• Title/Summary/Keyword: Rock Pillar

Search Result 89, Processing Time 0.022 seconds

Analysis of Tunnel Behavior Using Progressive Rockmass Failure Technique (암반의 진행성 파괴 기법을 이용한 터널거동 분석)

  • 이성민;이윤규;신성렬
    • Tunnel and Underground Space
    • /
    • v.9 no.4
    • /
    • pp.288-295
    • /
    • 1999
  • Concentrated stresses due to the underground tunnel excavation easily cause many problems such as yielding, popping, and failure at the immediate roof, wall and floor of tunnel. Therefore, it is very important to predict the possibility of these problems when a tunnel is excavated underground. There are two typical methods to predict these problems. The one is to predict problems from the analysis of field monitoring data and the other is to predict them from computer simulations using good site investment data. Using the second method, this study attempted to describe the time-dependent or progressive manner of immediate roof and wall due to the underground tunnel excavation. An iterative technique was used to represent progressive failure of rockmass with the Hoek and Brown theory. By developing and simulating three different shapes of twin tunnels, this research estimated the proper size of critical pillar width between tunnels, distributed stresses on the tunnel walls, and convergences of tunnel crowns. Moreover, results out of progressive failure technique based on the Hoek and Brown theory were compared with the results out of Mohr-Coulomb theory.

  • PDF

A Case Study on the Design and Construction of a 2-arch Tunnel with Varying Section (2-아치 변단면터널의 설계 및 시공사례 연구)

  • Choi, Jae-Jin;Park, Yeon-Jun;Kim, Si-Keun;Park, Jae-Hyun
    • Tunnel and Underground Space
    • /
    • v.22 no.5
    • /
    • pp.310-320
    • /
    • 2012
  • This paper describes the design and construction of a 2-arch tunnel with varying section. This new design has advantages of 2-arch tunnels, which is rather expensive, but is still economically competitive compared to parallel tunnels. Economic analysis was also conducted. To secure the stability of the varying section tunnel, excavated part was reinforced by tie-bolts and RRS, and 2-arch part was supported by EPS blocks and concrete walls. Stability of the pillar was theoretically analyzed and also examined by numerical simulations for various widths. Displacement monitoring was conducted and results were compared with numerical results. Economic analysis showed reductions in construction cost and period by 11% and 10 months respectively.

A Study on the Cause Analysis of the Ground Subsidence in Limestone Mine (석회석 광산에서 발생한 지반침하에 대한 원인 분석 연구)

  • Lee, Sangeun;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.497-514
    • /
    • 2020
  • This study investigated the causes of large-scale ground subsidence in the upper part of mining cavities of the Samdo limestone mine, Samcheok city, Gangwondo, Korea. Geological and electrical resistivity surveys were undertaken on the collapsed slope of the mountain and in the mine tunnel where subsidence occurred, with geotechnical evaluations and numerical analysis. It is concluded that wide mining cavities, with irregular pillars in unstable rock masses hosting discontinuities, weathered over time, resulting in subsidence occurring along a fault plane due to increasing ground stress.

Research on no coal pillar protection technology in a double lane with pre-set isolation wall

  • Liu, Hui;Li, Xuelong;Gao Xin;Long, Kun;Chen, Peng
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.537-550
    • /
    • 2021
  • There are various technical problems need to be solved in the construction process of pre-setting an isolation wall into a double lane in the outburst prone mine. This study presents a methodology that pre-setting an isolation wall into a double lane without a coal pillar. This requires the excavation of two small section roadways to dig a wide section roadway, followed by construction of the separation wall. During this process the connecting lane is reserved. In order to ensure the stability of the separation wall, the required bearing capacity of the isolation wall is 4.66 MN/m and the deformation of the isolation wall is approximately 25 cm. To reduce the difficulty of implementing support the roadway is driven by 5 m/d. After the construction of the separation wall, the left side coal wall is brushed 1.5 m to make the width of the gas roadway reach 2.5 m and the roadway support utilizes anchor rod, ladder beam, anchor cable beam and net configuration. During construction, the concrete pump and removable self-propelled hydraulic wall mold are used to pump and pour the concrete of the isolation wall. In the process of mining, the stress distribution of coal body and isolation wall is detected and measured on site. The results demonstrate that the deformation of the surrounding rock of roadway and separation of roof in the roadway is small. The stress of the bolt and anchor cable is within equipment tolerance validating their selection. The roadway is well supported and the intended goal is achieved. The methodology can be used for reference for similar mine gas control.

