• Title/Summary/Keyword: Rock mass rating

Search Result 83, Processing Time 0.034 seconds

A Study on the Impermeable Effect by Grouting in the Subsea Tunnel (해저터널에서 주입에 의한 차수효과 연구)

  • Kim, Seunghwan;Lim, Heuidae;Yoon, Seongmin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.6
    • /
    • pp.5-19
    • /
    • 2017
  • In this study, the effect of rock mass curtain grouting was investigated by analyzing the correlation between the parameters of the RMR & grout injection volume, Lugeon value & RQD, Lugeon value & cement injection volume. In order to investigate the effect of rock mass curtain grouting, we analyzed the grout injection volume of 315 curtain grouting holes at 9 tunnel face of NATM Subsea tunnels in gneiss area. The total grout injection volume in the Subsea tunnels study was slightly changed in some tunnels face but decreased with increasing the rating of parameters in spacing of discontinuity (R3, Js) and groundwater condition (R5). The geological anomalies of seismic survey (3D, TSP) and the inflow of probe hole were found to be more correlated of relative than the parameters of RMR. The unit injection volume was found to decrease with higher ratings in the parameters of the RMR except the weathering degree of the discontinuity (Jc, R4). The correlation between RQD and Lugeon values is not significant, but it can be confirmed that the Lugeon value tends to decrease as the RQD value increases.

A Study on the Failure Cause of Large Scale Rock Slope in Limestone Quarries (석회석 광산에서 발생한 대규모 암반사면의 붕괴원인 분석에 관한 연구)

  • Lee, Sang-Eun;Kim, Hak-Sung;Jang, Yoon-Ho
    • Tunnel and Underground Space
    • /
    • v.24 no.4
    • /
    • pp.255-274
    • /
    • 2014
  • The target of this study is large scale rock slope collapsed by around 7 pm on August, 2012, which is located at ${\bigcirc}{\bigcirc}$ limestone quarries of Gangneung city, Gangwondo. The slope prior to the collapse is formed as the height of about 200 m and the average inclination of $45^{\circ}$. The estimated amount of the collapse is about $1,500,000m^3$ with respect to the slope after the collapse. Geotechnical and field investigations such as boring, geophysical prospecting, surface geological survey, geological lineaments, borehole imaging, metric 3D imaging, experimental and field test, mining work by year, and daily rainfall were performed to find the cause of rock slope failure. Various analyzes using slope mass rating, stereonet projection, limit equilibrium method, continuum and non-continuum model were conducted to check of the stability of the slope. It is expected that the cause of slope failure from the results of various analysis and survey is due to the combined factors such as topography, rainfall, rock type and quality, discontinuities, geo-structural characteristics as the limestone cavity and fault zones, but the failure of slope in case of the analysis without the limestone cavity is not occurred. Safe factor of 0.66 was obtained from continuum analysis of the slope considering the limestone cavity, so the ultimate causes of slope failure is considered to be due to the influence of limestone cavity developed along fault zone.

A prediction of the rock mass rating of tunnelling area using artificial neural networks (인공신경망을 이용한 터널구간의 암반분류 예측)

  • Han, Myung-Sik;Yang, In-Jae;Kim, Kwang-Myung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.277-286
    • /
    • 2002
  • Most of the problems in dealing with the tunnel construction are the uncertainties and complexities of the stress conditions and rock strengths in ahead of the tunnel excavation. The limitations on the investigation technology, inaccessibility of borehole test in mountain area and public hatred also restrict our knowledge on the geologic conditions on the mountainous tunneling area. Nevertheless an extensive and superior geophysical exploration data is possibly acquired deep within the mountain area, with up to the tunnel locations in the case of alternative design or turn-key base projects. An appealing claim in the use of artificial neural networks (ANN) is that they give a more trustworthy results on our data based on identifying relevant input variables such as a little geotechnical information and biological learning principles. In this study, error back-propagation algorithm that is one of the teaching techniques of ANN is applied to presupposition on Rock Mass Ratings (RMR) for unknown tunnel area. In order to verify the applicability of this model, a 4km railway tunnel's field data are verified and used as input parameters for the prediction of RMR, with the learned pattern by error back propagation logics. ANN is one of basic methods in solving the geotechnical uncertainties and helpful in solving the problems with data consistency, but needs some modification on the technical problems and we hope our study to be developed in the future design work.

