Railway signaling systems are so vital to ensure the safe operation of railroad and the assurance and demonstration of the safety is so important. The safety management process shall consist of a number of phases and activities, which are linked to form the safety life-cycle. The basic processes of safety management and safety activity throughout the lifecycle are 'risk analysis' and 'hazard control'. The safety managements and activities for the two kinds of aspects are implemented throughout the whole steps of system lifecycle. The risk analyses and hazard controls like those are needed, these activities have to be carried out through the whole of system lifecycle.
Journal of the Korean Society of Marine Environment & Safety
/
v.24
no.1
/
pp.43-55
/
2018
The biggest change in the field of coastal ship safety control since the accident of passenger ship Sewol has been the introduction of the maritime safety supervisor system. With its introduction, the safety control system in coastal passenger ships was changed from consisting of operation managers and marine police to operation managers and a newly-introduced maritime safety supervisor. The safety control system for coastal cargo ships was also converted from relying on ship inspection officers to having a maritime safety supervisor and ship inspection officers. However some negative elements have surfaced due to confusion related to the scope of work in the coastal cargo shipping field. These have been caused by dividing the supervisory agency, a lack of work continuity given non-permanent public official status, low supervisor qualifications overlooking reality, and limitations of the order for improvement to secure seaworthiness. It is essential that the maritime safety supervisor system be solidified to reinforce coastal ship safety control. Therefore, systematic safety control in the coastal cargo shipping industry should be conducted by a single, integrated government agency, and the area covered by the order for improvement to secure seaworthiness should be extended. Also limitations of the supervisor recruitment system due to non-permanent public official status should be simultaneously improved. In addition, it is necessary to upgrade supervisor qualifications to require experience with surveyors of international class, ship captains, and chief engineers.
In this paper, we introduce the estimation method by Risk or SIL(Safety Integrity Level) for the criterion of safety assurance and summarize each application method and target. IEC 62278(EN 50126) which is international standard for the specification and verification of the railway system RAMS indicate a criterion of safety assurance. Especially, it recommend the safety verification by continuous verification as the order of requirement establishment, design, manufacture, installation, operation, and maintenance for the equipment not easy to quantify the operation environment. In this paper, we study the SIL requirement allocation method relating to internal new system development and existing system improvement by analysing SIL recommendations which were used to understand SIL for a train control equipment in 1990s in IRSE and theoretically their allocation background. This paper help the safety management of Korea train control system to develope the quantitative management procedure as international level by analyzing the SIL requirement allocation by operation agency and the right SIL verification procedure by manufacture and indicating the example to assure safety because it is necessary for improvement and localization for the Korea train control system having highly dependence on aboard technology.
This paper discusses the evaluation of the safety impact of the Adaptive Cruise Control (ACC) system in Korea. To evaluate the safety impact, this paper suggests an analysis method by using the test scenario and field operational test data. The test scenario is composed to represent the main component factor of the ACC system and ACC related accident situation such as rear-end collision, lane-change, and road-curvature, etc. Also, from the field operation test data, the system's potential to increase the safety can be measured ideally. Besides, field operational testdata was used to revise the expected safety impact value as Korean road conditions. By using the proposed evaluation method, enhanced safety impact of the ACC system can be estimated scientifically.
This paper describes a coordinated control algorithm for rear-side collision avoidance. In order to assist driver actively and increase driver's safety, the proposed coordinated control algorithm is designed to combine lateral control using a steering torque overlay by Motor Driven Power Steering (MDPS) and differential braking by Vehicle Stability Control (VSC). The main objective of a combined control strategy is twofold. The one is to prevent the collision between the subject vehicle and approaching vehicle in the adjacent lanes. The other is to limit actuator's control inputs and vehicle dynamics to safe values for the assurance of the driver's comfort. In order to achieve these goals, the Lyapunov theory and LMI optimization methods has been employed. The proposed coordinated control algorithm for rear-side collision avoidance has been evaluated via simulation using CarSim and MATLAB/Simulink.
