• Title/Summary/Keyword: Running loss

Search Result 147, Processing Time 0.03 seconds

Analysis of Interior Noise of High Speed EMU by using SEA (동력 분산형 고속철도 차량의 실내소음 해석 : SEA 응용)

  • Kim, Tae-Min;Kim, Jeung-Tae;KIm, Jung-Soo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.970-978
    • /
    • 2010
  • In this study, interior noise of the high speed EMU was estimated by statistical energy analysis (SEA) method. Based on the data measured at a distance of 25m from a running train, exterior noise of the running train was calculated. And then it was designed as noise sources in VA ONE, a commercial software of SEA. coupling and damping loss factor of high speed EMU studied in previous studies is used. The interior noise of the train was estimated for a open-land section. The analysis of interior noise of HST in the tunnel section will be estimated through same method.

  • PDF

Design of Fuzzy-Power Controller for a Pump with Electric Proportional Valve (절자 비례 밸브를 갖는 펌프의 퍼지-동력제어기 설계)

  • 전순용
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.4
    • /
    • pp.441-447
    • /
    • 1998
  • Motivated by a recent work, a fuzzy-power-controller(FPC) is designed for the relieving-horsepower control of output variable pump with electrical proportional valve and actually implemented on the industrial excavator. In order to calculate the output power of pump with input of FPC, a linear discrete time model of load system to pump is obtained and the result is applied to control the engine-pump coupled system by software without pressure and flow sensor. The FPC controls the engine and pump coupled system by relieving horsepower control according to the change of load and the running conditions in relieving horsepower control are selected by fuzzy inference engine. A case study is peformed through the construction of the control device and installation on the excavator. It shows that the relieving-horsepower control system with the FPC, as suggested in this paper, is superior to the conventional PID controllers. And also, the excavator, with the FPC, shows that the power-loss of the coupled system is reduced and the running speed of the hydraulic actuator is enhanced.

  • PDF

A Cost-aware Scheduling for Reservation-Based Long Running Transactions (예약기반 장기수행 변동처리를위한 비용인지 시간계획)

  • Lin, Qing;Pham, Phuoc Hung;Byun, Jeong Yong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1248-1251
    • /
    • 2011
  • Web Service technologies make the automation of business activities that are distributed across multiple enterprises possible. Existing extended transaction protocols typically resort to compensation actions to regain atomicity and consistency. A reservation-based transaction protocol is proposed to reduce high compensation risk. However, for a serial long running transaction processing, the resource that is reserved in the early stage may be released due to resource holding time expires. Therefore, our analysis theoretically illustrates a scheduling scheme that tries to prevent the loss of resource holding as well as gain an optimized execution plan with minimum compensation cost. In order to estimate cost of different schedules, we set up a costing model and cost metric to quantize compensation risk.

공업용수배관의 캐비테이션-침식특성에 관한 연구 ( 1 ) ( Study on the Charactistics of Cavitation Erosion for Industrial Water Piping ( 1 ) )

  • 김윤곤
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.30 no.4
    • /
    • pp.312-319
    • /
    • 1994
  • Recently, with the rapid development in the industries such as an iron mill and chemical plants, there is enlarged by the use of the piping. Sepecially, the piping connected with a fluid, if it is increase the speed of running fluid, ought to generate cavitation phenomenon with unbalanced pressure. So, the cavitation phenomenon cause serious damage of the piping, because it generate erosion and corrosion in the piping. In this study, the steel pipe piping water (SPPW) and SPPW on weldment were tested by using of cavitation-erosion test apparatus with nozzle and were investigated under the marine environment of liquid. (specific resistance : 25 $Omega$. cm) The main results obtained are as follows : 1) The total weight loss and weight loss rate of affected zone of weldment by corrosion-erosion in the sea water are more increased than that of base metal. 2) The electrode potential by corrosion-erosion in the sea water becomes less noble than that of base metal, and current density is more increased. 3) As time goes by, the total weight loss and weight loss rate by cavitation erosion-corrosion in air-liquid 2 phase flow become more increased then those in only liquid solution. but these values turn to be decreased.

