• 제목/요약/키워드: Rock load

검색결과 540건 처리시간 0.024초

Effects of rock-support and inclined-layer conditions on load carrying behavior of piled rafts

  • Roh, Yanghoon;Kim, Garam;Kim, Incheol;Lee, Junhwan
    • Geomechanics and Engineering
    • /
    • 제18권4호
    • /
    • pp.363-371
    • /
    • 2019
  • In this study, the load carrying behavior of piled rafts installed in inclined bearing rock layer was investigated for rock-mounted and -socketed conditions. It was found that settlements induced for an inclined bearing rock layer are larger than for a horizontal layer condition. The load capacity of piled rafts for the rock-mounted condition decreased as rock-layer inclination angle (${\theta}$) increased, while vice versa for the rock-socketed condition. The load capacities of raft and piles both decreased with increasing ${\theta}$ for the rock-mounted condition. When bearing rock layer was inclined, loads carried by uphill-side piles were greater than those by downhill-side piles. The values of differential settlements of rock-mounted and -socketed conditions were not significantly different whereas slightly higher for the rock-socketed condition. The values of load sharing ratio (${\alpha}_p$) and its variation with settlement were not markedly changed by the inclination of bedrock. It was shown that ${\alpha}_p$ for piled rafts installed in rock layer was not affected by ${\theta}$ whereas actual loads carried by raft and piles may vary depending on the pile installation and rock-layer inclination conditions.

Performance of Rock-socketed Drilled Shafts in Deep Soft Clay Deposits

  • Kim, Myung-Hak
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.409-429
    • /
    • 2006
  • In designing rock-socketed drilled shaft, bearing capacity evaluation is very important because the maximum values of base and side resistance are not generally mobilized at the same value of displacement, FHWA and AASHTO code suggest different ultimate bearing capacity formular according to rock type and shaft settlement. In domestic code suggest base resistance and side resistance can be added on condition that after confirming the result of field load test with axial load transfer test. This paper shows that static load test and hi-directional load test result analysis of deep rock-socketed drilled shaft in three different sites. Load-settlement curve, t-z, and q-w curve in rock-socketed part were calculated and compared. t-z curve in weathered and soft rock showed no deflection softening behavior in pretty large strain (about 2-3% of diameter). Ultimate resistance could be the summation of side resistance and base resistance in rock-socketed drilled shaft in domestic sites.

  • PDF

풍화된 암반에 근입된 현장타설말뚝의 하중전이 기구 (Load Transfer Mechanism of Drilled Shafts in Weathered Rock)

  • 권오성;조성민;정성준;김명모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.57-64
    • /
    • 2005
  • Since the allowable bearing capacities of piles in weathered/fractured rock are mainly governed by settlement, the load-displacement behavior of the rock socketed pile should be well known. To predict pile head settlement at the design stage, the exact understanding of the load-transfer mechanisms is essential. Therefore, in this research, the load-transfer mechanisms of drilled shaft socketed into weathered rock was investigated. For that, 5 cast-in-place concrete piles with diameters of 1,000 mm were socketed into weathered gneiss. The static axial load tests and the load-transfer measurements were performed to examine the axial resistant behavior of the piles. A comprehensive field/laboratory testing program on weathered rock at the field test sites was also performed to describe the in situ rock mass conditions quantitatively. And then, the effect of rock mass condition on the load transfer mechanism was investigated. The side shear resistance of the pile in moderately weathered rock reached to yielding point at a few millimeter displacements, and after that, the rate of resistance increment dramatically decreased. However, that in the highly /completely weathered rock did not show the obvious yielding point, and gradually increased showing the hyperbolic pattern until with the relatively high displacement (>10 mm). The end bearing-displacement curves showed linear increase at least until with the base displacement of approximately 10 mm, regardless rock mass conditions.

