The asphalt pavement is usually non-uniform since achieving a non-segregated and homogeneous asphalt mixture is very difficult. The segregation can occur in the mixed material before it is fed onto the road and it become segregated as it is being placed onto the road surface. Note that this segregation determines the performance of the asphalt pavement. Hence, it is necessary to check the segregation by estimating the density of the asphalt pavement in the field. In this paper, a research on estimating the density of the asphalt mixture by measuring the dielectric constant of the material is conducted. An RF transceiver and an antenna are designed and tested to a series of asphalt density samples, and discussions are shown.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2006.05a
/
pp.277-282
/
2006
Road traffic noise is not produced by any one factor rather occurs as a composition of various factors. Its occurrence is made by running engine noise, tire frictional, and exhaust noise etc. The quality of the noise depends on the size of the vehicles, rotation and engine speed, vehicle load, package state of the road and incline etc. The occurrence of noise level of heavy trucks appears louder than smaller vehicles and the noise levels produced differs according to speed and load etc between similar size vehicles. Other factors such as traffic density, average speed, mixing rate of heavy vehicles, and the distance between vehicles also generate road traffic noise. In this paper we examine 2, 4, and 6-lane roads in Jeonju. Consequently, this study examined the means used to measure road traffic noise. It was found that when there is a large traffic density and the average velocity is below 70 km/hr, the noise level could receive a relative proper value by the current measuring means. But in the case of night-time, it was found that the current measuring method is inapposite.
Journal of the Korea Institute of Military Science and Technology
/
v.12
no.3
/
pp.266-271
/
2009
Electronic equipments and a missile carried by heavy trucks are often subjected to vibration and shock excitation during their transportation. Electronic equipments are so vulnerable to vibration and shock input that it is necessary to know in advance the vibration level of the truck which cause the damage of equipments. Road tests of a heavy truck carrying a canister on different road conditions such as paved road, unpaved road, and washboard are performed and the effect of road conditions on the vibration characteristics are analyzed. Vibration levels were measured at various locations of the truck along the path through which vibration was transmitted. This study reveals that the velocity of the truck as well as the road surface conditions are main factors which affect the vibration levels of the truck. The power spectrum density of the measured vibration signal and the factors affecting the PSD are also analyzed in this paper.
Li, He;Bok, Kyoung Soo;Lim, Jong Tae;Lee, Byoung Yup;Yoo, Jae Soo
Journal of Electrical Engineering and Technology
/
v.10
no.4
/
pp.1836-1842
/
2015
On road networks, the clustering of moving objects is important for traffic monitoring and routes recommendation. The existing schemes find out density route by considering the number of vehicles in a road segment. Since they don’t consider the features of each road segment such as width, length, and directions in a road network, the results are not correct in some real road networks. To overcome such problems, we propose a clustering method for congested routes discovering from the trajectories of moving objects on road networks. The proposed scheme can be divided into three steps. First, it divides each road network into segments with different width, length, and directions. Second, the congested road segments are detected through analyzing the trajectories of moving objects on the road network. The saturation degree of each road segment and the average moving speed of vehicles in a road segment are computed to detect the congested road segments. Finally, we compute the final congested routes by using a clustering scheme. The experimental results showed that the proposed scheme can efficiently discover the congested routes in different directions of the roads.
High-sided road vehicles are susceptible to a sharp-edged crosswind gust, which may cause vehicle accidents such as overturning, excessive sideslip, or exaggerated rotation. This paper thus investigates the dynamic behaviour and possible accidents of high-sided road vehicles entering a sharp-edged crosswind gust with road surface roughness and vehicle suspension included. The high-sided road vehicle is modelled as a combination of several rigid bodies connected by a series of springs and dampers in both vertical and lateral directions. The random roughness of road surface is generated from power spectral density functions for various road conditions. The empirical formulae derived from wind tunnel test results are employed to determine aerodynamic forces and moments acting on the vehicle. After the governing equations of motion are established, an extensive computation work is performed to examine the effects of road surface roughness and vehicle suspension on the dynamic behaviour and vehicle accidents. It is demonstrated that for the high-sided road vehicle and wind forces specified in the computation, the accident vehicle speed of the road vehicle running on the road of average condition is relatively smaller than that running on the road of very good condition for a given crosswind gust. The vehicle suspension system should be taken into consideration, and the accident vehicle speed becomes smaller if the vehicle suspension system has softer springs and lighter dampers.
