The Research of Layout Optimization for LNG Liquefaction Plant to Save the Capital Expenditures (LNG 액화 플랜트 배치 최적화를 통한 투자비 절감에 관한 연구)

  • Yang, Jin Seok;Lee, Chang Jun
    • Korean Chemical Engineering Research
    • /
    • v.57 no.1
    • /
    • pp.51-57
    • /
    • 2019
  • A plant layout problem has a large impact on the overall construction cost of a plant. When determining a plant layout, various constraints associating with safety, environment, sufficient maintenance area, passages for workers, etc have to be considered together. In general plant layout problems, the main goal is to minimize the length of piping connecting equipments as satisfying various constraints. Since the process may suffer from the heat and friction loss, the piping length between equipments should be shorter. This problem can be represented by the mathematical formulation and the optimal solutions can be investigated by an optimization solver. General researches have overlooked many constraints such as maintenance spaces and safety distances between equipments. And, previous researches have tested benchmark processes. What the lack of general researches is that there is no realistic comparison. In this study, the plant layout of a real industrial C3MR (Propane precooling Mixed Refrigerant) process is studied. A MILP (Mixed Integer Linear Programming) including various constraints is developed. To avoid the violation of constraints, penalty functions are introduced. However, conventional optimization solvers handling the derivatives of an objective functions can not solve this problem due to the complexities of equations. Therefore, the PSO (Particle Swarm Optimization), which investigate an optimal solutions without differential equations, is selected to solve this problem. The results show that a proposed method contributes to saving the capital expenditures.

Analysis of the Effectiveness and Feasibility of Accident Analysis Policy for Construction Safety from the Perspective of System Safety (시스템안전 관점에서의 건설안전 사고분석 정책의 효과성 및 타당성 분석)

  • Sunjin Lee;Hunggi Lee;Dongil Shin
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.146-160
    • /
    • 2023
  • Purpose: The construction industry is a complex mechanism in which multiple processes are carried out at the same time, and the frequency and severity of accidents account for a higher proportion than other industries, and the accident fatality rate also accounts for more than 50% of all industries. In order to reduce such accidents, the government's disaster investigation method analyzes the limitations from the system safety point of view and proposes improvement plans. Method: The main contents of the government's serious accident investigation were identified, and the effectiveness/adequacy was analyzed from the system safety point of view. Result: Disaster investigation and analysis techniques tailored to violations and compliance were limited in providing fundamental solutions, and alternatives for accident prevention were possible for each component of the system when safety constraints, controls, and hierarchical interactions were combined. Conclusion: When combining the disaster investigation and analysis method from the current accident analysis method from the perspective of system safety, it is possible to identify the problems of interaction by class and communication process, so it is possible to suggest alternatives to prevent accidents from an integrated perspective.

Derivation of a new dose constraint applicable to radioactive discharges from Korean nuclear power plants through retrospective dose assessment

  • Kim, Soyun;Cheong, Jae Hak
    • Nuclear Engineering and Technology
    • /
    • v.54 no.10
    • /
    • pp.3660-3671
    • /
    • 2022
  • A new methodology to derive a dose constraint for radioactive effluent from a unit of nuclear power plant (NPP) through retrospective assessment was developed to reflect operational flexibility in line with international standards. The new dose constraint can retain the safety margin between the offsite dose and the past dose constraints. As case studies, the new approach was applied to 24 Korean NPPs to address the limitations of the existing seven dose constraints that do not fully comply with current international radiation protection standards. Therefore, an effective dose constraint for Korean NPPs was proposed as no less than 0.15 mSv/y, which is comparable to the international practices and previous studies (0.05-0.3 mSv/y). Although the lower bound of the equivalent dose constraint was calculated as 0.17 mSv/y, it is not proposed in this study since the compliance with the derived effective dose constraint can prevent accompanied equivalent doses to any organs from exceeding equivalent dose limits. The new framework and the case studies are expected to contribute toward and support the revision of existing dose constraints for radioactive effluent from NPPs, ensuring better compliance with the current international safety standards as well as reflect the operational flexibility in practice.

Rao-3 algorithm for the weight optimization of reinforced concrete cantilever retaining wall

  • Kalemci, Elif N.;?kizler, S. Banu
    • Geomechanics and Engineering
    • /
    • v.20 no.6
    • /
    • pp.527-536
    • /
    • 2020
  • The paper represents an optimization algorithm for reinforced concrete retaining wall design. The proposed method, called Rao-3 optimization algorithm, is a recently developed algorithm. The total weight of the steel and concrete, which are used for constructing the retaining wall, were chosen as the objective function. Building Code Requirements for Structural Concrete (ACI 318-05) and Rankine's theory for lateral earth pressure were considered for structural and geotechnical design, respectively. Number of the design variables are 12. Eight of those express the geometrical dimensions of the wall and four of those express the steel reinforcement of the wall. The safety against overturning, sliding and bearing capacity failure were regarded as the geotechnical constraints. The safety against bending and shear failure, minimum and maximum areas of reinforcement, development lengths of steel reinforcement were regarded as structural constraints. The performance of proposed algorithm was evaluated with two design examples.