  • PDF

암반에 근입된 현장타설말뚝의 선단하중전이거동 분석 (End Bearing Load Transfer Behavior of Rock Socketed Drilled Shafts)

  • 조후연;정상섬;설훈일
    • 한국지반공학회논문집
    • /
    • 제25권8호
    • /
    • pp.77-93
    • /
    • 2009
  • 본 연구에서는 3차원 유한차분해석을 통하여 말뚝직경, 암반물성, 불연속면의 간격 및 방향 등 주요 인자가 암반근입 현장타설말뚝의 선단거동에 미치는 영향에 대한 분석을 수행하였으며, 이를 토대로 초기기울기 및 극한 단위선단지지력을 변수로 하는 쌍곡선형태의 선단하중전이(q-w)함수를 제안하였다. 제안식의 국내 암반지반에의 적용을 위하여 국내에서 수행된 14개 현장 23본의 시험말뚝의 재하시험자료를 토대로 제안식의 경험계수를 산정하였으며, 더불어 기존 초기기울기 및 극한단위선단지지력 산정식의 타당성 검토도 수행하였다. 현장재하시험 사례와의 비교분석 결과, 본 연구에서 제안된 산정식은 국내 암반지반에 근임된 현장타설말뚝의 선단거동을 비교적 잘 예측 가능하고, 말뚝지지력 및 침하량 예측값이 실측값에 가까움을 알 수 있었다.

역해석을 이용한 콘크리트라이닝 지반 이완하중 산정방법 연구 (A Study on the Estimation Method of Rock Load Applied to Concrete Lining Using Back Analysis)

  • 박기환;신영완;김정주;유한규
    • 대한토목학회논문집
    • /
    • 제33권5호
    • /
    • pp.1957-1968
    • /
    • 2013
  • 터널 콘크리트라이닝 설계 시 적용되는 지반 이완하중은 정립된 설계기준이 없는 상태이다. 또한, 경험적인 지반 이완하중을 산정하여 설계에 적용함으로써 다소 보수적인 설계가 이루어지고 있는 것으로 일반적으로 인식되고 있다. 기존의 지반 이완하중 산정방법은 각각 다양한 문제점을 내재하고 있고, 수치해석에 의한 지반 이완하중 산정방법은 복잡하며 실제 지반 이완하중과의 비교검증이 이루어지지 않은 문제점이 있다. 따라서, 실제 터널현장의 거동을 반영할 수 있는 합리적인 지반 이완하중 산정방법에 대한 연구가 필요하다. 본 연구에서는 터널 시공현장에서 측정된 계측자료의 천단침하를 고려한 역해석을 통하여 지반 이완하중을 산정하는 방법을 제안하였다. 기존 지반 이완하중 산정방법보다 다소 작은 지반 이완하중이 산정되었다.

대구경 소켓경사반력말뚝의 인발거동에 관한 연구

  • 최용규;김상옥;정창규;정성기;김상일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.277-284
    • /
    • 2000
  • Using the large diameter (D = 2,500mm, L = 40m) batter steel pipe piles, designed as compression piles but used as reaction piles during the static compression load test of socketed test piles (D = 1,000mm, L = 40m), static pile load tests for large diameter instrumented rock-socketed piles were performed. The reaction steel pipe piles were driven 20m into the marine deposit and weathered rock layer and then l0m socketed with reinforced concrete through the weathered rock layer and into hard rock layer. Steel pipe and concrete in the steel pile part, and concrete and rebars in the socketed parts were instrumented to measure strains in each part. The pullout amounts of reaction pile heads were also measured with LVDT. During the static pile load test, total compressional load of about 20MN was loaded on the head of test piles, but load above 20MN was not loaded due to lack of loading capacity of loading system. Over the course of the study, maximum pullout amount up to 7mm was measured in the heads of reaction piles when loaded op to 10MN and 1mm of pullout amount was measured. More than 85% of pullout load was transfered in the residual weathered rock layer and about 10% in the soft rock layer, which was somewhat different transfer mechanism in the static compressional load tests.

  • PDF

The effect of compression load and rock bridge geometry on the shear mechanism of weak plane

  • Sarfarazi, Vahab;Haeri, Hadi;Shemirani, Alireza Bagher
    • Geomechanics and Engineering
    • /
    • 제13권3호
    • /
    • pp.431-446
    • /
    • 2017
  • Rock bridges in rock masses would increase the bearing capacity of Non-persistent discontinuities. In this paper the effect of ratio of rock bridge surface to joint surface, rock bridge shape and normal load on failure behaviour of intermittent rock joint were investigated. A total of 42 various models with dimensions of $15cm{\times}15cm{\times}15cm$ of plaster specimens were fabricated simulating the open joints possessing rock bridge. The introduced rock bridges have various continuities in shear surface. The area of the rock bridge was $45cm^2$ and $90cm^2$ out of the total fixed area of $225cm^2$ respectively. The fabricated specimens were subjected to shear tests under normal loads of 0.5 MPa, 2 MPa and 4 MPa in order to investigate the shear mechanism of rock bridge. The results indicated that the failure pattern and the failure mechanism were affected by two parameters; i.e., the ratio of joint surface to rock bridge surface and normal load. So that increasing in joint area in front of the rock bridge changes the shear failure mode to tensile failure mode. Also the tensile failure change to shear failure by increasing the normal load.

