• Title/Summary/Keyword: Safety Risk Management

Search Result 2,153, Processing Time 0.033 seconds

A Study on a Product Safety Management Program Based on Risk Management Standards (리스크 관리규격에 기초한 제품안전 경영 프로그램에 대한 연구)

  • Lee, Dhong-Ha;Na, Yoon-Gyun;Kim, Myung-Soo
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.94-102
    • /
    • 2003
  • This study proposed a method to apply risk management standards to a product safety management program and reviewed cases where a risk management cycle is applied to the product safety management program. Comparing the four product safety management programs suggested by several authors yielded common features of the risk management cycle: (1) organization for product safety, (2) risk identification, (3) risk evaluation, (4) risk treatment, (5) monitoring/communication, and (6) documentation. A Japan company(Ricoh)'s case showed that the risk management cycle to treat product liability risks can be used as a successful product safety management program.

Application of Risk Management Standards for Product Safety Management Program (리스크 관리규격의 제품안전경영프로그램에 대한 적용)

  • 이동하;나윤균;김명수
    • Journal of Applied Reliability
    • /
    • v.1 no.2
    • /
    • pp.109-120
    • /
    • 2001
  • This study reviewed the national standards for risk management to judge whether they are suitable for a product safety management program. Among the standards issued from Australia, New Zealand, Canada, Japan, and UK, the risk management guideline (AS/NZS 4360: 2000) issued jointly from both Australia and New Zealand have better features for product safety management program than any other risk management standards in view point of broad definition of risk concept including opportunities of loss and gain, stepwise composition of management processes applicable iteratively, and integrable form of structure addible to existing management practice. Comparing the three product safety management programs suggested by several authors yielded common features of product safety management program model: (1) organization for product safety, (2) risk identification, (3) risk evaluation, (4) risk treatment, (5) monitoring/communication, and (6) documentation. All of these activities can be performed within risk management framework proposed by AS/NZS 4360.

  • PDF

A Study on Factory Building Fire Risk Reduction Management (공장건물의 화재리스크 경감방안에 관한 연구)

  • Chung, Eui-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.43-53
    • /
    • 2008
  • This study is carried out for the fire safety of the factory building, the fire risk reduction measure in compliance with an example approached in fire risk reduction systematically, contribute to reduce the fire risk. The analytical fire risk process of discovering, identifying, estimating and evaluating risk and control measure as risk reduction measures are core concept, applies loss prevention with loss control techniques. The painting process in the workplace where the fire hazard and death accident accompanies coexists. Loss prevention problem of creation prevention of dangerous atmosphere at workplace is health and human services problem of normal circumstances, must be inspected with problem of combustible gases at the time of fire explosion. Static electricity measure accomplished the risk control process thoroughly as the fire risk reduction process model with the ignition sources measure which is presented. Fire risk from within organizing will be able to classify with each field by detailedly but risk treatment process will be able to apply basically all the same concept. Consequently about risk management example from before, this study is proposed risk management techniques that standardized rightly in the actual condition of organization with one plan, with discovery of fire risk, the feedback process in compliance with a fire risk reduction and the review which control the result is joint responsibility of engineer, technical expert and manager as part of safety management to practice with the fact must be supervised.

The Study of Risk Matrix Development for Urban Metro EMU (도시철도차량 적용을 위한 위험도 매트릭스 개발에 관한 연구)

  • Kim, Young-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.6
    • /
    • pp.111-117
    • /
    • 2011
  • Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.

Risk Management Standards As a Product Safety Management Program (제품안전경영프로그램으로서의 리스크 관리규격)

  • 이동하
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.376-383
    • /
    • 2001
  • This study reviewed the national standards for risk management to judge whether they are suitable for a product safety management program. Among the standards issued from Australia, New Zealand, Canada, Japan, and UK, the risk management guideline (AS/NZS 4360: 2000) issued jointly from both Australia and New Zealand have better features of product safety management program such as a broad definition of risk concept including opportunities of loss and gain, stepwise composition of processes applicable iteratively, and integrable composition of processes for the existing other management practice. Comparing the three product safety management programs suggested by several authors yielded common features of product safety management program model: (1) organization for product safety, (2) risk identification, (3) risk evaluation, (4) risk treatment, (5) monitoring/communication, and (6) documentation. All of these activities can be performed within risk management framework.

  • PDF

Risk Management Qualitatively on Railway Signal System

  • Zhang, Ya-Dong;Guo, Jin
    • International Journal of Railway
    • /
    • v.2 no.3
    • /
    • pp.113-117
    • /
    • 2009
  • Risk management is an important part of system assurance and it is widely used in safety-related system. Railway signal system is one kind of safety-related system and its most important goal is to guarantee the safety of railway system. The method based on risk management can find and solve the security issues of railway signal system more effectively. This paper introduces the basic conception of risk management, studies the whole process of risk management and related tools and techniques and discusses some key points qualitatively combining with the particularity of railway signal system.

  • PDF

The Development of a Risk Management System in the Field of Industrial Safety in the Republic of Kazakhstan

  • Kudryavtsev, Sergey S.;Yemelin, Pavel V.;Yemelina, Natalya K.
    • Safety and Health at Work
    • /
    • v.9 no.1
    • /
    • pp.30-41
    • /
    • 2018
  • Background: The purpose of the work is to develop a system that allows processing of information for analysis and industrial risk management, to monitor the level of industrial safety and to perform necessary measures aimed at the prevention of accidents, casualties, and development of professional diseases for effective management of industrial safety at hazardous industrial sites. Methods: Risk assessment of accidents and incidents is based on expert evaluations. Based on the lists of criteria parameters and their possible values, provided by the experts, a unified information and analytical database is compiled, which is included in the final interrogation questionnaires. Risk assessment of industrial injuries and occupational diseases is based on statistical methods. Results: The result of the research is the creation of Guidelines for risk management on hazardous industrial sites of the Republic of Kazakhstan. The Guidelines determine the directions and methods of complex assessment of the state of industrial safety and labor protection and they could be applied as methodological basis at the development of preventive measures for emergencies, casualties, and incidents at hazardous industrial sites. Conclusion: Implementation of the information-analytical system of risk level assessment allows to analyze the state of risk of a possible accident at industrial sites, make valid management decisions aimed at the prevention of emergencies, and monitor the effectiveness of accident prevention measures.

On the Risk Management System in Construction Industries (건설 분야 리스크 경영 시스템 구축)

  • 김종걸;박용수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.277-281
    • /
    • 2004
  • The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.

  • PDF

Guidelines for Risk Management and Analysis (리스크 관리 및 분석 지침)

  • Choi Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.513-523
    • /
    • 2006
  • This paper is to introduce guidelines for risk management and analysis. International tandards such as IEC 60300-3-9, IEC 61511-3, ISO 14971-1 and ISO/IEC Guide 73 are considered. This study is to discuss risk analysis of technological systems, and guidelines in the application of hazard and risk analysis for functional safety instrumented system, and risk management of medical devices, and guidelines for use in risk management standards.

  • PDF

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

  • Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
    • Safety and Health at Work
    • /
    • v.2 no.2
    • /
    • pp.105-121
    • /
    • 2011
  • Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.