• Title/Summary/Keyword: Safety Estimation

Search Result 1,647, Processing Time 0.029 seconds

The Comparison of Behavior by Instrumentation and Numerical Analysis on Non-Weir Concrete Dam (콘크리트댐 비월류부 수치해석과 계측결과 비교)

  • 임정열;오병현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.392-395
    • /
    • 2003
  • In this study was compared with result of instrumentation and numeral analysis of non-weir of concrete dam to prepare a plan for total safety estimation method such as reliability estimation of numerical analysis result, characteristics of dam behavior and etc. The results of instrument analysis of displacement and stress on N.H.W.L was similar to that of numeral analysis.

  • PDF

A Study on Fatigue Safety Estimation of Cross Frame of Suspension Bridge(I) - Estimation by Nominal Stress - (현수교 횡프레임의 피로안전성 평가에 관한 연구(I) - 공칭응력에 의한 평가 -)

  • Kyung, Kab Soo;Jeon, Jun Chang;Su, Seok Ku;Yong, Hwan Sun
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.4 s.41
    • /
    • pp.397-407
    • /
    • 1999
  • In this paper, the fatigue safety in the suspension bridge is investigated by using nominal and variable stress, respectively. The technique on structural modeling and the fatigue evaluation using nominal stress are mainly dealt with in this paper. To make the finite element analysis model reflecting the actual structural behavior of the suspension bridge with cross frame, the parametric study is carried out. In this study, the influence of supporting condition. the difference of the results of 2- and 3-D analysis and the number of cross frames modelled in are considered. The nominal stress under the real traffic flow of the bridge is calculated by the combination of the stresses due to the unit DB-24 loading. The nominal stresses for details under consideration are compared with allowable stress ranges specified in the codes and the results are discussed.

  • PDF

Comparison Analysis of Donor Liver Volumes Estimated with 3D Magnetic Resonance and 3D Computed Tomography Image Data

  • Kim, Myeong-Seong;Park, Kyeong-Seok;Cho, Jae-Hwan
    • Journal of Magnetics
    • /
    • v.19 no.3
    • /
    • pp.261-265
    • /
    • 2014
  • Three-dimensional computed tomography is an effective tool to estimate the liver volume of living donors for the live liver transplantation. When additional operation is required, magnetic resonance imaging is conducted to determine the safety of the donor. This study compared the accuracy of magnetic resonance imaging and computed tomography in estimating 3D liver volume of 23 male and 7 female donors who underwent both magnetic resonance imaging and computed tomography tests before the transplantation. The analysis was conducted to see whether the liver's estimated total volumes and the left lobe volumes obtained from 3D-magnetic resonance imaging and 3D-computed tomography were identical. Volumes of the right lobe estimated with 3D-magnetic resonance imaging and 3D-computed tomography were compared with the actual volume of the right lobe harvested in the operating room because the volume of the right lobe is an important determinant in the safety of the donor. The total volume of the liver estimated from 3D-magnetic resonance imaging and 3D-computed tomography differed (1238.1904 units and 1402.364 units respectively). The left lobe volume of the liver estimated with 3D-magnetic resonance imaging and 3D-computed tomography also differed (450.530 units and 554.490 units, respectively). The right lobe volume of the liver estimated with 3D-magnetic resonance imaging and 3D-computed tomography were 787.660 units and 847.545 units, respectively, while the actual average right lobe volume of the harvested liver was 678.636 units. 3D-computed tomography has been widely used to estimate the right lobe volume of the donors' liver. However, 3D-magnetic resonance imaging was also very effective in estimating the volume of the liver. Thus, 3D-magnetic resonance imaging is also expected to become an important tool in determining the safety of the donors before transplantation.

The State Estimation by Unknown Disturbance Observer of Underwater Vehicle System for Robust Control (강인한 제어를 위한 수중이동시스템의 상태추정에 대한 연구)

  • Lee, Jin-Woo;Kim, Hwan-Seong;An, Young-Joo
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.4
    • /
    • pp.169-175
    • /
    • 2003
  • In this paper, and estimation method for estimating the states of underwater vehicle systems with external unknown disturbance is proposed. First, the dynamics of underwater vehicle are induced by Taylor series expansion in the vertical plane and horizontal plane, respectively. For constructing the system model, the external efforts, i.e., the sea surface disturbances, the current, wave and etc., are regarded as external unknown disturbances. Thus the disturbance is added as external input into state-space form of underwater vehicle system. To estimate the state of systems with unknown disturbance, a disturbance observer which does not effected the external unknown input is proposed, and the existence condition for the observer is given. Finally, the effectiveness of the proposed disturbance observer for robust control of underwater vehicle systems is verified by using numerical simulation.

