 특징 추출 및 다중 객체 추적 방법 제안)

  • Kang, Kyung-Su;Cho, Young-Woon;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.40-41
    • /
    • 2021
  • The construction industry has the highest occupational accidents/injuries among all industries. Korean government installed surveillance camera systems at construction sites to reduce occupational accident rates. Construction safety managers are monitoring potential hazards at the sites through surveillance system; however, the human capability of monitoring surveillance system with their own eyes has critical issues. Therefore, this study proposed to build a deep learning-based safety monitoring system that can obtain information on the recognition, location, identification of workers and heavy equipment in the construction sites by applying multiple-object tracking with instance segmentation. To evaluate the system's performance, we utilized the MS COCO and MOT challenge metrics. These results present that it is optimal for efficiently automating monitoring surveillance system task at construction sites.

  • PDF

Development of an Hazard Analysis Critical Control Point (HACCP) Application Model for Dried Anchovy Workplace (마른멸치 작업장의 식품안전관리인증기준(HACCP)모델 개발)

  • YOON, Hyun-Jin;HAM, In-Tae;Kim, Sang-Hyeon;CHOI, Jong-Duck
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.3
    • /
    • pp.713-726
    • /
    • 2016
  • This study were attempted to apply the HACCP system adopted in the dried anchovy workplace to ensure the hygiene safety of dried anchovy workplace. In this study, HACCP system procedures, including HACCP team organization, determination of critical control point(CCP), establishment of critical limits, mornitering and verification etc., were established using KFDA 12 procedures. To determine whether hazards were critical elements, we evaluated the likelihood and seriousness of each hazard element. The likelihood of residual microorganism and metal piece exceeding the acceptable limit in dried anchovy products were demonstrated to be a critical hazard element. Management of the boiling(CCP-1B) and metal detection(CCP-2P) were determined to be a critical control point. The standards for acceptable residual microorganism and metal piece were set based on relevant laws and regulations, and then the limits were adapted and established for the CCP. An HACCP plan applicable to dried anchovy workplace was established.

A Study on Reliability Demonstration for Railway Signaling Equipment (철도신호장치의 신뢰도입증에 관한 연구)

  • Shin, Duck-ho;Chae, Eunkyung;Park, Chan-woo;Lee, June-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.4
    • /
    • pp.458-465
    • /
    • 2017
  • The railway signaling system, which controls the course of trains and the distance between trains, is a safety critical system of the railway system because derailment or collision of trains can occur if unsafe failure is generated by any fault. The international standards of reliability, availability, maintainability, and safety of railway applications require that the safety of functions be guaranteed in safety critical systems; system reliability and safety are quantitatively estimated and demonstrated by the failure rates of devices. The development of technology has accelerated the development of railway signaling systems. Existing devices, which have already been verified as to their safety, are applied with special user requirements to reflect the new operation scenario. It is found that the reliability and safety of the devices are different depending on individual application. Therefore, the reliability of the railway signaling system must be considered while complying with the international standards; this requires that the initial failure rate be estimated and demonstrated using fault data gathered over several years. This paper shows a method for demonstrating the initial estimated failure rate and suggests a fault data collection method and an overall process that is based on probability.

A Review of the United Nations' School Disaster Safety (UN 학교재난안전 고찰)

  • Park, Youn-Ju
    • Journal of the Korean Society of School Health
    • /
    • v.29 no.3
    • /
    • pp.140-148
    • /
    • 2016
  • Purpose: This review aims to provide an understanding of the UN recommendations regarding school disaster safety in the context of Korea's school safety system. Methods: Relevant literature and reports on the UN's school disaster safety were investigated. On basis of the analysis, this review closely examined how the UN school disaster safety had been developed and what it had proposed. Results: Major findings from this review regarding the UN school disaster safety were to: 1) utilize "all-hazards approach"; 2) focus on "community-based approach"; 3) explore "education for sustainable development"; and 4) emphasize "informal disaster safety education." Conclusion: This review on the UN school disaster safety may give a critical implication to Korea's school safety education.

Study on Procedure & Management for Railway Signaling S/W Safety Assessment (열차제어 S/W 안전성 평가를 위한 절차 및 관리 방안 연구)

  • Jo, Hyun-Jeong;Hwang, Jong-Gyu;Kim, Yong-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1237-1242
    • /
    • 2008
  • Recent advances in computer technology have brought more dependence on software to train control systems. Hence, the safety assurance of the vital software running on the railway system is very critical task and yet, not many works have been done. While much efforts have been reported to improve the safety of electronic hardware, not so much systematic approaches to evaluate the safety of software, especially for the vital software running on board train controllers. In this paper, we propose the guide line of actually applicable software safety assessment in train control systems. And we demonstrate the results of developing a new tool based on web system version for software assessment management.

