• Title/Summary/Keyword: Road-effect zone

Search Result 56, Processing Time 0.025 seconds

A Case Study on Stability Evaluation of Road Slope based on Geological Condition (지질조건에 따른 도로사면 안정검토에 대한 사례연구)

  • Park, Chal-Sook;Kim, Jae-Hong
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.577-587
    • /
    • 2007
  • The length of study area was about 450m, and it was shown the geological condition of distinguished change of rock by cutting slope. In order to establish a slope stability, we carried out an engineering geological investigations about rock constituent, rock structure and a direction of discontinuous plane. The study area was divided into six section considered by direction of cutting slope, height of slope and geological condition. Analysis of cutting slope stability was carried out with stereo-graphic projection method by DIPS program which was feasible of stability analysis with geometrical correlation for a direction of discontinuous plane and direction of cutting slope. From analysis of cutting slope stability considered by construction, stability and economical efficiency, the slope stability countermeasures such as a high tensile wire net, slope protection method and enhanced retaining wall were established and operated which minimized effect caused by lower end of road on a relaxation of huge rock.

Experimental Study for Weed Control on the Shoulder of Expressway (고속도로 길어깨 구간의 잡초발생 억제 시험에 관한 연구)

  • Park, Jong-Chul;Jeon, Gi-Seong;Hur, Young-Jin;Kim, Kyung-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.6
    • /
    • pp.43-55
    • /
    • 2020
  • The study was performed in order to derive the management methods of revegetation space on embankment upper in the shoulder of expressway. The pilot study was conducted in 2013 on the test road section of the Jungbu Inland Expressway (Smart Highway) and continues to be monitored until 2020. In the test, three commonly used methods for weed control were applied. In the early two to three years, most of the methods were effective in controlling weeds. However, at the end of six years, weed suppression effects were different for each treatment. Vegetation coverage was 90% in the untreated control, 70-80% wood chip mulching method, 50-60% solidification method, and 20% sheet mulching method. The sheet method was found to be the most effective given the low vegetation coverage was effective in controlling weeds. The wood chip mulching method is promoting weed growth over time, and weeds are invading as the effect of soil hardening is reduced in the place where the soil hardener is treated. Among the methods applied in the test, mulching the sheet is the most effective, but it is important to use a durable sheet. In the future, it is necessary to find ways to control weeds on road shoulders, considering both economic and environmental aspects. For the proper management in the shoulder of expressway set target zone is needed. Clear standards for weed control on expressway should be established. And the technology to be applied must be durable for 3 years or more and must be able to suppress the amount of weeds to a level of 20% or less.

Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling (쉴드 TBM터널 상부 지반 연약대 전기탐사)

  • Jung, Hyun-Key;Park, Chul-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

Comparison of Section Speed Enforcement Zone and Comparison Zone on Traffic Flow Characteristics under Free-flow Conditions in Expressways (자유류 상태에서 고속도로 구간과속단속구간 및 대조구간 간의 교통류 특성 비교)

  • Shim, Jisup;Jang, Kitae;Chung, Sung Bong;Park, Shin Hyoung
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.2
    • /
    • pp.182-191
    • /
    • 2015
  • The Korean government introduced an automated speed enforcement system (ASES), which uses traffic enforcement cameras, to counteract safety issues that are caused by speeding. As the information of the traffic enforcement camera locations is provided to the drivers via navigation systems and mobile applications in a timely manner, drivers can avoid enforcement by momentarily diminishing their speeds only near the camera locations. To prevent drivers' evasional behavior and improve the effectiveness of ASES, section control, which enforces speeding vehicles by measuring their average travel speeds over a stretch of road and checking against the speed limit, has been recently implemented. In this study, Section Speed Enforcement Zone and Comparison Zone are compared in terms of traffic stream characteristics under free flow conditions. To this end, loop detector data were obtained from the three study sites and analyzed. The study results demonstrated that drivers maintain their speeds below the speed limit over the enforcement section with a lower variance of speeds.

