• Title/Summary/Keyword: Safety Management Improvement Plan

Search Result 302, Processing Time 0.027 seconds

A study on the Residential Satisfaction and Demands for the Comprehensive Apartment Improvement Planning (공동주택 거주자의 주거환경 만족도 및 개선요구를 통한 공동주택 장기수선 계획 연구)

  • Yoon Chung-Sook;Kim Soo-Jeong;Shin Soo-Young;Kim Suk-Kyung;Abrams Robin F.
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.37-46
    • /
    • 2006
  • The primary purpose of this study is to provide the managerial guidelines for the comprehensive apartment improvement planning. This plan will consider the time-serial apartment management plan. Through a questionnaire survey, residential satisfactions and demands on apartment units, apartment building and site amenities were investigated. Based on the statistical analysis, residents' demands were assessed. The resident groups were categorized into the three groups considering the apartments' life span where they were living. The results from the statistical analysis were finally compared with the long-term apartment management plan demonstrated in the Housing Code of the Ministry of Construction and Transportation. The major findings of this study were as follows. First, residential satisfaction on the equipments in apartment units was higher than that on the unit plans. Residents' satisfaction on the communal facilities in apartment sites was lower than that on the other factors. Thus, apartment unit plans and communal facilities in sites need to be improved. Second, though we had the three residents' groups, for the results of the residential satisfaction, the groups were divided into two groups: 'less than 10 years group'and 'over than 10 years group'. Considering the residents' demands for the apartment improvement according to the life span of apartment complexes, the habitability factor was demanded by 'the less than 10 years group' and the safety factor by 'the over than 10 years group'. Compared the residents' demands for apartment improvements with the long-term apartment management plan demonstrated in the Housing Code, the improvement cycles demanded by residents were shorter than those in the code. Thus, the management plan in the code should be reconsidered.

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

A study on the safety improvement and productivity's increase through continuous preventive maintenance. (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.131-141
    • /
    • 2004
  • This study deals with the procedure of safety improvement, productivity increase, and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind, the necessity, and the concept of preventive maintenance, and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss, comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

  • PDF

A Study on the Improvement of Safety Management of Plan/Order, Design, and Construction Business Management (기획·발주, 설계, 건설사업관리 부분의 건설안전관리 향상에 대한 연구)

  • Yoon, H.K.;Kwon, Y.J.;Oh, B.H.;Gwon, Y.I.;Yoon, Y.G.;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.56-63
    • /
    • 2020
  • The government has established various policies focusing on accident prevention to reduce the accident rate in the construction industry, but the effect is still insignificant. These results allude that there are still many problems in terms of usability. Although construction safety accidents usually have characteristics that occur during construction, the laws and systems should include the pre-construction cycle (plan/order - design - construction business management- construction) to eliminate risk factors in advance. The purpose of this study is to analyze the performance evaluation of the construction safety system before construction rather than during construction. In the pre-construction phase (plan/ order-design-constuction business management), we intend to investigate and analyze measures to prevent safety accidents and identify a system that lacks the ability to implement. Specifically, we analyzed what to focus on as precautionary measures in the planning, ordering, designing, and supervising. To improve them, we made a questionnaire based on the role related to construction safety for each subject, and seek implications for lack of performance through interviews. Based on the results, some ways to improve the safety system were proposed.

A Study on the Problem and Improvement of Safety and Maintenance Management (국내 안전 및 유지관리의 문제점 및 개선방안에 관한 연구)

  • Kim, Sun Woong;Ahn, Kye Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.101-106
    • /
    • 2009
  • In order to build an effective management system for structures and to propose national policy and vision for advance of safety and maintenance management, 'Fundamental Scheme of Safety and Maintenance Management for Structures' has been established and promoted. As developed countries adopt preventive maintenance management, which is preventive as well as aggressive repair/strengthening for structures, it is needed to introduce life-cycle analysis method for improvement of economical efficiency. Therefore, this paper presents not only analysis of domestic conditions and problems related to system for safety and maintenance management, policies and costs for structures but an improvement plan.

