This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.20
no.4
/
pp.523-531
/
2022
The International Atomic Energy Agency (IAEA) entails independent decision-making for the safety supervision of civil nuclear facilities. To evaluate and review the safety of nuclear facilities, the national regulatory body usually consults independent institutions or external committees. Technical Support Organizations (TSOs) include national laboratories, research institutions, and consulting organizations. Support from professional organizations in other countries may also be required occasionally. Most of the world's major nuclear power countries adopt an independent nuclear safety supervision model. Accordingly, China has continuously improved upon the construction of such a system by establishing the National Nuclear Safety Administration (NNSA) as the decision-making department for nuclear and radiation safety supervision, six regional safety supervision stations, the Nuclear and Radiation Safety Center (NSC), a nuclear safety expert committee, and the National Nuclear and Radiation Safety Supervision Technology R&D Base, which serves as the test, verification, and R&D platform for providing consultation and technical support. An R&D system, however, remains to be formed. Future endeavors must focus on improving the technical support capacity of these systems. As an enhancement from institutional independence to capability independence is necessary for ensuring the independence of China's nuclear safety regulatory institution, its regulatory capacity must be improved in the future.
In this study, supervision resides fire mission against problems associated with case studies and surveys done through the side of the field work, technical personnel, fire management, including fire code aspects classified into three kinds of items dealt with the issue. Started at the scene of the problem in terms of performance, the issue of the construction process, mainly dealt with the issue at the time of completion. Fire management side, supervisor of technical personnel, human resources management issues, contract issues, fire code level, the frequent revisions of fire regulations, supervision, processing delays of the resulting report, the problem resides with the expansion of Fire Supervision target was mentioned. Finally, the target for each hierarchical supervision, and resident supervisor of the need for supervision of work performance test was carried out by the correlation.
Journal of the Korea Institute of Building Construction
/
v.24
no.3
/
pp.371-380
/
2024
This study investigated and analyzed overseas construction supervision systems to propose improvements for domestic supervision practices. The findings indicate a need for strengthening the role and responsibility of the ordering organization, sharing the workload and reducing the burden on supervisors, establishing a supervision work evaluation system. By implementing these recommendations, it is anticipated that the quality and effectiveness of construction supervision can be significantly enhanced.
Journal of the Korean Society for Aviation and Aeronautics
/
v.27
no.3
/
pp.90-97
/
2019
The International Civil Aviation Organization(ICAO) recently established the Global Aviation Safety Plan(GASP) for national aviation safety management, along with the enactment of Annex 19, Safety Management System(SMS). ICAO require the establishment of the 'States Safety Programs(SSP)' for countries with excellent safety evaluation, including Korea, and the establishment of aviation safety supervision systems for all Contracting States by 2017 under the enactment of ICAO Annex 19. Required. The Ministry of Land, Infrastructure, and Transport has continuously invested in R&D to secure such aviation safety systematically, and is making efforts to develop and disseminate related technologies by establishing long-term R&D roadmaps. A study on aviation safety supervision among the system-based aviation safety supervision support technology development R&D project, which is underway as part of the aviation safety technology development project of the Ministry of Land, Infrastructure and Transport. We conducted a study to see if this methodology logically guarantees reasonableness.
This study focuses on the trends and issues of improving safety management of elevators in Korea. Frequency and severity of accidents in relation to conditional pass in periodic inspection, maintenance, market surveillance are analyzed based on the statistical data and social cost due to a variety of related fields in managing elevator safety was estimated first. The results of statistical analysis performed in this study will provide logical basis and future direction for improving the safety management system. The role of certification and supervision is particularly addressed to reduce the related accidents and the social cost. The effectiveness of such procedures can be found from the results of simple statistical analysis.
For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.
Journal of the Korea Construction Safety Engineering Association
/
s.37
/
pp.74-83
/
2006
As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, there are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to deep watch the safety operation and prevent any unsafe/fire accidents; the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.
As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, There are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to-Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to keep watch the safety operation and prevent any unsafe/fire accidents. Also the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.
Lee, Seung-Been;Park, Kyung Kyu;Seo, Min Jo;Choi, Won Jun;Kim, Si Uk;Kim, Chee Kyung
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.235-236
/
2023
The process of construction site supervision plays a crucial role in ensuring safety and quality assurance in construction projects. However, traditional methods of supervision largely depend on human vision and individual experience, posing limitations in quickly detecting and preventing all defects. In particular, the thorough supervision of expansive sites is time-consuming and makes it challenging to identify all defects. This study proposes a new construction supervision system that utilizes vision processing technology and Artificial Intelligence(AI) to automatically detect and analyze defects as a solution to these issues. The system we developed is provided in the form of an application that operates on portable devices, designed to a lower technical barrier so that even non-experts can easily aid construction site supervision. The developed system swiftly and accurately identifies various potential defects at the construction site. As such, the introduction of this system is expected to significantly enhance the speed and accuracy of the construction supervision process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.