A Study on the Development of Taxi Safety Support System Using the Beacon Device (비콘 단말기를 이용한 택시안심이용시스템의 구현에 관한 연구)

  • Kim, Yong-Tae;Kim, Jin-Man
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.26 no.6
    • /
    • pp.452-457
    • /
    • 2016
  • In this paper, we propose a taxi safety support system using the beacon device to reduce the anxiety and increase the satisfaction of taxi passengers. At first, we design a USB-type low power beacon device that can be easily installed inside a taxi and propose a distance and estimation method using beacon signal strength. Mobile applications for passengers and drivers based on beacon signals are developed. The server operation program for situation recognition, position estimation, risk management and notification of the taxi passenger is also developed. An accident risk management method is proposed using the recognition of getting on and off of the taxi passenger. The proposed methods are verified for applicability and usefulness through practical experiments.

Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment (QRA를 이용한 철도터널 방재 안전성 평가)

  • Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.357-367
    • /
    • 2006
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Application of Structure Maintenance and Management Using GIS (GIS를 이용한 구조물 유지관리 적용)

  • Lee, Jong-Chool;Kim, Hee-Gyoo;Roh, Tae-Ho;Nam, Shin
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.10a
    • /
    • pp.291-295
    • /
    • 2003
  • For rapid development of science and economic growth, modern constructs are higher and large in order to use confined areas efficiently. Also, it is very important to manage efficient data for safety and maintenance of those constructs. The estimation for structural safety can be evaluated by structural durability and safety using data which surveys various elements. So, it should be based on synthetic and efficient data which includes various elements with related safety of those structures. Then, it will be managed properly and economically. Accordingly, in this study, we would approach efficient maintenance management using the GIS with data from structural-safety diagnosis.

  • PDF

The Mechanical Properties Evaluation on Lay-up Orientation Effect of CFRP Laminate Composite with the Hole Notch (원공노치를 가진 CFRP의 적층방향에 따른 기계적 특성 평가)

  • Tae, Young-Il;Yun, Yu-Seong;Kwon, Oh-Heon
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.1
    • /
    • pp.25-32
    • /
    • 2002
  • The tensile tests for [0/90]s, [90/0]s, and $[0/{\pm}45/90]s$ laminate composite were accomplished with acoustic sensor and failure processes were recorded by a video camera in real time. Also SEM examinations for fracture and side surface were carried out. The purpose of study is estimation of the failure mechanism and the mechanical properties effected by lay-up orientation for CFRP laminate composite with the hole notch. From the results, mechanical properties were obtained and they are similar between two kinds of cross-ply orientation in CFRP laminate composites, but not on $[0/{\pm}45/90]s$. And accordings to increasing the load, accumulate AE count was increased, regardless of lay-up orientation. Futhermore, failure mechanism was described by a video monitoring and SEM.

A Study on FMEDA Process for SIL Certification : A Case Study of a Flame Scanner (SIL 인증을 위한 FMEDA 프로세스 연구 : 화염검출기 사례를 중심으로)

  • Kim, Sung Kyu;Kim, Yong Soo
    • IE interfaces
    • /
    • v.25 no.4
    • /
    • pp.422-430
    • /
    • 2012
  • In this article, we introduced the estimation method by 'Safety Integrity Level'(SIL) for the criterion of safety assurance and performed a case study on a flame scanner. SIL requires probabilistic evaluation of each set of equipment used to reduce risk in a safety related system. FMEDA(Failure Modes, Effects and Diagnostic Analysis) method is widely used to evaluate the safety levels and provides information on the failure rates and failure mode distributions necessary to calculate a diagnostic coverage factor for a part or a component. Basically, two parameters resulting from FMEDA are used for SIL classification of the device : SFF(Safe Failure Fraction) and PFD(Probability of Failure on Demand). In this case study, it is concluded that the flame scanner is designed to fulfill the condition of SIL 3 in the aspect of SFF and PFD.