Journal of the Korean Society of Environmental Restoration Technology
/
v.1
no.1
/
pp.18-27
/
1998
To investigate the restoration progression on soil physical properties and vegetation at the surface of logging road affected by timber harvesting operation. This study was carried out at logging roads constructed from 1989 to 1994 in Mt. Baekwoon, Kwangyang, Chollanam-do. Judging from the analysis of soil hardness, there were significant changes in the depth of soil between 5 and 10cm. Soil hardness was recovered from the compacted condition to the natural forest condition after 9 years passed. Soil macroporous ratio (pF2.7) of topsoil was higher than that of deep soil. Soil moisture retention of topsoil was more improved than that of deep soil. From the view of soil bulk density, the necessary time for recovering to the undisturbed condition of forest soil was about 10 years in the logging road left. Soil physical properties such as soil bulk density and porous ratio were recovered as time passed. Improved soil physical properties promoted the plant recovery on the logging road surface. The dominant species on the logging roads were Comus kousa, Prunus sargentii as overstory species, Rubus crataegifolius, Lespedeza bicolor as understory species, and Saussurea gracilis, Pteridium aquilinum var. latiusculum as herbaceous species. The plant recovery of bank-slopes was faster than that of cut-slopes and road surface. In progress of year, average plant coverage were 70 to 90% in cut- and bank-slopes and 30 to 60% on the logging road, surface which was elapsed 9 years after logging road construction. Therefore, additional planting and seeding work could be effective to the soil condition and vegetation restoration.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.4
/
pp.571-577
/
2018
A gyratory compactor was developed to reflect the field compaction roller, which is commonly used in road construction. Unlike the compaction of the proctor using a conventional impact load, the gyratory compactor simulated the field roller compaction characteristics using the compressive force by the roller weight and the shear force through the rotation of a roller. The purpose of this study was to evaluate the shear stress and density change characteristics during compaction, which are difficult to obtain in the existing compaction process of the proctor, and to utilize it as a basic data for road design. The compaction characteristics of sand and subgrade soils were also analyzed and evaluated using the gyratory compactor. The compaction characteristics obtained using the gyratory compaction are basically the number of gyrations, height of the specimen, compaction density, void ratio, degree of saturation, and shear stress. As the number of gyrations increased, the height of the specimen decreased, the compaction density increased, the void ratio decreased, the degree of saturation increased, and the shear stress tended to increase. The shear stress of the compacted specimens started at 200 kPa in the initial stage of compaction and increased to approximately 330 to 350 kPa at 50 gyrations. The compaction density, degree of saturation and shear stress tended to increase with increasing water content in the same specimens. Compaction using turning compaction has the advantage of measuring the physical properties required for road design, such as density and shear stress, so that more engineering road design will be possible if it is reflected in road design.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2013.10a
/
pp.424-429
/
2013
The trolley carrying the pod moves along by the airfield runway. The pod through the trolley are subjected to vibration arising from the ground state, the precision optical components in the pod can have a significant impact. The road tests were conducted by using the measurement pod to remove the risk for the project. The measurement pod was composed with the ACRA, sensors, battery. The accelerometers were attached to get the acceleration through the road condition. The PSD envelop was calculated by FFT from the acceleration. The driving safety was proven through comparing the measurement data and MIL-STD-810G specification.
The objective of the study was to provide the useful scientific data on the early rehabilitation of the legging road after timber harvesting in the forest area. This study was carried out at logging roads which were constructed during 1989 and 1994 in Mt. Baekwoon. The field survey was conducted in July, 1991. Judging from the analysis of soil bulk density, time required for recovery as the undisturbed forest soil condition was more than 10 years in the road which was left, and the regression equation is as follows, $$Y_1=1.4195-0.0744{\cdot}X(R^2=0.91)$$$$Y_2=1.4673-0.0688{\cdot}X(R^2=0.73)$$ (X : elapsed year after road construction. $Y_1$, $Y_2$ : soil bulk density($g/cm^3$) at 0~7.5cm, and 7.5~15.0cm, respectively) Especially soil bulk density with buffer strip-woods was $0.890-0.903g/cm^3$, so it was 20% lower than that of logging road surface without buffer strip-woods. Among the 7 factors, location, sand content, and soil hardness had statistically significant effect on the soil bulk density in logging road surface. The pioneer species on logging road surface were Rhus cratargifolius, Prunus chinensis, and Lespedeza cyrtobotrya, etc. in woody species, and Pteridium aquilinum, Arundinella hirta, and Lysimachia clethroides, etc. in herb species. So, in process of year, average plant coverage were 70% on cutting and banking slope and 20% on logging road surface which elapsed 6 years after logging road construction. Through this research, buffer strip-woods must be remained for environmental conservation of forest conditions, and from the time to be closed the road, planting, seeding, and grazing works could be effective to the soil condition and vegetation recovery.
Journal of the Korean Institute of Landscape Architecture
/
v.35
no.6
/
pp.37-47
/
2008
Recently, reckless exploitation of land resources without much consideration for the environmental value of the land has been witnessed to accommodate the ever-increasing demands for regional development. Fragmentation due to land development is a major reason for the declining biodiversity in forest ecosystems. The purposes of this study were (1) to investigate the relationship between the factors of land development and forest fragmentation in 13 watersheds of a metropolitan area and (2) to suggest a forest management plan through the relationship. We carried out a factor analysis to determine explanatory axes of forest fragmentation, and then conducted a correlation analysis between the factor scores and the factor of land development, such as the rate of built-up areas, road density, number of built-up patches, and area of housing developments. The first explanatory axis represented stability of landscape highly related with the rate of the built-up area and road density. The second axis represented the level of fragment highly related with a number of built-up patches. Forest fragmentation patterns of the 13 watersheds were classified for the similarity in forest fragmentation. This study presents the forest management plans including distribution and level of land development and forest conservation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.