• Title/Summary/Keyword: Safety Improvement Project

검색결과 212건 처리시간 0.021초

Analysis of Improvement Methods of Safety Management Guidelines with Design for Safety

  • Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.602-603
    • /
    • 2015
  • Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.

  • PDF

댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석 (Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis)

  • 유승훈;이광만;이을래
    • 한국수자원학회논문집
    • /
    • 제44권9호
    • /
    • pp.765-776
    • /
    • 2011
  • 댐이 건설된 이후 댐직하류 하천구간은 하천구역내 사유지 경작과 하상주차장 등의 입지, 사주가 발달하여 하폭감소에 의한 문제가 발생하였다. 특히 하천정비의 미흡으로 홍수시 하천통수능력이 감소하여 유역전반에 영향을 미치고 있다. 댐 운영조건도 일부 제약을 받고 있는데 이의 해소를 통한 댐 기능의 회복과 운영의 효율성 제고가 하천의 치수 안정성 확보와 함께 개선대책이 필요하였다. 따라서 댐 운영관리개선과 연계된 댐직하류 하천정비사업이 시행되고 있는데 사업의 타당성, 경제적 편익, 비용배분 및 투자비 회수방안 등과 같은 문제점이 제기되었다. 아울러 댐사업자가 하천사업을 주관한 사례가 없어 이들 사업에 대한 경제성 평가의 객관적 해석과 편익에 대한 정량화 방법의 개발이 요구되었다. 본 연구는 댐직하류 하천정비사업의 사업주체(국가와 용수 및 발전사업자 등)간의 합리적인 건설비용 배분방법을 제시하고 그 적정성을 평가하고자 하였다. 평가결과, 시범 적용 3개 댐의 경제적 편익은 14,405.8백만원/년으로 추정되었고, 편익 중 사업시행자인 K-water의 재무적 가치는 40%, 정부의 공공성 편익은 60%로 분석되었다.

안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구 (A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety)

  • 김도수;김백중;신윤석
    • 한국건축시공학회지
    • /
    • 제19권6호
    • /
    • pp.557-566
    • /
    • 2019
  • 건설업은 국내 산업 중 안전사고가 가장 많이 발생한다. 건설업의 재해는 막대한 재산손실과 인명피해로 인한 사회적 문제로 이어지기 때문에 더 각별한 주의를 기울여야 한다. 최근 이로 인해 건설업에서 발생하는 재해에 대한 경각심이 높아지고 있으며 정부 각 부처에서는 안전관리에 관한 규정을 강화하고 있다. 특히 산업안전보건공단에서는 이번 산업안전보건법 전부개정안에서 보호대상의 확대와 책임 소재의 명확화에 중점을 두고 있다. 이에 따라 발주자 책임강화에 따른 건설사업관리자 선정 시 안전을 고려하는 요인 중심으로 분석한 연구가 필요한 실정이다. 따라서 본 연구에서는 먼저, 성장하고 있는 건설사업관리 시장에 비해 증가하고 있는 건설재해에 대한 저감 대책 중 하나인 산업안전보건법 전부개정법률을 참고하였고, 다양한 건설사업의 특성과 안전 요인을 고려하지 않은 획일화된 건설사업관리용역업자 사업수행능력 평가기준을 개선하기 위해, 발주자의 입장에서 건설사업관리자를 선정할 때 안전에 대한 항목을 참고할 수 있도록 관련 요인을 도출하고 중요도를 분석해 새로운 평가의 기준점을 제시하고자 한다. 이를 위해 법령, 국내 논문 및 문헌, 해외 사례 등을 바탕으로 기존 연구와 문헌을 고찰하고, 전문가 면담을 통해 항목을 선정하였다. 선정된 항목은 4가지 상위요인 그룹으로 분류하여 총 19가지의 하위요인으로 정리하여 공공기관 및 민간사업 잘주처 관계자 및 건설사업관리업 종사자, 안전관리자에게 쌍대비교설문을 실시하였다. 수집된 설문조사 결과 데이터를 바탕으로 계층 분석적 방법인 AHP기법을 활용하여 상대적 중요도를 비교하고 우선순위를 분석해 최종적으로 안전을 고려한 건설사업관리 사업수행능력 평가기준에 필요한 요인을 도출하였다. 본 연구의 결과가 발주자 입장에서 건설사업관리자를 선정함에 있어 안전관리 요인을 고려할 수 있도록 도움이 되고 건설 산업 전체의 재해 저감에 기여할 수 있는 기초적인 자료로 활용되기를 기대한다.