Analysis on the Ore Recovery from Operating the Room & Pillar Hybrid Mining Method in the Korean Limestone Mine (국내 석회석 광산에서 주방식하이브리드 채광법의 채수율 분석)

  • Kwon, Dukjoon;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.27 no.3
    • /
    • pp.161-171
    • /
    • 2017
  • Demand for high-grade limestone is increasing, but the production in the domestic mines has been limited due to the lack of systematic development plans and efforts to develop mining technology to improve the recovery ratio, transition to high-cost underground mining due to increasing social awareness of environmental protection, and the smallness of the domestic mining industry, etc. In this study in connection with this issue, an analysis on the recovery change by improvement of mining method was executed. 3D modeling technique was used to construct a 3D model. 3D model includes the geological structure, the limestone ore body and the underground pits and tunnels excavated at the Daepyeong District of Daesung MDI Donghae District. By using the 3D model, measured resources, reserves and ore recovery were evaluated from the results of pilot operation of the room and pillar hybrid mining method, which is a variant of room and pillar mining method. These results were compared with those obtained from the conventional mining method. The ore recovery obtained by hybrid mining method was found to be up to 71.6%, showing about 26%p. increase compared with the case of conventional mining method.

Determination of Boil-Off gas Ratio for the Design of Underground LNG Storage System in Rock Cavern (암반동굴식 지하 LNG 저장 시스템 설계를 위한 기화율의 산정)

  • Chung, So-Keul;Lee, Hee-Suk;Jeong, Woo-Cheol;Park, Eui-Seob
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.56-65
    • /
    • 2007
  • A new underground LNG storage concept in the rock mass has been developed by combining underground cavern construction and new ice-ring harrier technologies with the conventional cryogenic insulation system. Technical feasibility of the storage system has been verified through construction and operation of the pilot storage cavern and a full-scale project is expected to start in the near future. One of the most important issues in the LNG storage system is the operational efficiency of the storage to minimize heat loss during a long period of operation due to the cryogenic heat transfer. This paper presents several important results of heat transfer and coupled hydro-thermal analyses by a finite element code Temp/W and Seep/W. A series of heat transfer analyses for full-scale caverns were performed to determine design parameters such as boil-off gas ratio (BOR), insulation thickness and pillar width. The result of the coupled hydro-mechanical analysis showed that BOR for underground storage system remains at about 0.04 %/day during the early stage of the operation. This value could be even much lower when the discontinuities in the rock masses are taken into consideration.

Multivariate adaptive regression splines model for reliability assessment of serviceability limit state of twin caverns

  • Zhang, Wengang;Goh, Anthony T.C.
    • Geomechanics and Engineering
    • /
    • v.7 no.4
    • /
    • pp.431-458
    • /
    • 2014
  • Construction of a new cavern close to an existing cavern will result in a modification of the state of stresses in a zone around the existing cavern as interaction between the twin caverns takes place. Extensive plane strain finite difference analyses were carried out to examine the deformations induced by excavation of underground twin caverns. From the numerical results, a fairly simple nonparametric regression algorithm known as multivariate adaptive regression splines (MARS) has been used to relate the maximum key point displacement and the percent strain to various parameters including the rock quality, the cavern geometry and the in situ stress. Probabilistic assessments on the serviceability limit state of twin caverns can be performed using the First-order reliability spreadsheet method (FORM) based on the built MARS model. Parametric studies indicate that the probability of failure $P_f$ increases as the coefficient of variation of Q increases, and $P_f$ decreases with the widening of the pillar.