The Effects Analysis and Model Project on Speed Management in Commerical Area Street (상업지역 생활도로 속도관리 시범운영 및 효과분석)

  • Shim, Kywan-Bho;Heo, Nak-Won
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.119-127
    • /
    • 2011
  • The main purpose of this paper is to apply Zone 30 system which is being experimented in advanced country for the solution of controlling the residential street's speed to our country with the consideration of the real condition of our street and traffic and to run this system as an example to analyze the effect and at the same time, analyze the problem and get appropriate preparation for this system to be widespread. The area to run this model project is Goyang City Ilsan-Gu.($0.65km^2$) which is close with the commercial area reflecting the opinion of experts and an on-site verification by the National Police Agency T/F and is having a heavy pedestrian traffic and the risk of pedestrian accident. Firstly we defined residential street and residential street area to review the system and devided the residential street type to establish a plan of operation. Afterwards, we thoroughly examined the model project area and analyzed the problem and solution. We finally completed establishing a facilities by conference with a local autonomous entity with the improvement of facility's sketch at the analysis of the model project area. The result of effects analysis which we devided after and before of establishment is that vehicle speed be reduced 5~15km/h, and traffic accidents has decreased by 24 percent.

Effect of Urban Planning on Spatial Equity - An Analysis on the Accessibility Change to Urban Cultural Facilities by Income Class Factor in the Daejeon Metropolitan City Using GIS - (도시계획사업이 공간적 형평성에 미치는 효과 - GIS를 이용한 대전광역시 도로건설사업의 소득계층간 접근성 변화 분석 -)

  • Leem, Youn-Taik;Seo, Chang-Woo;Lee, Sang-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.15 no.2
    • /
    • pp.23-34
    • /
    • 2012
  • As the quality of life grows, the role of cultural facilities in urban areas is becoming more important. However, due to various reasons, the location of these facilities shows the geographical imbalance between urban regions. Even though provision of road network can improve this kind of urban problem, in many countries, the provision of urban infrastructure plays a role which is magnifies the cultural gap between regions and socio-economic classes. The findings of this study are as follows. First of all, the inequality of accessibility to cultural facilities is shown over the period. Cross-sectional data shows that the higher the income of a region, the higher the accessibility index(AI) of the zone to cultural facilities at any time. Next, the provision of road network contributes the improvement of AI of high income region. Finally the provision of new facilities has a tendency that these kind of facilities are located to make AI of high income zone better. It means that the decision making by city government intensifies the geographical inequality. This result would be very useful in the decision making process for determining the number and the location of cultural facilities and other similar urban infrastructure as well. Also it will be helpful for the selection of optimal location which considered not only physical distances but also social equalities.

THE POTENTIAL USE OF A PUBLIC WEB SERVICE TO GUIDE CONVERGING CONSTRUCTION EQUIPMENT IN US&R

  • Albert Y. Chen;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.582-585
    • /
    • 2011
  • During disaster response, prioritization of limited resources is one of the most important bust challenging tasks. At the same time, it is imperative to timely provide the rescuers with the adequate equipment to facilitate lifesaving operations. However, supply of high demand equipment was insufficient during the initial phase of disaster response, challenging lifesaving operations in the case of the 9-11 terrorist attacks. In respond to the Haiti Earthquake, spatial information of the geographic area was not sufficient to support the search and rescue operations in the early phase of disaster response. However, with the help of civilians, information such as road names, infrastructure damage, and victim locations were updated into the spatial data repository. At the same time, resource outside of the disaster affected zone converges into the area to assist the response efforts, which is the effect of convergence that often made resource coordination challenging in large scale disasters. To efficiently collect information and utilize the converging resources, this paper proposes a flexible data repository for information update for equipment utilization in large scale disaster response scenarios.

