• 제목/요약/키워드: Road management system

검색결과 738건 처리시간 0.036초

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

한국형 고속열차 고장정보체계 구축 및 활용 (Establishment and Application of Failure Reporting and Corrective Action System for Korean High Speed Train)

  • 이태형;서승일;박춘수;유한성;김기환
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.39-45
    • /
    • 2005
  • Systems Engineering is the process that controls the technical system development effort with the goal of achieving an optimum balance of all system elements. FRACAS(Failure Reporting an d Corrective Action System) is one of RAMS(Reliability, Availability, Maintainability, Safety) tasks which is conducted from a manufacturing phase. FRACAS is to determine the basic cause of failure resulting from design or manufacture, and to provide a closed-loop method of implementing corrective action. This paper presents the FRACAS established for assessment of the reliability, the analysis and management of the failure data for Korean High Speed Train and application cases.

  • PDF

실시간 운전 특성 모니터링 시스템을 위한 차량 환경 개발 (Development of Vehicle Environment for Real-time Driving Behavior Monitoring System)

  • 김만호;손준우;이용태;신승헌
    • 대한인간공학회지
    • /
    • 제29권1호
    • /
    • pp.17-24
    • /
    • 2010
  • There has been recent interest in intelligent vehicle technologies, such as advanced driver assistance systems (ADASs) or in-vehicle information systems (IVISs) that offer a significant enhancement of safety and convenience to drivers and passengers. However, unsuitable design of HMI (Human Machine Interface) must increase driver distraction and workload, which in turn increase the chance of traffic accidents. Distraction in particular often occurs under a heavy driving workload due to multitasking with various electronic devices like a cell phone or a navigation system while driving. According to the 2005 road traffic accidents in Korea report published by the ROad Traffic Authority (ROTA), more than 60% of the traffic accidents are related to driver error caused by distraction. This paper suggests the structure of vehicle environment for real-time driving behavior monitoring system while driving which is can be used the driver workload management systems (DWMS). On-road experiment results showed the feasibility of the suggested vehicle environment for driving behavior monitoring system.

노면 종.횡단 요철 자동 측정 시스템 개발 (Development of an Automatic Transverse and Longitudinal Road Profile Measurement System)

  • 엄정현;서동선;허웅;류명찬;김준범
    • 전기전자학회논문지
    • /
    • 제5권1호
    • /
    • pp.75-84
    • /
    • 2001
  • 도로 노면상태와 관련된 신뢰성 있는 데이터는 도로 유지 및 관리 당국과 운전자에게 도로 노면상태에 대한 정보를 제공하기 위해 그 중요성이 날로 증대하고 있다. 본 논문은 새로운 고속의 자동 노면 데이터 획득장치의 개발에 관한 것이다. 개발된 장치는 100km/h의 주행속도에서 도로노면 청단 전체 폭에 대해 30cm 간격으로 종단 노면 데이터를 수집하고, 수집된 데이터로부터 국제평탄성지수(IRI)를 계산하여 노면요철 데이터와 함께 스크린상에 디스플레이 한다. 이 같은 시스템의 구현을 위해 광학적 거리측정기, 계측차량의 진행거리 및 움직임 계측기, 데이터 처리 및 디스플레이 모듈을 고안하였다. 70km/h의 주행 속도로 측정한 결과, 개발된 시스템의 측정 정확도는 표준 노면에 대해 IRI에서 ${\pm}0.1m/km$ 정도의 오차를 보이는 것으로 나타났다. 또한, 개발된 장비의 성능을 검증하기 위해 이미 포설된 노면에 대한 측정을 수행하여 기존 장비 및 육안 측정 결과와 비교하였다.