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.92-96
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems (e.g., resources constraints, a lack of formalized management structures, low level of management safety commitment etc.). In order to understand causal interdependencies between safety factors at different system levels (regulation, organization, technical and individual), this paper aims to develop a system dynamics (SD) model of safety management in small construction companies. The purpose of the SD model is to better understand why small construction companies have low level of safety performance. A causal loop diagram (CLD) was developed based on literature, with an attempt to map causal relationships between variables. The CLD was then converted into stock and flow diagram for simulation. Various tests were conducted to build confidence in the model's ability to represent the reality. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

  • PDF

연안개발사업 유형에 따른 해양환경영향평가 개선방안 (Improvement for Marine Environmental Impact Assessment on the Coastal Development Project Type)

  • 김인철;전경암;김귀영;엄기혁;김영태;최보람
    • 해양환경안전학회지
    • /
    • 제20권2호
    • /
    • pp.157-164
    • /
    • 2014
  • 본 연구에서는 2010년부터 2013년까지 4년간 연안개발사업에 따른 일반해역이용협의서 133건을 분석하여 사업유형별 해양환경영향평가 개선방안을 제시하였다. 침식방지사업은 정확한 침식원인 분석이 선행되어야 하고 주변 해안의 상태와 구조물 설치 시 추가적인 문제점 발생 가능성에 대해 정확히 예측해야 하며, 사업시행 후 사후모니터링을 통한 침식방지 효과를 입증하는 체계적인 시스템이 마련되어야 한다. 호안 및 해안도로 건설사업의 경우, 무분별한 해안도로의 건설은 지양하고 구조물 안정성을 충분히 검토하여야 하며 반사파 증가에 따른 해안침식의 문제점을 함께 검토해야 한다. 그리고 침수방지 사업은 평가항목에 파랑을 선정할 필요가 있고 이상 파랑의 영향을 함께 고려해야 한다. 친수공간 조성사업은 종합적이고 체계적인 공간계획이 수립되어야 하고, 자연환경을 최대한 보전하고 자연과 융화될 수 있는 개발이 될 수 있도록 검토를 강화해야 할 것이다. 아울러 연안개발사업과 관련하여 많은 문제점이 내재되어있어 법 제도적 측면에서의 지원과 함께 추후 해역별, 사업별 특성이 다양하게 반영된 추가적인 연구가 필요할 것으로 판단된다.

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권4호
    • /
    • pp.1-6
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems. This paper aims to better understand the complexity and dynamics of safety management in small construction companies. A system dynamics (SD) model was built in order to capture the causal interdependencies between factors at different system levels (regulation, organization, technical and individual) and their effects on safety outcomes. Various tests were conducted to build confidence in the model's usefulness to understand safety problems facing small companies from a system dynamics view. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

하도습지의 생태보전 및 치수를 고려한 하천관리 방안 연구 (Study on River Management Plan Considering Ecological Preservation and Flood Control of Riverine Wetland)

  • 안병윤;김택민;홍승진;김길호;김수전;김재근;김형수
    • 한국습지학회지
    • /
    • 제16권4호
    • /
    • pp.463-476
    • /
    • 2014
  • 하천변에 위치한 하도습지는 치수사업을 통한 치수가치와 하도습지의 생태적 보전가치가 대립함으로써 사회적 갈등을 야기하고 있다. 본 연구에서는 하도습지의 치수가치와 생태가치에 대한 경제성 분석을 통해 두 가치 모두의 중요성을 확인하였으며, 이러한 결과를 바탕으로 치수안전과 생태보전을 고려한 하도습지 관리방안을 제시하고자 하였다. 이를 위해 다차원 홍수피해산정방법(MD-FDA)과 조건부가치측정법(CVM)을 이용하여 임진강 하구유역의 연평균 홍수피해액과 하도습지의 생태보전가치를 산정하였다. 분석결과, 임진강 하구지역은 치수사업도 필요하고, 하도습지의 생태적 보존가치 역시 중요하여 단계별 치수사업과 하도습지의 보호를 위한 관리방안 수립이 필요한 것으로 나타났다. 그 결과 임진강 하도습지는 지속적으로 퇴적이 발생하고 홍수위가 상승하는 지역으로 분류되었다. 이를 바탕으로 임진강 하구는 하천정비사업 시 치수안전과 생태보전을 함께 확인하며 진행하는 것이 필요하고, 생태계 교란을 최소화하기 위한 단계적인 하천정비시행이 바람직할 것으로 판단되었다. 본 연구에서 도출된 결과를 토대로 향후 치수사업과 하도습지의 보존을 함께 고려한 하천관리방안 수립을 위한 기초자료로 활용 될 수 있을 것으로 기대된다.