  • PDF

Study on the Heat Generation of Tank Track Rubbers under the Consideration of the Road Conditions (노면상태를 고려한 전차 궤도 고무의 열발생에 관한 연구)

  • 김병탁;김광희;윤문철
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.10 no.3
    • /
    • pp.166-175
    • /
    • 2002
  • Tank track rubbers, which undergo dynamic stresses and strains under various road conditions, leads to a result of considerable internal temperature rise due to the heat generation. Since rubber materials are not fully elastic, a part of the mechanical energy is converted into heat because of the hysteresis loss. Heat generation without adequate heat dissipation leads to heat build-up, i.e. internal temperature rise which, if excessive, exerts a bad influence upon the performance and the life of the tank track rubbers. The purpose of this paper is to predict temperature distributions of the rubber components off tank track subjected to complex dynamic loads under various read conditions. In steady state analysis temperature fields are displayed in contour shapes, and in unsteady analysis the temperature variations of some important nodes are represented graphically with respect to the running time of the tank.

MIDLOOP Code Analysis of a ROSA-IV/LSTF Experiment for the Loss of Residual Heat Removal System Event During Mid- loop Operation

  • Han, Kee-Soo;Lee, Cheol-Sin;Park, Chul-Jin;Kim, Hee-Cheol
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.683-690
    • /
    • 1996
  • The MIDLOOP code has been developed for the evaluation of RES pressurization transients initiated from a loss-of-Residual Heat Removal System (RHRS) during mid-loop operation after reactor shutdown. It provides a fast running and realistic tool for studying parametrically the response of important plant parameters such as pressure, temperature, and level to various plant combinations of the primary side vent, makeup, and leakage procedures and the steam generator (SG) conditions. The code consists of ten nodes representing the primary and secondary sides of a nuclear power plant and can analyze the effect of air on the primary system pressurization and primary to secondary heat transfer. The analysis results of the MIDLOOP code are in good agreement with the ROSA-IV/LSTF experiment without opening in the RCS.

  • PDF

Errors in the Triangular Fin Analysis under Assuming the Fin Tip is Insulated (핀끝이 절연되었다는 가정하에 삼각핀 해석에서의 오차)

  • 강형석;김성준
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.7
    • /
    • pp.1783-1788
    • /
    • 1994
  • A comparison of the temperature distributions along the wall and center of the fin and the heat loss from the fin, computed assuming the fin tip is insulated and assuming it is not insulated in a triangular fin, is performed by the two-dimensional forced analytic method. When the fin tip is not insulated, a comparison between forced analytic method and analytic method is made in the heat loss and temperature along the fin wall. The value of Biot number varies from 0.01 to 1.0. The root temperature and surrounding convection coefficients of the fin are assumed as a constant. The results are (1) the analysis on the triangular fin assuming the fin tip is insulated does not produce a good value as compared to that of not-insulated case as the non-dimensional fin length decreases and as the value of Biot number increases and (2) the errors between forced analytic method and analytic method are very small, but the former method is better for computer running time and accuracy.

하수처리장 방류수를 이용한 인공함양 가능성 평가

  • 김병군;서인석;홍성택;김형수
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.09a
    • /
    • pp.257-260
    • /
    • 2002
  • The main purpose of this research is to find suitable treatment methods of wastewater effluent for artificial recharge. For this purpose, we search the effluent quality of wastewater treatment plant and possibility of additional filtration process. Particles ranged 2 ~ 5 ${\mu}{\textrm}{m}$ and 15~20 ${\mu}{\textrm}{m}$ in "T" WWTP(Waste Water Treatment Plant) effluent were relatively dominant. In dual-media filtration system operation, head-loss development of column 1 was about two times faster than column 2, and head-loss development within 5 cm from surface was very important factor in operation, Conclusively, for the stable filtration and running time of 1.5~2 day, influent turbidity must keep 5 NTU or below, and filtration system must operated at 280 m/day or below. After filtration of WWTP effluent, water quality reached satisfactory level. This water has potential of agricultural reusing, flushing water in building, recharging water to river or stream at dry season and artificial recharge of ground water.und water.

  • PDF