  • PDF

A STUDY ON THE CORRELATION BETWEEN GROUND SUBSIDENCE AREA NEAR ABANDONED UNDERGROUND COAL MINE AND GEOPHYSICAL PROSPECTING DATA USING GIS

  • Kim Ki-Dong;Choi Jong-Kuk;Won Joong-Sun
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.325-328
    • /
    • 2005
  • To estimate presumptive local ground subsidence area near Abandoned Under ground Coal Mine(AUCM) at Samcheok city in Korea, the geological properties of existing ground subsidence area and the geophysical prospecting data were analyzed using GIS. The electrical resistivity survey and seismic reflection survey database were constructed from investigation reports and factors which are related with ground subsidence such as geological map, topological map, land use map, lineament map, groundwater level, RMR (Rock Mass Rating), mining tunnel map and slope database were constructed also to make a comparative study of each parameters. As a result of the spatial analysis of existing ground subsidence area, 9 major factors causing ground subsidence were extracted and a connection between the structure of underground and the ground subsidence was determined from the analysis of geophysical prospecting data. The estimation of presumptive ground subsidence area was performed using the correlation between the result from neural network analysis of 9 factors and the scrutiny of geophysical prospecting data.

  • PDF

Assessment of Deformation Modulus in Gneiss for Road Tunnel (도로터널에서 편마암 구간의 암반변형계수 산정 연구)

  • Kim, Nag-Young;Kim, Sung-Hwan;Chung, Hyung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.27-35
    • /
    • 2001
  • Four road tunnels, which consists of biotite gneiss and granite gneiss and shows a similar geological conditions, were selected in this study. Laboratory and field tests, the rock mass rating for the four tunnels were conducted. A regression analysis was performed to find out the correlations of test results. It was proposed an equation of reduction factor which can assess the deformation modulus for biotite gneiss and granite gneiss. It was also found that there was a close correlation between Q and RQD in four tunnels according to the analysis between RMR and Q, RMR and RQD, Q and RQD and laboratory and field tests.

  • PDF

Evaluation of excavation damage zone during TBM excavation - A large deformation FE analysis study (TBM 굴착으로 인한 굴착손상영역 범위 추정 - 대변형 수치해석 연구)

  • Seheon Kim;Dohyun Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.1
    • /
    • pp.1-17
    • /
    • 2024
  • Analyzing the tunnel excavation behavior and its effect on the surrounding ground involves large deformation behavior. Therefore, in order to properly simulate the tunnel excavation process and rigorously investigate the actual effect of excavation on surrounding ground and tunnel structure large deformation analysis method is required. In this study, two major numerical approaches capable of considering large deformations behavior were applied to investigate the effect of tunnel boring machine excavation on the surrounding ground: coupled Eulerian-Lagrangian (CEL) and the automatic remeshing (AR) method. Relative performance of both approaches was evaluated through the ground response due to TBM excavation. The ground response will be quantified by estimating the range of the excavation damaged zone (EDZ). By comparing the results, the range of the EDZ will be suggested on the vertical and horizontal direction along the TBM excavation surface. Based on the computed results, it was found that the size of EDZ around the excavation surface and the tendencies was in good agreement among the two approaches. Numerical results clearly show that the size of the EDZ around the tunnel tends to be larger for rock with higher RMR rating. The size of the EDZ is found to be direct proportional to the tunnel diameter, whereas the depth of the tunnel is inversely proportional due to higher confinement stress around the excavation surface.

Conical Slope Stability of Tertiary Basalt Based on the Geological Cross-Sections (지질횡단면을 활용한 원추형 현무암 비탈면 안정성)