A Study on Problems and Improvement of Disaster Prevention Technology Guidance(Focused on construction disaster) (재해예방 기술지도의 문제점과 개선방안에 관한 연구 (건설 재해를 중심으로))

  • Roh, Tae-Woo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.4
    • /
    • pp.47-55
    • /
    • 2016
  • Recently, industrial accidents rate has been gradually decreasing due to the development of safety management methods, but until now, the accident rate in the construction sector is higher than other industries. Large-scale construction sites are operating systematic safety systems to reduce industrial accidents. However, small and medium sized construction sites do not have systematic safety system and lack safety management ability, so that disaster is not reduced compared with large scale construction site. As a result, disaster prevention technology instruction system has been implemented to reduce the disasters of small and medium scale construction sites. However, in the case of a small construction site less than 2 billion won, there is little decrease in the accident rate, and in some cases, the accident rate increases. After the technical guidance system has been implemented, it is necessary to identify the performance and problems of implementation and to improve its effectiveness. In this study, we suggest the improvement plan to improve the efficiency of the technical guidance system by analyzing the problems and actual conditions of technical guidance operation in small and medium sized construction work sites.

An Improvement Plan on Fire Safety Management of Public Institutions: Focusing on the Case of Elementary and Secondary Schools (공공기관 소방안전관리 실태조사를 통한 개선방안에 관한 연구 : 초·중등학교를 중심으로)

  • Han, Sang-Pil
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.85-90
    • /
    • 2020
  • The aim of this study is to identify ways to improve fire safety management of elementary and junior high schools, which can prevent potentially dangerous situations and establish a rapid response system for fire-related emergencies by analyzing existing fire safety management public institutions. We investigated the expertise, prevention ability, preparation ability, and operation form of fire safety managers working in elementary and secondary schools in Kangwon Province. A questionnaire composed of 26 items was completed by 238 fire safety managers. Results shows that the perception of fire safety management is considerably high, while the ability of the fire safety manager to prepare for and cope with an accident still needs improvement.

Requirements Improvement Plan of Professional Engineer License for International Mutual Accreditation (국가간 상호인증을 위한 기술사 자격의 취득요건 개선방안)

  • Cho, Mun-Son;Yang, Sung-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.5
    • /
    • pp.157-165
    • /
    • 2007
  • Currently, there are two major problems in professional engineer(PE) licensure system in Korea to be accredited internationally. One is a incompleteness of system connecting the licensure and the accredited engineering education program and the other one is a insufficient working experience condition required for achieving PE license. Therefore, these two problems are setbacks hindering Korea's PE license accredited internationally. In this study, international tendency stream on mutual accreditation of PE license are reviewed first, and the PE licensure system of the major countries are compared and analyzed. Based on the results, requirements improvement plan are suggested and the gradual implementation method are suggested also.

Design and Operation of Value Stream Mapping (VSM 설계와 운영방안)

  • Choi, Sung-Woon;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.149-157
    • /
    • 2006
  • This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)

A Study on the Improvement Scheme of Quality Management System for Shipping & Port Operation Company (해운항만업체의 품질경영시스템 개선방안에 관한 연구)

  • Ahn, Ki-Myung;Hong, Sog-Min;Kim, Hyun-Duk
    • Journal of Navigation and Port Research
    • /
    • v.30 no.8 s.114
    • /
    • pp.675-683
    • /
    • 2006
  • From Quality Management System in early 1990, through Safety Management System in 1998, to Maritime Security System in 2002, the shipping/port industries had no choice but to accept such management systems as occasion demands or compulsory in recent 10 years. Furthermore some companies have introduced other system such as Environment Management System(ISO 14000), Occupational Health & Safety Assesment Series(OHSAS 18000) additionally. But most companies have introduced & implemented the quality, safety & security management system generally. This paper is to suggest the effective measurement & improvement plan of Quality Management System.