• Title/Summary/Keyword: SOC Project

Search Result 101, Processing Time 0.019 seconds

A Study on the Factors Affecting Utilization of Life SOC Facilities of Rural Center - In the Case of Base District of Seongjeon-myeon Rural Center Revitalization Project of Gangjin-gun - (농촌중심지 생활SOC시설 이용의 영향요인 연구 - 강진군 성전면 농촌중심지활성화사업 거점지구를 대상으로 -)

  • Kim, Tae Ryang;Kang, Hee Ju;Cho, Joong Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.51-59
    • /
    • 2022
  • The purpose of this study is to provide a plan to promote the use of life SOC facilities by analyzing the factors affecting utilization of life SOC facilities established as part of the rural center revitalization project. To this end, we selected Seongjeon-myeon, Gangjin-gun where the rural center revitalization project was implemented, conducted a survey on residents while analyzing the project details, and analyzed the results. This study revealed that the residents with a cognitive level for the rural center revitalization project and life SOC tended to more actively use the life SOC facilities. Therefore, to boost residents' use of the life SOC facilities, it is necessary to promote their understanding of and interest in the rural center revitalization project in the project implementation phase and have them be sufficiently aware of the facilities by operating pilot programs for residents in each facility and holding local events and festivals. This study will lay a steppingstone for active resident use of life SOC facilities established in rural centers and provide basic data for further research.

Improvements on the Total Project Cost Management System for SOC Projects (SOC건설사업의 총사업비 관리체계 개선방안)

  • Kim, Young-Jae;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.105-114
    • /
    • 2010
  • As the Korean economy went into a recession because of the global financial crisis in 2008, in order to vitalize the Korean economy, the government raised SOC budget and made its execution earlier. To prevent increases in budget for the government financial investment projects, the government controlled the project cost of SOC construction projects by enacting 'Guideline for total project cost management' in 1994 and complementing the relevant system. However, different from government intention, the total project cost of SOC projects were increased drastically. Hence, the government authorities and research institutions insisted the necessity of supplementation and improvement for the total project cost management system. This research is to provide the improvement for the total project cost management system of domestic SOC projects. In this research, As-Is Model was adjusted considering status of the total project cost management in the current SOC projects. Also the cost management of construction projects between domestic and other developed countries was studied, analyzed and compared. Based on the above, problems related to total project cost management of domestic SOC projects were found out and an improved total project cost management was provided to improve these problems.

Effectiveness Analysis According to the Affiliation of Linear SOC Projects and Cadastral Resurvey Project (선형 SOC 사업과 지적재조사측량의 연계에 따른 효과 분석)

  • Lee, Byoungkil;Yoon, Jong Sung;Son, Jong Young
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.spc4_2
    • /
    • pp.393-400
    • /
    • 2014
  • "Master Plan of Cadastral Resurvey Project" aims to put the governmental budget of 1.3 trillion Won into the cadastral resurvey project until 2030 that reflects the preliminary feasibility study, conducted by government at 2012. The cadastral Resurvey, which takes 78.8% of the expenses in the project, has to take an critical role for earning the most effective results from the project. The cadastral confirmation surveying take up almost 13% of the project and is controlled under the areal SOC(Social Overhead Capital) projects in current "Master Plan of Cadastral Resurvey Project". Also, the affiliations of cadastral resurvey and linear SOC projects are expected to bring advanced results, although those are excluded from cadastral confirmation surveying. For linear SOC projects, the land division survey is conducted by using boundary stakes in boundary survey, while the cadastral resurvey is conducted within the SOC project area, after the completion of the project. In this study, we could conclude that cadastral resurvey results with the world geodetic system from boundary survey at the point of land division could be produced without the duplication of land division and cadastral resurvey. As a result, the expected benefits are 73,877 parcels and 4,078 million won, annually.

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

A Study on the Effective Application of the Project Finance to the Korean Private Infrastructure Projects (SOC 민자사업과 프로젝트 파이낸싱의 효율적 결합방안에 관한 연구)

  • Park Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.67-73
    • /
    • 2000
  • For the successful performance of a private infrastructure project, an effective project financing is indispensable through various domestic/overseas sources. This study explains the concept of the private infrastructure development and investigates its current status in Korea. In addition, the details of the changed environment for the project finance under the newly enacted 'Private Investment Act' are compared in an analytical manner to those under the previous law. Finally, it discusses the problems that still remain and recommends the remedies available for the better financing environment.

  • PDF

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

Location Suitability Assessment of the Living SOC Project in Rural Areas - Focusing on the Sports Center - (농촌 생활SOC 사업의 입지 적합성 평가 - 국민체육센터를 중심으로 -)

  • Kim, Hyun-Joong;Lim, Sang-Yon;Seong, Eun-Young
    • Journal of Agricultural Extension & Community Development
    • /
    • v.29 no.3
    • /
    • pp.173-189
    • /
    • 2022
  • This study aims to evaluate the location suitability of the Living SOC Project in rural areas. For the assessment of location suitability, we applied location efficiency and location equity, respectively. One hundred sixteen national sports centers in 57 rural areas are selected as the target of analysis. The location efficiency and location equity in each sports center revealed a large gap between facilities. The location suitability evaluation results examined in 57 rural areas were similar to those analyzed at individual facilities. The correlation between the location suitability results and rural characteristics was weak. Also, location efficiency and location equity have a fragile relationship. In the light of these results, the location of the sports center, whose supply has been confirmed in rural areas through the Living SOC project, does not consider regional characteristics actively. In addition, it is difficult to say that the location efficiency and location equity of sports centers have been proactively estimated. Therefore, breaking away from the performance-oriented policy and switching to a lifestyle SOC supply policy based on the pre- and ex-post location evaluation system is necessary.

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

Development of An Information System for SOC Projects (SOC사업의 정보시스템 개발에 관한 연구 -원자력발전소건설 사업을 중심으로)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.2
    • /
    • pp.46-54
    • /
    • 2003
  • SOC(Social Overhead Capital) projects such as road, power plant, airport or telecommunication facility construction require a large scale of cost, a long period of time and management of a number of sub-contractors. So systematic and efficient management tool in SOC projects is inevitable. Information system provides a valuable tool which can integrate and manage the large volume of information for SOC projects. This study investigates and analyzes the information system of nuclear power plant construction project. Based on this study, we can suggest the direction for designing information system for SOC projects.