Seoul Metro continuously converted the standard rail into continuous welded rail since the later part of 1990's, and currently, most of the sectors of the Seoul Metro are continuous welded rails. As the continuous welded rail is inhibited by the contraction and expansion force of the rail as well as rail-bed, this force is stored as the internal stress of the rail with the exception of portion of the both ends of the continuous welded rail. If the contraction and expansion of the rail is restricted, the internal stress, that is, the force in the direction of the axis, is proportional to the cross-sectional area of the rail. Therefore, with regards to the temperature changes, the internal stress changes in accordance with the type of rail, bolting apparatus, railroad tie and rail-bed. As such, the rail temperature becomes important data in securing the gap at the adjoining section of the rail in the standard rail section, and to determine the setting temperature for the continuous welded rail. In addition, it becomes basic data for maintenance of the track. Accordingly, this thesis introduces cases of installation of rail temperature detector in order to prevent and manage track defectiveness due to increase in rail temperature, and to utilize as basic data at the time of various construction and maintenance. Furthermore, this thesis aims to assist maintenance of track through systematic temperature management in the future by looking into means of its utilization.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.5
/
pp.1191-1198
/
2015
In this study, vehicle/track interaction analysis by the Saemaul powered vehicle was carried out. The prediction equation for the bending stress of rail was estimated using the rail bending stress by the rail surface irregularities at welds. Also, the fatigue analysis using a S-N curve of welds in the conventional railway was carried out. We estimated the fatigue life of CWR by the fracture probability. By the rail grinding, the fatigue life of CWR was evaluated in consideration to reduce the rail bending stress through removing the rail surface irregularities. Therefore, it presented the fatigue life of CWR according to the rail grinding execution plan in the conventional railway.
It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, based on the results of bending fatigue tests of rail and results of measuring tests in situ of rail bending stress, this study estimated the bending fatigue life of welded rail in concrete track, adopting a Haibach's rule. The bending fatigue life of CWR considered the rail surface irregularity, train speed and the S-N curve by types of rail welding. In addition, this study estimated it for the fracture probability 1%, 0.1%, 0.01%. Therefore, this study proposed bending fatigue life of CWR in concrete track.
This study was aimed to establish the acceptable contact force range between power collector and 3rd rail type conductor rail, and ramp slope for the Korean standardized rubber-tired AGT light rail vehicle. Dynamic behavior of the power collector, contact force variation and interruption in operation, were analyzed in the worst installation tolerance and various ramp slope of the conductor rail. The power collector was designed and manufactured to satisfy the Korean Standardized Specifications of the rubber-tired AGT light rail vehicle.
Since the concept was first introduced in the 1970s, transit-oriented-development (TOD) has greatly expanded in East Asian cities such as Hong Kong. Rail stations are built together with clusters of residential-commercial towers and government services to form a new style of living - a "rail village." This paper examines the composition, scale, spatial form, organization and operation of several typical rail villages in Hong Kong. The cases range across those planned from the mid-1990s to 2015. Based on the analysis of the rail village composition, the paper derives a development ratio to indicate the density, effectiveness and efficiency of a rail village catchment area. The ratio provides a useful and direct figure for the comparison of different stations, cities and development modes.
For maintaining railroad, accumulated passing tonnage is a determinant factor of appropriate rail replacement time. Recently, Seoul Metro's rail maintaining system and technology is being improved from previous years, which increasing a standard of rail replacement. Thus, this brings importance of estimating and managing for accumulated passing tonnage. In case of light weighted train such as subway, current method of calculating accumulated passing tonnage has defaults of misrepresenting accumulated passing tonnage data. Because current method is based on the weight of passengers and train., and operation data. In addition, currently there is no mechanical and electronic system that could represent and support the accurate data between heavy and non-heavy traffic area, and accumulated passing tonnage is calculated inaccurately by estimating average value each line. The current method of calculating accumulated passing tonnage misleads to unpredictable data that represent inappropriate rail replacement period, which leads to under or over analyzed replacement period. If accumulated passing tonnage is over estimated, rail replacement leads to waste of budget. Hence, it is necessary to construct reliable actual measurement system to manage rail's life safely and efficiently, and in this study the accumulated passing tonnage measurement device is installed with using rail pad of optical fiber sensors and its effect is analyzed.
This paper present adaptation method of rail potential test to verify DC railway system's performance and safety. For protection of person and utility caused by rail potential rise, international standard to limit rail potential rise is made and rail potential is tested at the time of plan and construction of DC railway system in foreign country. So, we need rail potential test at the opening time and prepare a continuous monitoring technique of rail potential and a limitation method of rail potential rise. For these, we describe cause of rail potential rise, international standard about rail potential, protection principle, an example of calculation and measurement, and adaptation method for performance test.
For optimization of a low-noise track system, rail vibration and noise radiation needs to be investigated. The main influencing parameters for the noise radiation and the quantitative results of every track system can be obtained using a calculation model of generation and radiation of railway noise. This kind of model includes contact modeling and the calculation model of the dynamic properties of the wheel and the rail. This study used a nonlinear wheel/rail interaction model in the time domain to investigate the excitation of the rolling noise. Wheel/rail response is determined by time integrating Green's function of the rail together with force impulses from the wheel/rail contact. This model and the results of the study can be used for supporting calculation with the conventional model by an addition of the contributions due to nonlinearities to the roughness spectrum.
This paper examines the outcomes and tasks of U rail privatization especially focusing on the rail safety. Earlier research which focused on the rail safety had little knowledge of the explanations for recent changes of safety scheme. Moreover, they had difficulty making a direct comparison of safety between national rail and the privatized rail. Therefore we are left without a good explanation which has a comprehensive perspective. I attempt to show the outcomes of safety in the rail privatization process and its tasks focusing on the recent fatal accident. This paper argues that the UK's rail safety has a framework which is too complicated with overlapping responsibilities that brought about inefficiency, increasing costs. Especially infrastructure enterprise did not come to play an appropriate role. However, after 2000, the government took charge of setting the strategy for railway safety, and the Office of Rail Regulation covered safety, performance and cost. I explain that these changes present a good opportunity to solve the problem of passing the buck for rail accident. Through the analysis, I find that outcomes of rail privatization in safety are improved comparing the national rail. However, safety performance, for example the collision of structures of cars and looseness of rail should be improved. In future, the problems of fatal accident and a bit of duplicate safe system should be addressed.
In this study we examined the method to select the size of the conductor rail for light rail system. Study results shows that using the conductor rail with lower resistivity requires fewer power substation, which results in lower construction cost. It also produces less copper loss. Therefore first choose the conductor rail with lowest resistivity and select the substation location, Next conduct computer simulation study to confirm it meets voltage requirement. if the minimum voltage is well above the required minimum voltage, substation number can probably be further reduced.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.