Avoiding the industrial accidents is one of the goals in manufacturing industries from the top manager to the foremen. Therefore all the companies try to prevent occupational accidents using system safety programs in order to increase the productivity. Korean industries have been tended to depend upon historical information to control risks. The other hand, foreign industries have identified risk factors using system safety techniques to predict future risks. This study presents the method to apply the foreign industries risk control technique to the Korean industries.
Proceedings of the Safety Management and Science Conference
/
1999.11a
/
pp.355-363
/
1999
Free from the industrial accident is the goal from top manager to foreman. Therefore all the company try to prevent occupational accident using system safety program in order to increase productivity Korean industries have been tend to depending upon historical information to control risk. The other hand, foreign industries have been Identify risk factors using system safety techniques to predict future risk. Therefore, this study is presented to applying the foreign industries's risk control technique to korean industries.
Proceedings of the Safety Management and Science Conference
/
1999.11a
/
pp.53-72
/
1999
IPQC system was introduced for the flight safety at the age of scientific safety management in the 1980s. In spite of performing this system, aircraft accidents caused by human factors, which were above 70% among all flight accident factors, have not been reduced. Accordingly, throughout this paper I analyzed the aircraft accident factors by means of a literature study and a pilot survey. Then, based on the notion of TQC(Total Quality Control), I hierarchically classified Individual Quality into Capacity Management, Safety Management, and General Management and did the low-ranked management factors as well. AHP (Analytic Hierarchy Process), one of the scientific management methods, was used for estimating the relative importance of Individual Quality Control factors and the heavy aircraft accident causes over the last 20 years were analyzed according to the flight ranks. Based on the comparative analysis of results derived above, an IPQC model as flight ranks is established. In short, according to this newly suggested model we can obtain the maximum flight safety with the preventive actions against aircraft accidents caused by human factors and by improving the operation effect under the reasonable pilot management.
Chemicals Control Act have been strengthened to control more safely hazardous chemicals from 2015. In particular, the standards for the installation and management of handling facilities was enhanced with specific regulations depending on type of the facilities and the hazardous chemicals. However, some standards for handling facilities caused difficulties in implementing the strengthened standards due to various field conditions, such as lack of physical space. The Ministry of Environment is implementing Safety Assessment System (SAS) to solve these problems since 2018. However, many plants have difficulties in preparing alternative methods to pass the safety evaluation. The purpose of this study was to review and analyze the SAS and to suggest alternative measures in terms of management and technical aspects through the case study of hydrochloric acid storage tanks. The following safety solutions were suggested for handling facilities that had insufficient the space and capacity for the retaining wall due to physical space. Firstly, insufficient space was resolved by introducing equipment relocation or demolition, and retaining wall expansion. Secondly, the wall of the surrounding buildings was used as an alternative to the retaining wall with additional chemical resistant treatment. Finally, sensor installation and facility inspection were suggested as ways to improve chemical safety. Therefore, improvement of chemical accident prevention system is required not only in terms of facilities supplementation but also management aspect. The results of this study are expected to be available for similar facilities and will be based on the preparation of additional safety assessment as alternatives measures in the future.
Seismic response control method of the bridge structures with semi-active control device, i.e., magneto-rheological (MR) damper, is studied in this paper. Design of various kinds of clipped optimal controller and fuzzy controller are suggested as a semi-active control algorithm. For determining the control force of MR damper, clipped optimal control method adopts bi-state approach, but the fuzzy control method continuously quantifies input currents through fuzzy inference mechanism to finely modulate the damper force. To investigate the performances of the suggested control techniques, numerical simulations of a multi-span continuous bridge system subjected to various earthquakes are performed, and their performances are compared with each other. From the comparison of results, it is shown that the fuzzy control system can provide well-balanced control force between girder and pier in the view point of structural safety and stability and be quite effective in reducing both girder and pier displacements over the existing control method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.