• Title/Summary/Keyword: Road width

Search Result 330, Processing Time 0.032 seconds

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

Study of Flow Characteristics behind a Sunroof Wind Deflector for Wind Noise Reduction (바람소리 저감을 위한 선루프 디플렉터 주위의 유동에 관한 연구)

  • Lee, Dug-Young;Yoon, Jong-Hwan;Shin, Jae-Hyuk;Kim, Sang-Kon
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.17 no.1
    • /
    • pp.182-189
    • /
    • 2009
  • The noise from the sunroof can be divided into the low frequency buffeting noise and the high frequency turbulence noise generated when a car runs at the high driving speed. The wind deflector suppresses the buffeting noise generation by accelerating the vortex shedding from the front edge of sunroof opening, and guides the flow direction so that air can pass smoothly over the sunroof opening. To reduce the buffeting noise and the high frequency noise, it is very important to locate a deflector in a proper position depending on the driving speed and the sunroof opening width. The deflector's sectional shape also plays an important role in efficiently reducing the buffeting and high frequency noise. In this paper, we determined the optimum deflector's sectional shape and examined the flow characteristics behind a sunroof deflector through CFD analysis with changing the deflector height, the driving speed and the sunroof opening width. It is found that the deflector needs to be located in the higher location to control the buffeting noise by shedding the higher frequency vortices to accelerating vortices from the sunroof front edge. The deflector may act as a new noise source at the high driving speed, then it is desirable to put the deflector at the proper height to reduce the flow fluctuations and the noise generation. We also made a road test to verify CFD analysis results in this study.

Development of Lane and Vehicle Headway Direction Recognition System for Military Heavy Equipment's Safe Transport - Based on Kalman Filter and Neural Network - (안전한 군용 중장비 수송을 위한 차선 및 차량 진행 방향 인식 시스템 개발 - 칼만 필터와 신경망을 기반으로 -)

  • Choi, Yeong-Yoon;Choi, Kwang-Mo;Moon, Ho-Seok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.139-147
    • /
    • 2007
  • In military transportation, the use of wide trailer for transporting the large and heavy weight equipments such as tank, armoured vehicle, and mobile gunnery is quite common. So, the vulnerability of causing traffic accidents for these wide military trailer to bump or collide with another car in adjacent lane is very high due to its broad width in excess of its own lane's width. Also, the possibility of these strayed accidents can be increased especially by the careless driver. In this paper, the recognition system of lane and vehicle headway direction is developed to detect the possible collision and warn the driver to prevent the fatal accident. In the system development, Kalman filtering is used first to extract the border of driving lane from the video images supplied by the CCD camera attached to the vehicle and the driving lane detection is completed with regression analysis. Next, the vehicle headway direction is recognized by using neural network scheme with the extracted parameters of the detected driving lane feature. The practical experiments for the developed system are also carried out in the real traffic road of Seoul city area and the results show us the more than 90% accuracy in recognizing the driving lane and vehicle headway direction.

Performance Analysis of Earth Work Using Excavator in the Case of Forest Road Construction (임도공사시(林道工事時) 굴삭기(掘削機)를 이용(利用)한 토공작업(土工作業)의 공정분석(工程分析))

  • Lee, Joon Woo;Park, Bum-Jin
    • Journal of Korean Society of Forest Science
    • /
    • v.87 no.1
    • /
    • pp.82-89
    • /
    • 1998
  • This study was carried out to investigate working time, performance, and to predict performance that related to the factor of forest road in earth work using excavator. It was found that the real working time was 503 minutes in a day. The ratio of real working time and allowance per total working time was approximately 85.7% and 14.3% individually. The rate of soil movement(Sm) to net working time was 38.6%, and earth cutting(Ec) was 32.5%. According to performance analysis, performance of earth work using excavator($0.8m^3$) in straight part was 1.4 times larger than curve part and rock work using excavator($0.8m^3$) which had breaker in straight was 9.1 times larger than earth work using excavator($0.8m^3$) which had bucket. Performance of earth work using excavator($1.0m^3$) was 1.3 times larger than using excavator($0.8m^3$) in straight and curve part. Working performance in earth work using excavator($0.8m^3$) was influenced by the conditions of radius of curve, width of roadway, slope gradient. It is not influenced by diameter and number of root stock.