Stability Analysis of the Spillway Tunnel Located on the Granite Region Including Fault Fractured Zone (단층파쇄대를 포함한 화강암지역의 여수로 터널 안정성 분석)

  • Han, Kong-Chang;Ryu, Dong-Woo;Kim, Sun-Ki;Bae, Ki-Chung
    • Tunnel and Underground Space
    • /
    • v.18 no.1
    • /
    • pp.58-68
    • /
    • 2008
  • The construction of an emergency spillway of Imha Dam is being in progress on the granite region including fault fractured zone. Considering that this tunnel is being excavated in three paralled rows, the pillar width between each tunnel and the face distance between each tunnel face were evaluated. The Influence of the fault fractured zone for the tunnel stability was investigated by numerical modelling in 3D. Various geophysical investigations and rock engineering field tests were carried out for these purposes. It was suitable that the second tunnel would be excavated in advance, maintaining the face distance between each tunnel face of minimum 25 m. The results of numerical modelling showed that the roof displacement and the convergence of the second tunnel were insignificant, and the maximum bending compressive stress, the maximum shear stress of shotcrete and the maximum axial force of rockbolt were also insignificant. Therefore, it was estimated that the stability of the spillway tunnel was ensured.

A Case Study on the Cause Analysis of Subsidence in Limestone Mine Using LiDAR-Based Geometry Model (라이다 기반 정밀 형상 모델 활용 석회석 광산 지반침하 원인분석 사례연구)

  • Hwicheol Ko;Taewook Ha;Sang Won Jeong;Sunghyun Park;Seung-tae Kim
    • Tunnel and Underground Space
    • /
    • v.33 no.3
    • /
    • pp.126-140
    • /
    • 2023
  • In this study, the cause of subsidence in limestone mine was analyzed using a LiDAR-based geometry model. Using UAV and ground-based LiDAR systems, a precise geometry model was constructed for the subsidence surface and mine tunnel, and the results of on-site geological survey and rock mass classification were utilized. Through the geometry model, distribution of thickness of crown pillar and faults around the subsidence area, calculation of the volume of the subsidence area and subsidence deposit, and analysis of the subsidence surface inclination were conducted. Through these analyzes, the causes of ground subsidence were identified.

A study of image on Honam Chinese poetry in 16th century (16세기 호남(湖南) 한시(漢詩)의 의상(意象) 연구(硏究) - 박상(朴祥), 임억령(林億齡), 고경명(高敬命)을 중심으로 -)

  • Kwon, Hyok-myong
    • (The)Study of the Eastern Classic
    • /
    • no.63
    • /
    • pp.43-82
    • /
    • 2016
  • The purpose of this paper is to study the image of the 16th Century Honam Chinese poetry. for that, Park Sang, Im Eokryeong, Ko Gyeongmyeong in this study. This paper identified the characteristics of Ho Nam poetry is two things. First of all, is "literary talent does not acknowledge" consciousness and image of army. Park Sang, Im Eokryeong, Ko Gyeongmyeong was advanced to the center politics with excellent literary talent to the talents our 16th century Honam. However, at that time, the ruling layer was time to lead the politics. Therefore, the three people to frustration. Yet three people were criticizing the reality. And they thought that they were unhappy. It is unfortunate that they did because of their literary talent to be recognized. Three people were very sensitive to not be recognized literary talent. This is because they were subject to the management by the literary ability. It does not recognize the literary consciousness appears as sword, spear, admiral image. Second, The HwaIbulryu consciousness and image of integrity. Park Sang, Im Eokryeong, Ko Gyeongmyeong thought it not right politics. Yet continued to politics. This is not behavior that is typical scholar. What they did so because we follow a man named Yuhahye. A man named yuhahye pursue life, be it a dirty political reality was to continue the crest. But that never lose their integrity. Three people who will follow the life of this Yuhahye. This is a life attitude graft Japanese apricot flower, oriole, rock of pillar, appears as an image.