  • Myeong-Hyeok Ihm;Sung-Pil Hwang;Byung-Suk Park;Jun-Sang An;Woo-Seok Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.3
    • /
    • pp.447-457
    • /
    • 2024
  • This study investigated a cut-slope surface containing Tertiary faults, representing a conical-shaped slope with strike varying from N44°E to NS, N50°W, and finally N70°E. The slope consists mainly of basalt, with discontinuities in the slope including faults, fault zones, fracture zones, shear joints, and extension joints. The type and scale of failure vary with the strike of the slope and the strikes of discontinuities, with plane and wedge failure predominating. Based on face-mapping data, SMR (slope mass rating), rock physical and mechanical properties, analysis of stereonet projections and geological cross-sections, and critical equilibrium analysis, optimal slope stability determination was found to involve the countermeasure method, the slope gradient relief method, the green soil surface treatment method, and a fall prevention measure. After application of the countermeasure method, both dry and wet slope conditions exceeded allowable safety factors. It is expected that the preparation of geological cross-sections of various representative sections perpendicular to the surface of the slope, and the application of corresponding countermeasure methods, will be reasonable tools for three-dimensional analysis of slope stability. If the strike of the slope varies widely, it is necessary to prepare geological cross-sections, and the section used for critical equilibrium analysis must be established as the basic section.

Geostatistical Integration of MT and Borehole Data for RMR Evaluation (암반등급 평가를 위한 MT와 시추공 자료의 지구통계학적 복합해석)

  • Oh, Seok-Hoon;Chung, Ho-Joon;Lee, Duk-Kee
    • Geophysics and Geophysical Exploration
    • /
    • v.7 no.2
    • /
    • pp.121-129
    • /
    • 2004
  • The geostatistical approach was applied to integrate MT (Magneto-telluric) resistivity data and borehole information for the spatial RMR (Rock Mass Rating) evaluation. Generally, resistivity of the subsurface is believed to be positively related to the RMR, thus the resistivity and borehole RMR information was combined in a geostatistical approach. To relate the two different sets of data, we take the MT resistivity data as secondary information and estimate the RMR mean values at unsampled points by identification of the resistivity to the borehole data. Two types of approach are performed for the estimation of RMR mean values. Then the residuals of the RMR values around the borehole sites are geostatistically modeled to infer the spatial structure of difference between real RMR values and estimated mean values. Finally, this geostatistical estimation is added to the previous means. The result applied to a real situation shows prominent improvements to reflect the subsurface structure and spatial resolution of RMR information.

Analysis of Priority Investments for Preventing Roadside Slope Failures (도로비탈면 투자우선순위 결정에 관한 연구)

  • Kim, Seung-Hyun;Kim, Hong-Gyun;Oak, Young-Suk;Lee, Jong-Hyun;Koo, Ho-Bon
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.257-269
    • /
    • 2013
  • Prevention plans for landslide and slope disasters should be appropriate for a country's budget when considering a systematic investment plan. The systematic management of slopes adjacent to national highways should incorporate reasonable investment risk and the expected degree of damage should be calculated by considering the investment priorities. In terms of priority of investment, the major factors used to determine the degree of hazard are gradient, soil characteristics, RMR (Rock Mass Rating), stability interpretation, type of discontinuities, and history of collapse, among others. The likely consequences of slope failure can be determined by considering traffic volume, the number of lanes, and average vehicle risk. We performed such calculations regarding the priority of investment and performed a regression analysis for 392 slopes located in Yeongseo region, Gangwon province. The calculation results show that collapsed slopes have a higher priority for investment, as do slopes with a high proportion of dangerous sections and locations in valleys.

A Method of Tunnel Information Modeling Reflecting Curved Alignment and Model-based Information Management using IFC Data Schema (곡선 선형을 반영한 터널 정보모델링 및 IFC 데이터 스키마를 활용한 모델기반의 정보관리 방안)

  • Jang, Seong Geun;Kwon, Tae Ho;Park, Sang I.;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.549-557
    • /
    • 2017
  • In order to improve the productivity in the civil engineering field, efforts to apply BIM have been continuing, however, research on information modeling of tunnel structures considering alignment is insufficient. In this study, we proposed the method of building tunnel models reflecting curved alignment by transferring point data to BIM Authoring Tools(BAT) through discretization of alignment in Alignment-centered Modeling Tools(AMT). IFC data schema was derived to consider the physical and spatial elements of tunnel structures and alignment and IFC-based information management for tunnel alignment, tunnel structures and ground conditions was possible by referring to the extended data schema and including meanings in IFC property sets. The ratings for ground condition in Rock Mass Rating(RMR) and Q-system was automatically derived by using generated information model according to the proposed method.