  • PDF

A Study on the Appropriateness Evaluation of Utilization of green buffer zone - Focusing on green buffer zone, Daejeon City Seo-gu (완충녹지 활용의 적정성 평가 -대전시 서구 완충녹지를 대상으로)

  • Kim, Sun Min;Lee, Shi Young
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • This study was started to study the buffer zone of Daejeon metropolitan city in order to study the policy and environment for the suitability evaluation of the use of green buffer zone. The target of the study was selected as the buffer zone of western buffer, which is frequently used in the Daejeon Metropolitan City, and a preliminary index was selected to evaluate the suitability of the green buffer zone. AHP analysis was conducted to increase the reliability of the preliminary indicators and the weight was analyzed by questionnaires to experts and practitioners. In addition, based on the existing statistical data, we rebuilt the green buffer zone and investigated the current condition, and compared and analyzed the green buffer zone and the places where they did not. The results are as follow. First, unlike the statute interpretation that construction can not be done in buffered green spaces, green buffer zones have been utilized in various ways. However, the lack of advanced citizen consciousness of the residents, the responsibility of the responsible person, and the problem of the management office alone are causing problems. Second, according to the results of AHP questionnaire analysis, functional and stability among the appropriateness indexes of green buffer zone utilization were evaluated highly. Park accessibility and utilization potential also weighed somewhat, and it was judged that the epochal trend was more important in the use of green buffer zones. Third, analysis of the status of Western green buffer zones in Daejeon showed that the utilization rate was more than half. This suggests the necessity of judging the appropriateness of the application of the green buffer zone effectively due to the change of the perception of the green buffer zone of the residents. Fourth, as a result of comparing and analyzing the site where the site is used and the site where it is not, it is found that it is used within a range that does not greatly affect each index. However, as the stability has decreased, we have decided that the utilization method is most damaging to the green zone, and we should strive to improve the stability in future. Finally, the analysis of a red clay road and a red clay road sites decreased from Class I of stability to Grade II. However, the fall figure showed a difference between the 13 % drop rate of the target location and the 5% decline rate of utilization. The difference was analyzed as the difference of width of a red clay road. This can be regarded as one of the ways of damaging the green zone to the minimum extent, which is a great advantage in selecting the future utilization plan.

A Study on the Analysis of Street Types in Low-rise Residential Areas Considering Street Parking (노상주차를 고려한 저층주거지 가로유형 분류에 관한 연구)

  • Lim, Hyunseok;Kim, Jaecheol
    • Journal of Digital Convergence
    • /
    • v.18 no.8
    • /
    • pp.69-83
    • /
    • 2020
  • The purpose of this study is to classify the types of street parking in low-rise residential areas. First of all, prior research was reviewed to examine the background of occurance and the process of change of low-rise residential areas. and derive factors that affect the street environment. Next, based on the selection criteria, the residential area of Bangi 2-dong, Songpa-gu was selected as the site of the case and the status analysis was conducted on streets, buildings, and on-road parking. The summary of the results is on-road parking usually occurs on residential streets where social consensus is difficult to reach, suggesting that alternatives to on-road parking in residential areas are needed. Based on the results of the previous analysis, street types were classified considering the characteristics of streets, structures and street parking. Then, the characteristics of each type of street were analyzed and implication for improving the street environment were suggested. In addition, the results of the classification of street types confirmed that different street parking occurred depending on the width of the street and the use of the lower floors, even if it was the same area, and that a solution was needed accordingly.

