• Title/Summary/Keyword: Road project

Search Result 534, Processing Time 0.027 seconds

Feasibility Analysis Information Model for Road Construction Projects (도로 프로젝트의 타당성분석 정보모델 구축방안)

  • Yang Jin-Kook;Kim Soo-Yong;An Dong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-384
    • /
    • 2002
  • A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.

  • PDF

Evaluation of Environmental Stress for Highway Construction Project by Life Cycle Assessment Method (전과정평가기법에 의한 도로건설공사 환경부하량 평가 연구)

  • Moon, Jinseok;Ju, Kibeom;Seo, MyoungBae;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.83-91
    • /
    • 2014
  • The global community demands the reduction of environmental pollution such as greenhouse gas and carbon dioxide emissions. According to these requirements, the road construction project in the highest energy consuming industry is required the efficient way of reducing environmental pollution emissions. In this study, during the whole life cycle process, an environment impact assessment was performed for the several road construction projects in order to evaluate environmental stress through the road construction process. This study provides a proper process of environment impact assessment for life cycle assessment (LCA) analysis of road construction project, and figures the environmental stress regarding to the major construction materials for the case projects. In addition, this study conducted a sensitivity analysis for the key materials of environmental stress through the quantity analysis of major materials for the 1km section of a road construction. By this sensitivity analysis of total environmental stress change from the different volumes of constructing materials, it would be useful information for the environment impact assessment for the future road construction project.

An Application of Simulation Method to Planning of Road Pavement Operation (시뮬레이션을 이용한 도로포장 공정계획의 수립방안)

  • Ohn, Seong-Won;Kim, Ok-Ki;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.124-131
    • /
    • 2007
  • Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.

Estimating Traffic Accident Reduction Effect of Road Safety Facilities in Intersesctions (교차로에서의 도로·교통안전시설물의 교통사고 감소효과도 추정)

  • YOON, Yeo Il;LEE, Soo Beom;LIM, Joon Beom;PARK, Kil Soo;MOON, Jeong Sik
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.2
    • /
    • pp.129-142
    • /
    • 2017
  • Accident Black Spot Improvement Project is the representative road safety intervention to eliminate environmental risk factors on the roadway by installing road safety facilities. Although it is one of the main road safety projects in Korea, there has been a lack of effort analyzing the traffic accident reduction effects of this project. In this study, therefore, we selected 4,171 road black spots from 2004 to 2013 and investigated the traffic accident reduction effects of 5 road safety facilities by using "Comparison Group(C-G)" method. Through the analysis, it was found that the number of traffic accidents were lowered by 4.45% with traffic islands, 32.17% with road paved markers, and 24.13% with speed cameras, respectively. However, 0.61% with pedestrian fencing and 1.67% with skid resistant pavement were increased on the other hand. In addition, we also analyzed traffic accident reduction facilities' performance on specific types of collision mentioned in manual on road safety facilities by Ministry of Land, Infrastructure and Transport. It was shown that the number of bad weather traffic accidents were reduced by 52.96% with road paved markers, pedestrians accidents were reduced by 62.77% with pedestrian fencing and rear-end collisions were reduced by 26.00% with skid resistant pavement.

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

ANALYZING CAUSES OF CHANGE ORDERS IN KOREA ROAD PROJECTS

  • Kang-Wook Lee;Wooyong Jung;Seung Heon Han;Byeong-Heon Yoon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1283-1287
    • /
    • 2009
  • The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.

  • PDF

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

A Cost-Benefit Analysis of Road Construction in International Development Cooperation Project - A Case of KOICA's Lao Cai Happiness Program in Vietnam - (국제개발협력사업의 마을도로 건설 비용편익 분석 - KOICA 베트남 라오까이 행복프로그램 적용사례 -)

  • Lee, Ah-Youn;Kong, Ki-Seo;Yoon, Seong-Soo;Song, Yang-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.137-144
    • /
    • 2018
  • The purpose of this study is to measure the cost-benefit of a road construction project in Vietnam through international development cooperation, which includes private grants and Official Development Assistance(ODA). In developing countries, it is difficult and costly to use data on markets, the CVM(Contingent Valuation Method) to measure the WTP(Willingness-to-Pay) as the benefits of road construction are used. A total of 232 villagers in 16 villages of Lao Cai Province in Northern Vietnam have been surveyed. It is found that the Benefit-Cost Ratio(B/C) in all 3 models are found to be well over 1.0, ranging from 2.8 to 3.64 with the discount rate of 0.06. These BC ratios imply the road construction project in Lao Cai can be justified. Also, it is found that the shortened travel time is the most relevant factor for WTP among direct benefits and the enhanced academic achievement of the children is the most relevant factor among indirect benefits, due to easier and faster access to schools, which in turn increase the school attendance rate. The result of this study can be used to justify other similar projects in Vietnam, even though the benefits may have to be reassessed in other countries.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.