  • PDF

GSIS를 이용한 효율적 도로선형 정보의 구축 - 평면 및 종단선형을 중심으로 - (Building of Efficient Route Alignment Information using GSIS -Focused on plan and vertical alignment-)

  • 강상구;정영동
    • 한국측량학회지
    • /
    • 제18권4호
    • /
    • pp.325-333
    • /
    • 2000
  • 일반적으로 도로종합관리 체계를 위해 이용되는 도면은 스캐너로 받아들인 도면으로 이는 도면보존 상태라든가 스캐너의 해상도에 따라 원 도면의 선명도가 결정되고 도면에 따른 데이터가 따로 첨부되어 관리되는 단점을 가지고 있다. 이에 본 연구에서는 도로설계전용 프로그램인 RP(Road Project 2.1)를 이용해 지방도 일부 구간의 도로평면선형과 종단선형을 설계하고 완성된 도면자료는 *.dxf형태로, 그에 대한 속성자료는 *.dbf형태로 직접 저장하여 PC ArcView프로그램과 Excel을 이용해 도면과 데이터를 일괄적으로 관리 할 수 있는 실시간 도로선형정보 체계를 구축하였고, 유사한 도로설계시 도면과 데이터를 일괄적으로 쉽게 검색 할 수 있어 예비설계의 기초자료로 활용할 수 있을 것으로 판단된다.

  • PDF

교통흐름의 수학적 모형 (Mathematical Modeling for Traffic Flow)

  • 이성철
    • 대한안전경영과학회지
    • /
    • 제13권1호
    • /
    • pp.127-131
    • /
    • 2011
  • Even if there are no causing factors such as car crash and road works, traffic congestion come from traffic growth on the road. In this case, estimation of traffic flow helps find the solution of traffic congestion problem. In this paper, we present a optimization model which used on traffic equilibrium problem and studied the problem of inverting shortest path sets for complex traffic system. And we also develop pivotal decomposition algorithm for reliability function of complex traffic system. Several examples are illustrated.

Design and implementation of a GIS-based accident management system using tracking technique

  • Niaraki Abolghasem Sadeghi;Kim Kye-Hyun
    • 한국공간정보시스템학회 논문지
    • /
    • 제8권2호
    • /
    • pp.1-11
    • /
    • 2006
  • This paper addresses a GIS (Geographic Information System) based system in order to reduce the rate of public transportation accidents occurring in Iranian roads network. Over the years, the road accidents are a major issue throughout the world. Today, particular consideration is given to those technologies which can lead to diminish on the number of critical incidents. One of the main factors resulting in accidents and fatalities rates growth is the speed violation of buses in Iranian road network. The conventional speed controlling approach in Iran based on the Tachograph which records vehicle's speed, time, and stoppage in the mechanical processing has many problems. Hence, this research is intended to design and implement a GIS-based system to manage road accident of Bus transportation system using offline tracking system. This was accomplished using a GIS-based technique that encompasses three steps. The first step is developing a GIS-based accident system. The second step includes designing and applying a tracking system inside 90 buses for recording Bus information for speed controlling. Lastly, by using mentioned system in police center, the illegal drivers' punishment would be considered properly. Overall, this system has been successfully applied in this work. Therefore, the police and transportation office are able to control and make policy to diminish the number of accident. It is anticipated that online tracking system through the Web GIS would be utilized In this system in the near future.

  • PDF

시험도로 건설과 계측시스템 구축 (A Review of Instrumentation System and Construction of Korea Highway Test Road)

  • 최준성;김도형;김성환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 가을 학술발표회 논문집
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 - (An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC -)

  • 박효성;김낙석
    • 대한토목학회논문집
    • /
    • 제36권2호
    • /
    • pp.269-276
    • /
    • 2016
  • 최근 책임감리제도가 CM제도로 전환되고 ICEC 등급체계가 도입되는 과정에 건설관련 단체들은 국토교통부에 수시로 의견을 제시하고 있다. 그러나 그 정책 변화에 대하여 도로건설기술자들이 어떻게 인식하고 있는지 조사된 자료가 없다. 본 연구에서는 건설기술교육원에서 직무교육을 받고 있는 도로건설기술자들을 대상으로 CM과 ICEC 등급체계에 대하여 2차례 설문조사를 실시하고 분석하였다. 도로건설기술자들의 응답 추세는 외부 기관에 별도로 의뢰한 설문조사를 통하여 검증하였다. 그 결과를 토대로 하여 엔지니어링업계의 국제경쟁력을 높일 수 있는 건설정책 개선안을 도출하였다.