Study on Influencing Factors of Traffic Accidents in Urban Tunnel Using Quantification Theory (In Busan Metropolitan City) (수량화 이론을 이용한 도시부 터널 내 교통사고 영향요인에 관한 연구 - 부산광역시를 중심으로 -)

  • Lim, Chang Sik;Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.173-185
    • /
    • 2015
  • This study aims to investigate the characteristics and types of car accidents and establish a prediction model by analyzing 456 car accidents having occurred in the 11 tunnels in Busan, through statistical analysis techniques. The results of this study can be summarized as below. As a result of analyzing the characteristics of car accidents, it was found that 64.9% of all the car accidents took place in the tunnels between 08:00 and 18:00, which was higher than 45.8 to 46.1% of the car accidents in common roads. As a result of analyzing the types of car accidents, the car-to-car accident type was the majority, and the sole-car accident type in the tunnels was relatively high, compared to that in common roads. Besides, people at the age between 21 and 40 were most involved in car accidents, and in the vehicle type of the first party to car accidents, trucks showed a high proportion, and in the cloud cover, rainy days or cloudy days showed a high proportion unlike clear days. As a result of analyzing the principal components of car accident influence factors, it was found that the first principal components were road, tunnel structure and traffic flow-related factors, the second principal components lighting facility and road structure-related factors, the third principal factors stand-by and lighting facility-related factors, the fourth principal components human and time series-related factors, the fifth principal components human-related factors, the sixth principal components vehicle and traffic flow-related factors, and the seventh principal components meteorological factors. As a result of classifying car accident spots, there were 5 optimized groups classified, and as a result of analyzing each group based on Quantification Theory Type I, it was found that the first group showed low explanation power for the prediction model, while the fourth group showed a middle explanation power and the second, third and fifth groups showed high explanation power for the prediction model. Out of all the items(principal components) over 0.2(a weak correlation) in the partial correlation coefficient absolute value of the prediction model, this study analyzed variables including road environment variables. As a result, main examination items were summarized as proper traffic flow processing, cross-section composition(the width of a road), tunnel structure(the length of a tunnel), the lineal of a road, ventilation facilities and lighting facilities.

Effect of Air Pollution on Cherry Tree (Prunus yedoensis Matsumara) Planted on National Roadsides between Cheonju and Kunsan City(II) - Chlorophyll, Magnesium and Sodium Contents in the Leaves - (대기오염(大氣汚染)이 전주(全州)-군산간(群山間) 국도변(國道邊) 왕벚나무에 미치는 영향(影響)(II) - Chlorophyll, Mg 및 Na 함유량(含有量)을 중심으로 -)

  • Hwang, Yu Chul;Kim, Chang Ho;Yim, Kyong Bin
    • Journal of Korean Society of Forest Science
    • /
    • v.81 no.3
    • /
    • pp.224-233
    • /
    • 1992
  • This report succeds the previous paper, the source of materials and statistical designs used were not altered. Under the hypothesis of maleffect of atmospheric pollutions emitted mainly by traffic automobiles on 20-year-old, Prunus yedoensis roadside trees planted along national road between Cheonju abd Kunsan, chlorophyll a and b contents, magnesium and sodium contents of leaves were analysed on September 15. Besides control sites considered to be a pollution free district, 20 polluted road-side sites, 10 on left roadside and 10 on right roadside, oppositely faced in pairs were selected. The leaves collected from 5 trees at each sampling site were bulked to eliminate the individual tree variation. Chlorophyll were extracted by Mackinney and Arnon method. The results obtained are as follows : 1. The planting belt width between road shoulder and paved road face edge for cherry trees, 160~170cm, was considered too narrow for the growing space. 2. On an average, the total chlorophyll content between Cheonju and Iri($8.60{\sim}9.31ml/cm^2$) was lower than that for between Iri and Kunsan($9.24{\sim}10.74ml/cm^2$). 3. The chlorophyll b content showed the difference, higher on right roadside and lower on left side. However this difference could be confirmed by matched pair T-test at 10% level. 4. Without exception, the chlorophyll contents of control sites were higher than those of road-side trees, implying the maleffect of atmospheric pollutants on cherry tree growth. 5. On the contrary, magnesium and sodium contents of the leaves of road-side trees were higher than that of control site trees.

