• Title/Summary/Keyword: Rock blasting

Search Result 435, Processing Time 0.028 seconds

Collapse Behavior of Small-Scaled RC Structures Using Felling Method (전도공법에 의한 축소모형 철근콘크리트 구조물의 붕괴거동)

  • Park, Hoon;Lee, Hee-Gwang;Yoo, Ji-Wan;Song, Jeung-Un;Kim, Seung-Kon
    • Tunnel and Underground Space
    • /
    • v.17 no.5
    • /
    • pp.381-388
    • /
    • 2007
  • The regular RC structures have been transformed into irregular RC structures by alternate load of RC structures during explosive demolition. Numerical simulation programs have contributed to a better understanding of large displacement collapse behavior during explosive demolition, but there remain a number of problems which need to be solved. In this study, the 1/5 scaled 1, 3 and 5 stories RC structures were designed and fabricated. To consider the collapse possibility of upper dead load, fabricated RC structures were demolished by means of felling method. To observe the collapse behavior of the RC structures during felling, displacement of X-direction (or horizontal), displacement of Z-direction (or vertical) md relative displacement angle from respective RC structures were analyzed. Finally explosive demolition on the scaled RC structures using felling method are carried out, collapse behavior by felling method is affected by upper dead load of scaled RC structures. Displacement of X and Z direction increases gradually to respective 67ms and 300ms after blasting. It is confirmed that initial collapse velocity due to alternate load has a higher 3 stories RC structures than 5 stories.

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Stability Assessment on the Final Pit Slope in S Limestone Mine (S 석회석광산에서의 최종 잔벽사면의 안정성 평가)

  • Sun, Woo-Choon;Lee, Yun-Su;Kim, Hyun-Woo;Lee, Byung-Joo
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.99-109
    • /
    • 2013
  • The slopes of open-pit mine are typically designed without considering the reinforcement and support method due to the economical efficiency. However, the long-term stability of final pit slope is needed in some case, therefore the appropriate measures that can improve the stability are required. In this study, the field survey and laboratory test were carried out in S limestone mine. The stability assessment of final pit slope was performed through the stereographic projection method, SMR, and numerical analysis. And countermeasures for stabilization were proposed. The results of analysis show that full scale of slope failure is not expected but the failures of bench slope scale are likely to occur. In oder to increase the stability of bench slope, we suggested the remedial methods as follows: excavating the final pit slope by pre-splitting blasting, placing the wide berm in the intermediate bench slope and installing the horizontal drainage hole in the place of local ground water runoff.

Characteristics of Tunnel Convergence Behaviour based on Variation of Rock Mass Rating (암반 등급 변화에 따른 터널 내공 변위 거동 특설)

  • Kim, Kwang-Yeom
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.545-553
    • /
    • 2008
  • Face mapping and displacement monitoring during tunnel construction are the most influential information for the stability assessment of ground and around structures. Especially, the result of face mapping and displacement analysis is essential to the excavation and support design in NATM which is based on the drilling and blasting. However, there have not been so many studies to put those useful information into practice for decision-making process during construction. The study reviewed the tunnel behaviour based on the RMR rating and displacement monitoring when the geological condition of rock mass varies inevitably. The study analysed the crown settlement using convergence equation in order to compensate the disparity induced by the location and time of measurement and found a distinct relation between the geological condition and the line of influence. As a result of analysing the various parameters related to the tunnel convergence according to the geological condition, the study suggested the basic knowledge about the relation between face mapping and displacement behaviour of tunnel.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Blast Design for Controlled Augmentation of Muck Pile Throw and Drop (발파석의 비산과 낙하를 조절하기 위한 발파 설계)

  • Rai, Piyush;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.360-368
    • /
    • 2010
  • The paper presents a case study from a surface mine where the controlled augmentation of throw and drop of the blasted muck piles was warranted to spread the muck piles on the lower berm of the bench. While the augmentation of throw increased the lateral spread and the looseness of the broken muck, the augmentation of drop significantly lowered the muck pile height for easy excavation by the excavators. In this light, the present paper highlights and discusses some pertinent changes in the blast design parameters for such specialized application of cast blasting in a surface mine, where a sandstone bench, with average height of 22-24 m was to be made amenable for excavation by 10 m3 rope shovels, which possessed maximum digging capability of up to 14 m. The results of tailoring the blast design parameters for augmentation of throw and drop are compared with the baseline blasts which were earlier practiced on the same bench by dividing the full height of the bench in 2-slices; upper slice (10-14 m high) and lower slice (12-15 m high). Results of fragment size, its distribution and total cycle time of excavator (shovel) are presented, and discussed.

Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance (TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개)

  • Young-Tae, Choi;Dong-Geon, Lee;Mun-Gyu, Kim;Joo-Young, Oh;Jung-Woo, Cho
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.345-352
    • /
    • 2022
  • The existing NATM (New Austrian Tunneling Method) has induced civil compliants due to blasting vibration and noise. Machanized excavation methods such as TBM (Tunnel Boring Machine) are being adopted in the planning and construction of tunneling projects. Shield TBM method is composed of repetition processes of TBM excavation and segment installation, the machine has to be stopped during the later process. Consecutive excavation technology using helical segment is under developing to minimize the stoppage time. The modification of thrust jacks and module are planned to ensure the advance force acting on the inclined surface of helical segment. Also, the integrated system design of hydraulic circuit will be remodeled. This means that the system deactivate the jacks on the installing segment while the others automatically act the thrusting forces on the existing segments. This report briefly introduces the mechanical research part of the current consecutive excavation technological development project of TBM.

Prediction of Disk Cutter Wear Considering Ground Conditions and TBM Operation Parameters (지반 조건과 TBM 운영 파라미터를 고려한 디스크 커터 마모 예측)

  • Yunseong Kang;Tae Young Ko
    • Tunnel and Underground Space
    • /
    • v.34 no.2
    • /
    • pp.143-153
    • /
    • 2024
  • Tunnel Boring Machine (TBM) method is a tunnel excavation method that produces lower levels of noise and vibration during excavation compared to drilling and blasting methods, and it offers higher stability. It is increasingly being applied to tunnel projects worldwide. The disc cutter is an excavation tool mounted on the cutterhead of a TBM, which constantly interacts with the ground at the tunnel face, inevitably leading to wear. In this study quantitatively predicted disc cutter wear using geological conditions, TBM operational parameters, and machine learning algorithms. Among the input variables for predicting disc cutter wear, the Uniaxial Compressive Strength (UCS) is considerably limited compared to machine and wear data, so the UCS estimation for the entire section was first conducted using TBM machine data, and then the prediction of the Coefficient of Wearing rate(CW) was performed with the completed data. Comparing the performance of CW prediction models, the XGBoost model showed the highest performance, and SHapley Additive exPlanation (SHAP) analysis was conducted to interpret the complex prediction model.

The Application of Copper Smelting Slag as Concrete aggregate (콘크리트용 동슬래그 골재의 활용 기술)

  • Ji, Seok-Won;Seo, Chee-Ho
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.2
    • /
    • pp.68-75
    • /
    • 2006
  • The total production of the smelted copper reaches 450,000 tons per year, and the production of copper-related goods grows year by year owing to the extension of facilities and the development of production techniques. On the other hand, the volume of slag discharges by-produced at the time of copper smelting process is also on trend of increase. The by-produced copper smelting slag amounts to 700,000 tons a year, which is one and half times of the total smelted copper production. Accordingly nobody disagrees that comprehensive researches on how to deal with and how to reuse the accumulated smelting copper slag have to be encouraged. Even though the possible uses of the copper smelting slag have being made on various levels at present as materials for iron powder cement, sand-blasting and fire-proofing rock wool, but a considerable volume of the slag is abandoned as unnecessary by burying or piling up in careless in the open ground.

  • PDF

The Ancient Construction Materials and Methods: The Great Wall of China in Jinshanling as a Case Study

  • Yang, Jin;Tan, Fabian Hadipriono;Tan, Adrian
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.37-49
    • /
    • 2017
  • The Jinshanling section of the Great Wall of China is a series of fortifications in northern China that was constructed for strategic military defenses. This section was first built in the beginning of the Ming Dynasty in AD 1368 and then underwent major construction, reconstruction and renovation during the late Ming Dynasty, approximately in AD 1569. The Jinshanling section is 10.5 km long, a very short section compared with the entire 21,200 km wall. The wall section is located in Luanping County, Hebei province, China. This research paper focuses on the construction methods and materials of the wall and the towers in the area. The research methodology includes site visits, knowledge acquisition of experts and 3D graphic modeling. This study reveals that the materials selected for the structure include rubbles and rammed earth, bricks, stones, timber, and mortar. The erection sequence of the wall and the towers was a bottom-up fashion using various ancient construction techniques, such as the fire-setting rock blasting techniques and the surveying techniques from the Sea Island Mathematical Manual.