Implementation of Time Management; Based on Road Construction Projects (공정관리 적용에 관한 연구: 도로현장 중심으로)

  • Lee, Kyu-Sun;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.451-456
    • /
    • 2011
  • There is a relationship between effective time management and project success. Therefore, advanced time management techniques have recently been introduced. This paper investigates the current time management practices for road construction sites and proposes lean construction practices to effectively implement time management. This would be helpful to establish an effective schedule plan. Also, an efficient construction site time management system can be developed base on this fundamental research. Furthermore, future research should be performed to investigate the performance of lean construction.

Changes in Parks and Green Spaces Ratio According to Land Ownership Processing Method in Urban Development

  • Lee, Sang Jo;Huh, Keun Young;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.21 no.6
    • /
    • pp.545-555
    • /
    • 2018
  • The purpose of this study was to analyze land use plans of 61 residential complexes and identify the factors that caused the variation of urban parks and green space ratio depending on the land ownership processing method. The ratio of urban parks and green space of expropriation districts was higher than that of replotting districts. Within the same city and country as well as other regions, the parks and green space ratio of land expropriation districts increased higher than 7% compared to that of replotting districts. The variation of urban parks and green space ratio was mainly related to the ratio of road. Small housing complexes such as detached house and quasi-residential sites resulted to expand space for road construction, thus, the areas of urban parks or green space came to reduce. The average urban parks and green space ratio in the urban development by the expropriation method and replotting method are 24.5% and 16.8% respectively. In order to prevent the reduction of urban parks and green space ratio according to the preference of detached house sites or quasi-residential sites in development zones, it is necessary to make systematic adjustment such as adjusting the urban parks and green space ratio securing standard.

Forecasting tunnel path geology using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ali, Hunar Farid Hama;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.359-374
    • /
    • 2022
  • Geology conditions are crucial in decision-making during the planning and design phase of a tunnel project. Estimation of the geology conditions of road tunnels is subject to significant uncertainties. In this work, the effectiveness of a novel regression method in estimating geological or geotechnical parameters of road tunnel projects was explored. This method, called Gaussian process regression (GPR), formulates the learning of the regressor within a Bayesian framework. The GPR model was trained with data of old tunnel projects. To verify its feasibility, the GPR technique was applied to a road tunnel to predict the state of three geological/geomechanical parameters of Rock Mass Rating (RMR), Rock Structure Rating (RSR) and Q-value. Finally, in order to validate the GPR approach, the forecasted results were compared to the field-observed results. From this comparison, it was concluded that, the GPR is presented very good predictions. The R-squared values between the predicted results of the GPR vs. field-observed results for the RMR, RSR and Q-value were obtained equal to 0.8581, 0.8148 and 0.8788, respectively.

A Markov-based prediction model of tunnel geology, construction time, and construction costs

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Ali, Hunar Farid Hama;Salim, Sirwan Ghafoor;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • v.28 no.4
    • /
    • pp.421-435
    • /
    • 2022
  • The necessity of estimating the time and cost required for tunnel construction has led to extensive research in this regard. Since geological conditions are significant factors in terms of time and cost of road tunnels, considering these conditions is crucial. Uncertainties about the geological conditions of a tunnel alignment cause difficulties in planning ahead of the required construction time and costs. In this paper, the continuous-space, discrete-state Markov process has been used to predict geological conditions. The Monte-Carlo (MC) simulation (MCS) method is employed to estimate the construction time and costs of a road tunnel project using the input data obtained from six tunneling expert questionnaires. In the first case, the input data obtained from each expert are individually considered and in the second case, they are simultaneously considered. Finally, a comparison of these two modes based on the technique presented in this article suggests considering views of several experts simultaneously to reduce uncertainties and ensure the results obtained for geological conditions and the construction time and costs.

A STUDY ON THE LIFE-CYCLE FOR SELECTING A GRATING

  • Yun-Sik Kim;Dong-Wan Kang;Taehoon Hong;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1189-1194
    • /
    • 2009
  • A gutter-shaped U grating is a facility that is installed at the sides of a road to provide pedestrians with a rainwater-free road. The previous studies on this facility focused mainly on the progress of the efforts that are being made to improve its performance and interception efficiency so as to prevent damages in regional areas due to the heavy rains caused by climate change. The studies on its maintenance, however, are still inadequate. Therefore, this study was conducted to analyze and compare the life cycle costs and performance evaluations of the steel and magic gratings, which are installed in apartments. The results of the study show that the replacement period and rate of gratings differ depending on where they are installed. The initial capital investment cost of a magic grating installed at a road where many vehicles pass is quite high, but in terms of its maintenance and entire-life-cycle costs, its total expenses are lower than those of a steel grating. The results of this study are expected to serve as preliminary data for the selection of an adequate grating that is suitable for particular places in the design phase of construction projects.