  • PDF

A Study on the Methodology of Land-Consolidation Sloping Paddies in land Vallry for the Farm-Mechanization (II) (기계화를 전제로 한 산간경사지답경지정리방안에 관한 연구(II))

  • Hwang, Eun
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.4
    • /
    • pp.57-68
    • /
    • 1982
  • The paddy fiels slope located in Kangweon province Hwyongsung gun Gonggeun myon Shinchonri was considerably steep and so it was impossible to economically consolidate the field up to date. But for the porpose of farm mechanization, the field (32. 27ha) was consolidated by the auther under the assitance of the Ministry of Agriculture and Fishery and,;the Administration of Kangweon province. This paddy field consolidation was caused by the treatise on "Land-consolidation methods for farm mechanization in the steep-sloped paddy field", of which the auther is the same. The constrution was carried out from September, 1981 to April, 1982. During the 4esign and construction, some Peculiarities were found and discussed. That is, in design, besides the common condititions for a design, some special conditions were considered and written below; (1) The ranges of field slope in this design were 1/100-1/30. (2) Long sides of the land readjustment blocks must be arranged abreast contour line, and so they make the amount of cutting and banking decreased so as to take the maximum advantage of the configuration of the field. (3) In design, the main principles of dividing blocks were written below; i) First of all, long side of a block should be drawn straight abreast a contour line. ii) Long side of a block should arrange abreast contour line and make its length 100-150m, if not, l)reak the side in order to make a bended rectangle. iii) Length of a short side should be determinded within differences of elevation (0.6 -1. 2m) between the two adjacent blocks toward the normal to a contour line. iv) Length of a short side should be above 15m and the ratio of long and short side should be slso kept 1: (4-6). v) A new field surface leveling was determinded from the elevation which produce the least amount of cuttingand banking within the range of 0.6-1. 2m diffe rences of elevation between the two adjacent blocks. vi) In the course of dividing blocks with the same width along the line which was normal to a contour line, all blocks connot keep their shape in a retangle because of steep slope of the field and so on, and so it was also necessory to make some non-retanglar and small blocks such as a trianglar or trapezoidal shape, which was impossible to use some of farm machinery. But because this non-rectanglar and small blocks were divided, larger and many rectanglar blocks can be divided and construction cost can also be lowered. According to the conditions discussed above, the paddy field consolidation project designed and constructed. And the results of this study were obtained as below; (1) Three-forth of total cost of this paddy field consolidation was not construction cost, and these cost consist of land grading (1/4), road and canal construction cost (1/4) and the other cost (1/4) such as surveying or materials and 56 on. (2) The steeper the land slope, the greater cost was assigned for road and canal construction, and than land grading. (3) Curtailment of the road and canal construction cost depended on simplificating their strutures. (4) In the case of the land slopes were low, the land grading cost was high by 1: 1.4 in comparison with the road and canal construction cost, and conversely when the slops were steep, the road and canal construction cost was high by 1 : 5 in compa- rison with the land grading cost. (5) The densities of irrigation canal, drainage canal and trunk and branch road were 150. Sm/ha, 60. im/ha and 17. 4m/ha respectively. The density of irrigation canal of the area was high by 2 times in comparison with the average one of Kangweon Province, and the others were nearly the same. (6) Most farmers (above 85%) knew the effects of paddy field consolidation. The effects are; 1) Improvement of irrigation 2) Improvement of farm management 3) Improvement of transportarion 4) farm mechanization and 5) grouping of the scattered land. And the more farm modernization was accomplished by these projects, the more farmers wanted to live in their land. (7) In spite of the very steep sloped paddy field, the diminution rate of the net farm land caused by consolidation was 7.7% which was nearly the same as the one of Chulweon plain of Kangweon province. Land grading cost was 971, OOOwon/ha which was rather cheap by 13.2% than the one of Ghulweon plain, and unit construction cost was 5, 341, OOOwon/ha (included soil addition) which was also nearly the same as the one of Chulweon plain and FNFIA (The federation of national farmland improvement association).

