• Title/Summary/Keyword: Rope Platform Screen Door(RPSD)

Search Result 5, Processing Time 0.017 seconds

A Study on the Sensibility Evaluation for the Human-centered Design of Rope Platform Screen Door(RPSD) (로프스크린도어의 인간중심 설계를 위한 감성평가에 관한 연구)

  • Jung, Byung Doo;Kim, Hyun;Shin, Kangwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.703-709
    • /
    • 2013
  • Recently, the study on the commercialization technology of Rope Platform Screen Door (RPSD) is on the process. The study is specifically on RPSD, which the rope screen ascends to allow passage with securing safety of passenger and the condition of aboveground station. For this human-centered design of RPSD, it is important to present system technology. However, it is also necessary to scientifically measure and research the emotions, senses or minds of users in the future. Therefore, this study analyzed the human factors to be considered with designing the system on RPSD, which is installed in Nokdong Station on Gwangju Subway as a trial. Moreover, the emotional evaluation was done by analyzing the factors as how they are effected in general; it processed by checking whether it is safe, height of rope is stable, it has openness (pressure) or strong by examining the moments that a set of ropes blocks rail from platform, and when train is arrived.

Feasibility analysis of RPSD(Rope type Platform Safe Door) on the simulation (시뮬레이션을 통한 로프타입 상하개폐식 승강장 안전문 적용성 검토)

  • Kang, Hee-Chan;Kim, Hyun;Chung, Younshik
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.2
    • /
    • pp.22-29
    • /
    • 2013
  • The platform safety door is difficult to install in platform because the doors of railway vehicles and existing Passenger Safety doors should be alined. To be able to solve this problem, we propose the use of Rope Type Platform Safe Door (RPSD) which is a vertically retractable platform that is designed to close from top to bottom. This platform has installed safety gate pillars at intervals of 20-40 m which accommodates different types of train regardless of train length, gate opening and location. In this paper, we reviewed the application of existing PSD and RPSD in various train stops in Seoul Gyeongbu Line platform. The results of the review showed that the existing PSD may cause problem in construction, safety and cost efficiency. The use of RPSD however shows that minimal problems will be encountered.

A Study on Priority Evaluation of the Rope-type Platform Safety Door(RPSD) Installation by Multi-criteria Decision Analysis (다기준 분석에 의한 로프형 승강장 안전도어의 설치 우선순위 산정에 관한 연구)

  • Jung, Byung Doo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.639-645
    • /
    • 2015
  • Recently, a study on the commercialization of Rope type Platform Safe Door (RPSD) technology has commenced. The study focuses on RPSD, in which a rope screen ascends to allow safe passage from the platform to the transit vehicle in aboveground stations. Currently, a pilot installation has taken in place with Daegu Metro Line 2 in MoonYang station starting from March of 2013. However, there is a need to select an appropriate pilot installation's object for the improvement in the future RPSD. An appropriate designation would correspond with the needs of the railroad corporation and as a historic railway platform with safe facilities. This study tried to usa Analytic Hierarchy Process (AHP) to determine the priority of the KTX stations to attain a list of appropriate designations for future RPSD installations by analyzing the followings: management of the facilities, operational risks, and intent of business projects. As a case study, it was applied to the evaluation of the KTX stations. For the application, it used relative measurement to calculate the weight of upper level structuring, and absolute measurement for low level structuring instead of pairwise comparisons.

Development of the Manual Opening and Closing Algorithm for Vertical Rope Type Platform Safe Door and Its Evaluation (상하개폐형 RPSD의 수동개폐 알고리즘 개발 및 평가)

  • Choi, Gapyeol;Kim, Hyun
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.3
    • /
    • pp.248-255
    • /
    • 2014
  • Though the Platform Screen Door System (PSD) has received a positive evaluation and is installed in all the Urban Railroad platforms, PSD is not installed in the Intercity Railroad platforms. The limitation of PSD in the Intercity Railroad platforms is due to the fact that first, various types of trains such as KTX, Saemaeul, Mugunghwa, and Nuriro stop at the platforms and their locations of the doors are different and secondly, they are not operated under ATO (automatic train operation). RPSD system currently under research and development, on the other hand, is based on the improved door that slides up and down and can be installed in any Intercity Railroad platform regardless of the length of the train, the location of doors, and the number of doors. This study considers the mechanism of RPSD, develops a manual open/close algorithm, and evaluates the function of RPSD. The results show that the manual open/close algorithm achieves a significant improvement in efficiency when provided with power supply.

Safety Analysis of Wire rope in the RPSD (RPSD에 설치된 와이어로프의 안전성 해석)

  • Park, Sang-Kyu;Peng, Lu;Kim, Hyun
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.8 no.2
    • /
    • pp.313-319
    • /
    • 2013
  • This study shows the results of safety analysis obtained from the three different wire rope connections in the RPSD (Rope Platform Screen Door) system, which are the rope connected at both ends, the ropes connected by a pulley at both ends, and the ropes connected by many pulleys at both ends. With a constant load applied, the displacements in the ropes connected by a pulley at both ends and the ropes connected by many pulleys at both ends are smaller than that in the rope connected at both ends. There are no any special different displacements between the ropes connected by a pulley at both ends and the ropes connected by many pulleys at both ends. The displacement in the wire rope diameter of 6mm is smallest of 4.83mm and the strains from the displacements in the ropes connected by a pulley at both ends and the ropes connected by many pulleys at both ends are very small.