Centrifuge modelling of rock-socketed drilled shafts under uplift load

  • Park, Sunji;Kim, Jae-Hyun;Kim, Seok-Jung;Park, Jae-Hyun;Kwak, Ki-Seok;Kim, Dong-Soo
    • Geomechanics and Engineering
    • /
    • 제24권5호
    • /
    • pp.431-441
    • /
    • 2021
  • Rock-socketed drilled shafts are widely used to transfer the heavy loads from the superstructure especially in mountainous area. Extensive research has been done on the behavior of rock-socketed drilled shafts under compressive load. However, little attention has been paid to uplift behavior of drilled shaft in rock, which govern the overall behavior of the foundation system. In this paper, a series of centrifuge tests have been performed to investigate the uplift response of rock-socketed drilled shafts. The pull-out tests of drilled shafts installed in layered rocks having various strengths were conducted. The load-displacement response, axial load distributions in the shaft and the unit skin friction distribution under pull-out loads were investigated. The effects of the strength of rock socket on the initial stiffness, ultimate capacity and mobilization of friction of the foundation, were also examined. The results indicated that characteristics of rock-socket has a significant influence on the uplift behavior of drilled shaft. Most of the applied uplift load were carried by socketed rock when the drilled shaft was installed in the sand over rock layer, whereas substantial load was carried by both upper and lower rock layers when the drilled shaft was completely socketed into layered rock. The pattern of mobilized shaft friction and point where the maximum unit shaft friction occurred were also found to be affected by the socket condition surrounding the drilled shaft.

삼축압축시험을 통한 암반에 근입된 현장타설말뚝의 선단 하중전이곡선 산정 (Evaluation of the q-w Curve on Rock-Socketed Drilled Shafts by Triaxial Compression Tests)

  • 김태형;김용민;정상섬
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.455-465
    • /
    • 2008
  • In this study, the load distribution and deformation of rock-socketed drilled shafts subjected to axial load are investigated based on small scale model tests. In order to analyze the effects of major influencing factors of end bearing capacity, Hoek-cell triaxial tests were performed. From the test results, it was found that the initial slope of end bearing load transfer (q-w) curve was highly dependent on rock mass modulus and pile diameter, while the ultimate unit toe resistance ($q_{max}$) was influenced by rock mass modulus and the spacing of discontinuities. End bearing load transfer function of drilled shafts socketed in rock was proposed based on the Hoek-cell triaxial test results and the field loading tests which were performed on granite and gneiss in South Korea. Through the comparison with pile load tests, it is found that the load-transfer curve by the present study is in good agreement with the general trend observed by field loading tests, and thus represents a significant improvement in the prediction of load transfer of drilled shaft.

  • PDF

현장 말뚝재하시험을 통한 암반에 근입된 현장타설말뚝의 주면마찰력 결정 (Shaft Resistance Characteristics of Rock-Socketed Drilled Shafts Based on Pile Load Tests)

  • 설훈일;정상섬
    • 한국지반공학회논문집
    • /
    • 제23권9호
    • /
    • pp.51-63
    • /
    • 2007
  • 암반에 근입된 현장타설말뚝의 주면거동특성을 분석하고자, 편마암질의 풍화암/연암지역에서 현장 말뚝재하시험(압축재하 4회, 인발시험 5회)을 수행하였다. 이를 통해 암반 풍화, 굴착면 거칠기, 말뚝 직경, 재하방향 등의 요소들이 암반 근입 현장타설말뚝의 주면 전단거동을 결정짓는 주요요소임을 확인할 수 있었다. 본 연구에서는 국내에서 수행된 암반 근입 현장타설말뚝의 재하시험 사례를 토대로 국내 암반조건을 반영한 극한주면마찰력($f_{max}$)을 제안하였다.