A study regarding an TP(Thinking process) Application Plan for selecting the CTQ(Critical To Quality) of 6 Sigma (6시그마의 CTQ(Critical To Quality)선정을 위한 TP(Thinking Process) 활용 방안에 관한 연구)

  • Lee Jeong Seop;Seo Jang Hun;Park Myeong Gyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.81-85
    • /
    • 2004
  • Companies adopted a program called Six Sigma, in order to make fundamental changes in the way the company operated to fulfill customers' expectations. Six Sigma reduces the occurrence of defects. This approach derives the overall process of selection the right projects based on their potential to improve performance metrics and selection and training the right people to get the business results. However, in the course of Six Sigma process steps, companies are in the face of problems. This study is to solve the problems using TP(Thinking Process) of TOC(Theory of Constraints). TOC is methodology for solving key problem in system which is called Constraints. Nowadays, its application is going to be wide and its concept is being implemented. In this paper, it is showed possibility of application TOC to Six Sigma.

  • PDF

A Study for Selecting the Optimal Model among Ten Models of Crushing Machine with Various Constraints Related to Road Repairing (도로공사에 관련된 많은 제약조건을 갖는 열개의 파쇄장비 모델들 중 최적 모델 선정에 관한 연구)

  • Im Yeong Mun;Hwang Yeong Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.125-130
    • /
    • 2004
  • It is not difficult to see the road repairing. There are many and various machines that can crush road surface. The efficiency and power of the machine depend on crushing head-shape, crushing interval, crushing load, crushing stress, machine's dropping height and roller's kind. The objective of this study is to select the optimal model among ten models of crushing machine with constraints such as crushing depth, variation, and crushed particle size. The data for this study are chosen from the site of construction in Kangnung during three months ($2004.\;6.\;1\;\sim\;2004.\;8.\;31$). The provided methodology in this paper will be fruitful not only for the selection of crushing machine but also for the aspects of construction period, cost, work efficacy according to the condition from the various sites of construction.

  • PDF

Influence of Elastic Constraints at Free End on Stability of Timoshenko Cantilever Beam Subjected to a Follower Force (종동력을 받는 Timoshenko 외팔보에서 자유단의 탄성구속이 안정성에 미치는 영향)

  • 윤한익;손종동;김현수
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.116-121
    • /
    • 1996
  • On the stability of Timoshenko cantilever beam subjected to a follower force, the influence of the characteristics of elastic constraints at the free end Is studied. The equations of motion and boundary conditions of this nonconservative elastic system are estabilished by using the Hamilton's principle. Upon evaluation of the stability of this system, the effect of shear deformation and rotatory inertia is considered in calculation. Using cowper's formulae Timoshenko's shear coefficient K'are determined. From this imvestigation it is found that the constrain parameter have an appreciable stabilizing effect in this nonconservative system. Moreover, it is obvious that the small values of K'decrease the flutter load of this system.

  • PDF

Development of Synchro-EVM System Integrating TOC-CPM and EVM (TOC-CCPM과 EVM을 통합한 Synchro-EVM 시스템 개발 연구)

  • Lee, Do-Hern;Jang, Gil-Sang
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.291-299
    • /
    • 2017
  • Recently, many business and government organizations have benefitted by executing projects using TOC-CCPM(Theory of Constraints-Critical Chain Project Management). In parallel, Earned Value Management(EVM) metrics have also become popular. Many organizations like US government requires that all large projects measure and report project progress status using EVM. Thus, project management in business fields such as plant construction, IT development, ship building need to integrate TOC-CCPM and EVM in oder to keep and reduce the delivery date of projects for improvement of customer satisfaction and enlargement of business opportunity. This paper proposes the scheme and case of developing the Synchro-EVM system which TOC-CCPM and EVM are connected.

A Study on the Safety Requirements Establishment through System Safety Processes (시스템 안전성평가를 통한 효율적 요건 도출방안 연구)

  • Yoo, Seung-woo;Jung, Jinpyong;Yi, Baeck-Jun
    • Journal of Aerospace System Engineering
    • /
    • v.7 no.2
    • /
    • pp.29-34
    • /
    • 2013
  • Safety requirements for aircraft and system functions include minimum performance constraints for both availability and integrity of the function. These safety requirements should be determined by conducting a safety assessment. The depths and contents of aircraft system safety assessment vary depending on factors such as the complexity of the system, how critical the system is to flight safety, what volume of experience is available on the type of system and the novelty and complexity of the technologies being used. Requirements that are defined to prevent failure conditions or to provide safety related functions should be uniquely identified and traceable through the levels of development. This will ensure visibility of the safety requirements at the software and electronic hardware design level. This paper has prepared to study on promoting the efficiency of establishing hierarchical safety requirements from aircraft level function to item level through system safety processes.

Realization of Real-time Scheduler for Nuclear Safety System (원자력 안전계통의 실시간 스케쥴러 구현)

  • Park, Dong-Chul;Kim, Tae-Yeon;Lyou, Joon
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.215-216
    • /
    • 2007
  • This paper presents a real-time scheduler for nuclear safety system. According to constraints and requirements of nuclear safety system, scheduler design analysis is done and algorithms are developed for implementation. Using DSP based hardware, a real-time scheduler is realized. Consequently, this paper shows the performance of periodical software through the monitoring program.