SPI 신뢰성 확보를 위한 SPICE 기반 6시그마 적용 사례 연구 (A case study of 6sigma application for the reliability in SPI based on SPICE)

  • 김종기;서장훈;박명규
    • 대한안전경영과학회지
    • /
    • 제7권4호
    • /
    • pp.141-163
    • /
    • 2005
  • The international SPICE (Software Process Improvement and Capability determination) Project ISO/IEC 15504(SPICE : Software Process Improvement and Capability determination) is an emerging International Standard on SPA(Software Process Assessment). A prime motivation for developing this standard has been the perceived need for an internationally recognized software process assessment framework that pulls together the existing public and proprietary models and methods. A SPICE assessment can be considered as one of representative SPA model since assessors assign ratings to indicators and metrics to measure the capability of software process. But this models doesn't provide a systematic measurement procedures and dynamic method for SPI(Software Process Improvement). Through the evaluation of SPICE is capable of providing a substantiated basis for using the notion of capability, as well as providing information for nacessary improvements to the standard using 6sigma process. As a result, this paper propose a measurement procedure and guidelines for application of 6sigma process to guarantee the reliability in SPI and suggest the structure to support SPI on overall organization.

불확실성을 고려한 연피해 기대치 산정 (Expected Annual Damage Estimation with Uncertainty)

  • 김형수;김유진;이지원
    • 한국습지학회지
    • /
    • 제5권1호
    • /
    • pp.41-52
    • /
    • 2003
  • The flood damage reduction studies have been performed by the channel improvement plan and the levee has mainly constructed with the freeboard concept. However, the freeboard concept might be an inappropriate choice as a safety factor of the levee because many uncertainties are involved in the procedure of the channel improvement plan studies. So, we considered the uncertainties In the discharge-probability, stage-discharge, and stage-damage functions and estimate the expected annual damage. The Monte Carlo technique for uncertainty analysis is used. As our results, the expected annual damage with uncertainty shows the larger value than without uncertainty. Since the expected annual damage with uncertainty already considers the safety factor it is the proper result. However, the expected annual damage without uncertainty does not consider the safety factor yet. Thus, if the expected annual damage without uncertainty considers the freeboard concept, it could be compared with the expected annual damage with uncertainty for the evaluation of the overestimation or underestimation of the levee construction.

  • PDF

터키 유라시아 터널 프로젝트에 대한 사례연구 (A Case Study on Turkey Eurasia Tunnel Project)

  • 김도형;방규민;전기찬;김동현;김택곤
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.58-69
    • /
    • 2010
  • Turkey Eurasia Tunnel Project is large scale road construction project of which the total length is 14.6km. The subsea shield TBM tunnel will be constructed under Bosphorus strait and the project site is in poor condition as composite ground, high water pressure and earthquake. The design procedure of subsea tunnel was introduced with tender design materials. That procedure contains tunnel type, TBM type and the principal design items considering geological condition such as high water pressure, composite ground and seismic area. This paper states the progress for geotechnical investigation, seismic analysis and TBM tunnel design. Analysis for geotechnical investigation is in progress, aseismatic design is going on stability study for liquefaction and structure. In addition, the performance of shield TBM to be considered such as advance rate and improvement of TBM was reviewed. The plan of fire safety was also reviewed with respect to fire protection.

  • PDF