  • PDF

A Study on Program Review Model for Human Factors in Railway Industry (철도산업의 안전업무 종사자 인적요인 관리를 위한 검토모델 연구)

  • Kwak, Sang-Log;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2040-2044
    • /
    • 2008
  • Recently, many safety measures are developing for the prevention of human error, which is main factors of railway accident. For the efficient management of human factors, many expertise on design, conditions, safety culture and staffing are required. But current safety management activities on safety critical works are focused on training, due to the limited resource and information. In order to establish railway human factors management, a systematic review model is required. Based on system engineering and nuclear industry model, a program review model is proposed in this study. The model includes operating experience review, task analysis, staffing and qualification, human reliability analysis, huma-system interface design, procedure development, training program, verification and validation, implementation and monitoring. Results can be applied for the review of safety measures relating to human factors.

  • PDF

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

Review of GPS and Galileo Integrity Assurance Procedure (GPS와 Galileo의 무결성 보장 방법 조사)

  • Namkyu Woo;Gihun Nam;Heonho Choi;Jiyun Lee
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.13 no.1
    • /
    • pp.53-61
    • /
    • 2024
  • Global Navigation Satellite Systems are expected to meet system-defined integrity requirements when users utilize the system for safety critical applications. While the guaranteed integrity performance of GPS and Galileo is publicly available, their integrity assurance procedure and related methodology have not been released to the public in an official document format. This paper summarizes the integrity assurance procedures of Global Positioning System (GPS) and Galileo, which were utilized during their system development, through a literature survey of their integrity assurance methodology. GPS Block II assures system integrity using the following methods: continuous performance monitoring and maintenance on Space Segment (SS) and Control Segment (CS), through a cause and effect analysis of anomalies and a failure analysis. In GPS Block III, to achieve more stringent integrity performance, safety requirements are integrated into the system design and development from its starting phase to the final phase. Galileo's integrity performance is provided in the Integrity Support Message (ISM) format, as Galileo utilizes a Dual Frequency Multi Constellation (DFMC) Satellite Based Augmentation System (SBAS) and Advanced Receiver Autonomous Integrity Monitoring (ARAIM) to serve safety critical applications. The integrity performance of Galileo is ensured by using a methodology similar to GPS Block II (i.e. continuous performance monitoring and maintenance on the system). The integrity assurance procedures reviewed in this paper can be utilized for a new satellite navigation system that will be developed in the near future.

FAULT TREE ANALYSIS OF KNICS RPS SOFTWARE

  • Park, Gee-Yong;Koh, Kwang-Yong;Jee, Eunk-Young;Seong, Poong-Hyun;Kwon, Kee-Choon;Lee, Dae-Hyung
    • Nuclear Engineering and Technology
    • /
    • v.40 no.5
    • /
    • pp.397-408
    • /
    • 2008
  • This paper describes the application of a software fault tree analysis (FTA) as one of the analysis techniques for a software safety analysis (SSA) at the design phase and its analysis results for the safety-critical software of a digital reactor protection system, which is called the KNICS RPS, being developed in the KNICS (Korea Nuclear Instrumentation & Control Systems) project. The software modules in the design description were represented by function blocks (FBs), and the software FTA was performed based on the well-defined fault tree templates for the FBs. The SSA, which is part of the verification and validation (V&V) activities, was activated at each phase of the software lifecycle for the KNICS RPS. At the design phase, the software HAZOP (Hazard and Operability) and the software FTA were employed in the SSA in such a way that the software HAZOP was performed first and then the software FTA was applied. The software FTA was applied to some critical modules selected from the software HAZOP analysis.

Development of a design issue management system(DIMS) for human factors engineering in nuclear power plants (원자력발전소의 인간공학 설계 지원을 위한 설계 현안 관리 시스템(DIMS) 개발)

  • 이용희;정광태
    • Journal of the Ergonomics Society of Korea
    • /
    • v.16 no.3
    • /
    • pp.77-87
    • /
    • 1997
  • This paper describes the developement of a Design Issue Management System (DIMS). Although human factors engineering has been recognized as one of the critical activities in the design of man-machine system, it has been hardly successful nor effective in practice to cope with the hyman factors requirements by regulations. For supporting the human factors engineering in nuclear power plants, DIMS ahs three major modules : Design Requirements Data Base, Design Issue Tracking System, Issue Evaluation Support System. These modules function as formal verification architects that the licensing authority requests for verifying the safety of the equip- ment and facilities in nuclear power plants. An example application to an operator support system, named Critical Function Monitoring System, during its independent review of the human factors shows the usage and the benefit of DIMS.

  • PDF