  • PDF

Tie Spatial Structure of Ch'ang-ts'ai-ts'un Village A Case Study on a Rural Village of Korean Immigrants in Yen-pien Area of China (중국(中國) 연변지구(延邊地區) 조선족(朝鮮族)마을의 구성(構成) 룡정시 지신향 장재촌을 대상으로)

  • Lee, Kyu Sung
    • Journal of architectural history
    • /
    • v.3 no.1
    • /
    • pp.83-99
    • /
    • 1994
  • Ch'ang-Ts'al-Ts'un is a rural Village near Lung-jing City in Yen-pien Korean Autonomous Province of China. It was formed about 100 years ago by Korean Immigrants and has been developed maintaing the characteristics of traditional Korean architecture. Therefore investigating the spatial structure of this village is a meanigful work to confirm and explore one branch of Korean architecture. This study aims at analyzing the spatial structure of the village using direct data collected from the field work and indirect data from books and maps. The field work consists of on-the-site survey of the village layout, interviews of residents, observation notes and photography. Ch'ang-Ts'ai-Ts'un is located 360-370 m high above the sea level and at the side of a long valley. A river flows in the middle of the valley and relatively flat arable land exists at the both sides of the river. The location of the village related to the surrounding river and mountains suggests that the site of the village was chosen according to Feng-Shui, Chinese and Korean traditional architectural theory. The main direction of the house layouts is South-western. The village has been growing gradually until today. Therefore it is meaningful to make the village layout before Liberation(1946 A.D.) because the characteristics of Korean architecture prevailed more in that period. The area of the previous village is limited to the west side of the creek. New houses were later added to the east of the creek, forming a 'New Village'. Previously the village was composed of 3 small villages: Up, Middle and Down. Also the main access roads connecting the village with the neighboring villages were penetrating the village transversely. Presently the main access road comes to the village longitudinally from the main highway located in front of the village. The retrospective layout shows the existence of well-formed Territory, Places and Axes, thus suggesting a coherent Micro-cosmos. The boundary of imaginery territory perceived by present residents could be defined by linking conspicous outside places sorrounding the village such as Five-mountains, Front-mountain, Shin-dong village, Standing-rock, Rear-mountain and Myong-dong village. Inside the territory there are also the important places such as Bus-stop, Memorial tower of patriots, Road-maitenance building and the village itself. And inside it 5 transverse and 1 longitudinal axes exist in the form of river, roads and mountains. The perceived spatial structure of the village formed by Places, Axes and Territory is geometrical and well-balanced and suggests this village is fit for human settlement. The administrative area of the village is about 738 ha, 27 % of which is cultivated land and the rest is mountain area. Initially the village and surrounndings were covered with natural forest But the trees have been gradually cut down for building and warning houses, resulting in the present barren and artificial landscape with bare mountains and cultivated land. At present the area of the village occupied by houses is wedge-shaped, 600 m wide and 220 m deep in its maximum. The total area of the village is $122,175m^{2}$. The area and the rate of each sub-division arc as follow. 116 house-lots $91,465m^{2}$ (74.9 %) Land for public buildings and shops $2,980m^{2}$ (2.4 %) Roads $17,106m^{2}$ (14.0 %) Creek $1,356m^{2}$ (1.1 %) Vacant spaces and others $9,268m^{2}$ (7.6 %) TOTAL $122,175m^{2}$ (100.0 %) Each lot is fenced around with vertical wooden pannels 1.5-1.8 m high and each house is located to the backside of the lot. The open space of a lot is sub-divided into three areas using the same wooden fence: Front yard, Back yard and Access area. Front and back yards are generally used for crop-cultivation, the custom of which is rare in Korea. The number of lots is 116 and the average size of area is $694.7m^{2}$. Outdoor spaces in the village such as roads, vacant spaces, front yard of the cultural hall, front yard of shops and spacse around the creek are good 'behavioral settings' frequently used by residents for play, chatting, drinking and movie-watching. The road system of the village is net-shaped, having T-junctions in intersections. The road could be graded to 4 categories according to their functions: Access roads, Inner trunk roads, Connecting roads and Culs-de-sac. The total length of the road inside the village is 3,709 m and the average width is 4.6 m. The main direction of the road in the village is NNE-SSE and ESE-WNW, crossing with right angles. Conclusively, the spatial structure of Ch'ang-Ts'ai-Ts'un village consists of various components in different dimensions and these components form a coherent structure in each dimension. Therefore the village has a proper spatial structure meaningful and appropriate for human living.

  • PDF