  • PDF

A Study on Revising Construction Cost Calculation for Road Paving Maintenance Work (도로포장 유지보수 공사비산정기준 개정에 대한 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.155-156
    • /
    • 2020
  • Unlike new construction projects, road paving maintenance work shows large productivity discrepancies depending on the conditions of the worksite. The current construction cost calculation scheme, however, only provides daily construction volume categorized by work scope and scale: There are no detailed standards that can be implemented on various types of worksites. To develop standards that enable the calculation of appropriate construction costs by taking into account worksite conditions, the current study conducted on-site surveys and interviews. The on-site research and analysis revealed that location, construction width, the day's worksite lot, work scope, and construction objectives were found to cause differences in construction volume. In addition to the existing work scope and work scape variables, the current study added weight constants reflecting the daily work volume based on movement conditions at site and the size of the worksite lot. In this process, the current study found that even one type of construction project can have fifteen different levels of daily construction volume. Such detailed classification was deemed to enable the proper calculation of construction costs based on worksite conditions.

  • PDF

A Study on the Application of Smart Safety Technology at Construction Sites in South Korea

  • Choi, Ji-Sun;Hwang, Hoon-Hee;Ryu, Suzy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.153-161
    • /
    • 2022
  • Among all industries, the construction industry still remains a traditional one with low productivity due to its labor-intensive and field-dependent production system, its supplier-oriented industrial structure, and the disruption of the information flow between participants. In addition, the construction industry in South Korea has recently been required to transform itself according to social trends such as aging, the reduction of skilled workers, and the shortening of working hours, and the disaster and death rates in the industry, which are more than twice as high as those in other industries, are making it more necessary to solve chronic safety problems. Therefore, the purpose of this study is to grasp the actual condition of safety management on construction sites in South Korea and analyze cases of K-smart technology utilization for preventing safety accidents on construction sites. The study investigated and analyzed the following. First, construction sites in South Korea were analyzed by type of safety accident, by type of construction, and by construction contract amount. Second, the current status of accidents on small-sized construction sites with a high fatal accident rate and cases of safety accidents on construction sites were investigated. The results of the study are expected to contribute to the dissemination and spread of smart safety technology for not only identifying major factors in safety accidents that occur on construction sites but also preventing workers from suffering accidents.

  • PDF

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

Application of Image Processing Techniques in Civil Engineering (건설 분야에 있어서 이미지 프로세싱 기술의 활용)

  • Shon Hong-Gyoo;Park Choung-Hwan;Lee Chul-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.58-62
    • /
    • 2006
  • In construction fields. numerous studies have attempted to find the solution of various emerging problems by the introduction of the high technologies of other areas in recent years. In Korea, based on the best IT infrastructure, much experimental studies which are trying to utilizing Photogrammetry, GSISC(Geo-Spatial Information System, Remote Sensing in construction project has been done. The purpose of this study is to analyze the trend of the technologies in the related-fields and examine the detailed image processing techniques. Moreover this paper provides the preparation to create technology road map for systematic research.

  • PDF

Study of Kaesung Industrial Complex rail traffic increment (개성공단 철도운송 활성화 방안연구)

  • Cho, Chi-Hyun;Yoon, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.732-741
    • /
    • 2008
  • After freight train line opening between Munsan of South Korea and Bongdong of North Korea last December 2007, people's expectation and interest about trans North-South and continental railways have been increasing. However, the commercial traffic of freight by train has not been increased as much as we expected in the mean time road traffic is more increased. This study examined the Kaesong industrial complex which has a high rail accessibility. Especially, we interviewed the owners of enterprises in Kaesong to integrate their opinions for deriving the problems and improving the business conditions. Also, this study embodied the methods for improving rail freight traffic between North and South Korea. Based on this study, we expect more research will carry out on this field to reform the operation system of trans Korea railways by Kaesong industrial complex development project and the commercial reconversion from road to rail.