  • PDF

Occurrence and Influence of acid Leachate by Pyrite in Underground Rocks of Road Construction Field in the Miryang Area (밀양지역 도로건설 현장 지반암석내 분포하는 황철석에 의한 산성침출수 발생과 영향)

  • Chae, Sun Hee;Jeong, Chan Ho;Lee, Yu Jin;Lee, Yong Cheon;Shin, Sang Sik;Park, Jun Sik;Ou, Song Min
    • The Journal of Engineering Geology
    • /
    • v.28 no.3
    • /
    • pp.501-512
    • /
    • 2018
  • The acid leachate derived from the sulfide mineral such as pyrite can cause problems such as aging of infrastructure and environment contamination around the civil construction site. The purpose of this study is to assess the environmental effect of an acid leachate derived from pyrite in the Miryang area under road construction. In this study, 13 samples of situ core were used for the net acid generation (NAG) experiment. The chemical composition including pH, oxidation and reduction potential (ORP) and electrical conductance of water samples produced from the NAG test was analyzed. In additional, five polished thin sections of rock cores were made for electro microprobe analyses. In the results of the NAG tests, 7 samples showed lower values than pH 3.5. It strongly indicated that these areas are under the environmental and infrastructure damage by the acid leachate. The chemical type of the 7 samples was classified as the $Fe(Ca)-SO_4$ type, which is totally a different type compared to general groundwater. The concentration of total sulfur ranges from 0.004% to 12.5%. 6 rock samples are plotted on a potentially acid forming zone in the relation diagram between the total sulfide and NAG-pH. In conclusion, it is suggested that a protection method against an environmental demage and an infrastructure corrosions by the acid leachate should be prepared in all of areas under a road construction.

A Study on the Analysis of the Relaxation Area and the Improvement Effect of the Ground by Road Subsidence (지하연속벽 배면 도로의 지반침하에 따른 이완영역분석방법과 지반 보강 효과검증에 관한 연구)

  • Lee, Hyoung Kyu;Lee, Yong-Sun
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.1
    • /
    • pp.29-41
    • /
    • 2021
  • Although underground works are essential to use underground spaces in urban areas efficiently, various damages caused by constructions have often occurred, making them major social problems. Since 2018, it is stipulated in the Special Act on Underground Safety Management that appropriate construction methods must be used in the design stage to prevent various damage cases. This Special Act includes establishing an area subject to underground safety impact assessment, analysis of ground and geological status, review of effects caused by changes in groundwater, review of ground safety, and establishment of measures to secure underground safety. This study area consists of various strata in order of landfill, sedimentary silt, sedimentary sand, sedimentary gravel, weathering zone, and foundation rock. Also, the slurry wall, a highly rigid underground continuous wall, was chosen as a construction method to consider high water table distribution and minimize the influence of the surroundings in this area. However, ground subsidence occurred on the road nearby in December 2019 due to the inflow of loosening soil to the construction area. Thus, several types of site investigations were conducted to suggest an appropriate analysis method and to find out loosed ground behavior and its area for the subsided site. As a result, new design soil properties were re-calculated, and the reinforcement measures were proposed through analytical verification.

Field Evaluation of Traffic Wandering Effect on Asphalt Pavement Responses (차량의 횡방향 주행이격에 의한 아스팔트 콘크리트 포장의 응답특성 분석)

  • Seo, Youngguk;Kwon, Soon-Min;Lee, Jae-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.453-459
    • /
    • 2006
  • This paper presents an experimental evaluation of wandering effect on asphalt concrete pavement responses. A laser-based wandering system has been developed and its performance is verified under various field conditions. The portable wandering system composed of two laser sensors with Position Sensitive Devices can allow one to measure the distance between laser sensors and tire edges of moving vehicle. Therefore, lateral position of each wheel on the pavement can be determined in a real time manner. Pavement responses due to different loading paths are investigated using a roll over test which is carried out on one of asphalt surfaced pavements in the Korea Highway Corporation test road. The pavement section (A5) consists of 5 cm thick surface course; 7 cm intermediate course; and 18 mm base course, and is heavily instrumented with strain gauges, vertical soil pressure cells and thermo-couples. From the center of wheel paths, seven equally-spaced lateral loading paths are carefully selected over an 140 cm wandering zone. Test results show that lateral horizontal strains in both surface and intermediate courses are mostly compressive right under the loading path and tensile strains start to develop as the loading offset becomes 40 cm from the wheel path. The development of the vertical stresses in the top layers of subbase and anti-frost is found to be minimal once the loading offset becomes 50 cm.