• Title/Summary/Keyword: Road Station

Search Result 183, Processing Time 0.028 seconds

Level of Service Evaluation of Pedestrian Road Using Micro-Simulation (미시적 교통 시뮬레이션을 활용한 보행자도로 서비스 수준 평가)

  • Park, Soon Yong;Cho, Hyerim;Cho, Ga Young;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.6
    • /
    • pp.26-36
    • /
    • 2020
  • The use of existing macroscopic research of pedestrian behavior on the walking link as data is limited in determining an individual pedestrian's moving route and the level of service. In macroscopic studies, it is difficult to make quantitative indices, such as pedestrian flow rate, occupied space, density, and speed for determining the level of service on pedestrian roads. Therefore, the microscopic pedestrian route is required to establish appropriate pedestrian policies. In this study, the Yeok-Sam subway station network was examined using a micro-simulation VISSIM, which was then calibrated and validated statistically. The Pedestrian Road's Level of Service of Yeok-Sam subway station area was evaluated using the pedestrian speed as the evaluating index on the Korean highway capacity handbook.

Fabrication and Application of BIS Base Station Antenna in Jeon-Ju City (전주시 BIS 기지국용 안테나 제작 및 활용)

  • Ko JinHyun;Park JooMoon;Ha Jaekwon;Park DukKyu
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.3 no.2 s.5
    • /
    • pp.95-104
    • /
    • 2004
  • This paper describes the design, fabrication, and measurement of a omni-directional beam pattern antenna for base station of the BIS which is one of the ITS services. The antenna is installed on the signal lamp of important crossroad and provides the wireless communication link between vehicles and RSE(Road Side Equipment). The required characteristics of BIS base station antenna are omni-directional beam pattern and specific beam pattern by the road and install environment and installed place of OBU. To get omni-directional beam pattern of antenna, Array configuration and OMA are applied. The measured results of fabricated antenna are as follows; return loss of 640MHz by -10 dB, and a gain of 10.3dBi. It is found that the measured beam patterns are similar to design results.

  • PDF

Consequences of land use change on bird distribution at Sakaerat Environmental Research Station

  • Trisurat, Yongyut;Duengkae, Prateep
    • Journal of Ecology and Environment
    • /
    • v.34 no.2
    • /
    • pp.203-214
    • /
    • 2011
  • The objectives of this research were to predict land-use/land-cover change at the Sakaerat Environmental Research Station (SERS) and to analyze its consequences on the distribution for Black-crested Bulbul (Pycnonotus melanicterus), which is a popular species for bird-watching activity. The Dyna-CLUE model was used to determine land-use allocation between 2008 and 2020 under two scenarios. Trend scenario was a continuation of recent land-use change (2002-2008), while the integrated land-use management scenario aimed to protect 45% of study area under intact forest, rehabilitated forest and reforestation for renewable energy. The maximum entropy model (Maxent), Geographic Information System (GIS) and FRAGSTATS package were used to predict bird occurrence and assess landscape fragmentation indices, respectively. The results revealed that parts of secondary growth, agriculture areas and dry dipterocarp forest close to road networks would be converted to other land use classes, especially eucalyptus plantation. Distance to dry evergreen forest, distance to secondary growth and distance to road were important factors for Black-crested Bulbul distribution because this species prefers to inhabit ecotones between dense forest and open woodland. The predicted for occurrence of Black-crested Bulbul in 2008 covers an area of 3,802 ha and relatively reduces to 3,342 ha in 2020 for trend scenario and to 3,627 ha for integrated-land use management scenario. However, intact habitats would be severely fragmented, which can be noticed by total habitat area, largest patch index and total core area indices, especially under the trend scenario. These consequences are likely to diminish the recreation and education values of the SERS to the public.

Analytical Evaluation of Airborne Noise for the Building Structure' on Railway Transportation Systems (철도부지 상부 입체 건축물의 공기전달음 소음 예측)

  • Yeon, Jun-Oh;Kim, Kyoung-Woo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1096-1102
    • /
    • 2013
  • The useful practical land shall be reserved when an artificial land covers the railway and road. However, the problem is that since the artificial land places directly on the top of noise sources likely on the railway and road there will arise the weak points, noise and vibration. On this study based on creating the artificial land on the top of a railway vehicle base and placing a tenement on that land, it was comprehended the noise influence from the railway car through the simulation. In order to secure the input value for the simulation, at first measured the noise condition of the railway station building and the railway vehicle base. The output value for the railway station building (place A) was around (53.6~57.6) dB(A), the equivalent continuous sound level for an hour, and for the railway station building (place B) it was around (63.7~68.9) dB. The maximum outdoor noise of the tenement on the artificial land was measured as 64.1 dB(A) under the fixed condition on the simulation modeling. The built purpose of placing the artificial land to prevent the noise influence from the railway met the expectation to be less influenced on the tenement. Rather, because of placing the artificial land the noise level on the lower space could be increased so there requires having a noise control.

A Study on Spatial Changes and the Main Agent of Space Creation in Samrye Area during the Japanese Occupation Period - Focusing on Samnye-ri and Hujeong-ri - (일제강점기 삼례지역 공간변화와 조성 주체에 관한 연구 - 삼례리, 후정리를 중심으로 -)

  • Kim, Dong-Yeol
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.4
    • /
    • pp.17-24
    • /
    • 2022
  • This study aims to identify the Spatial Changes and the main agent of space creation in Samrye Area during the Japanese Occupation Period. As for the urban space in the Samrye area, the urban space was expanded to the Hujeong-ri area from the construction of the Jeonbuk light railway. Before 1914, the urban space of Samrye was formed around Samrye Station in Samrye-ri, which oversees Samrye-do from the Goryeo Dynasty to the Joseon Dynasty, but when Samrye Station of Jeonbuk light railway was established in Hujeong-ri in 1914, the foundation of a ladder-type street network visible from the central space of the current Samrye area was formed until the 1930s. And it was the Japanese and Korean landowners who took the lead in the construction of the Jeonbuk light railway, not the government, who expanded the urban space of Samnye from Samrye-ri to Hujeong-ri. The background of the establishment of Jeonbuk light railway is the reason why Dongsan Farm has difficulty in transporting rice to the Honam Line during the rice harvest. At that time, Park Ki-soon, famous as the land king, took charge of the established chairman of the railroad installation and established it, and with the establishment of Samrye Station, the access road was connected to his farm. In addition, a new road was built on the farm land that owned the Hujeong-ri area to the Seoul-Mokpo Interroad in Samrye-ri, thereby expanding the urban space. In other words, unlike Gunsan and Iksan, which were built under the leadership of the Japanese colonial eran government, the urban space in Samrye area was expanded by a farmer who grew up as a large landowner based on agriculture, which was the economic base at the time.

Performance test of scale-up $20Nm^3/hr$ scale hydrogen generator for hydrogen station (수소스테이션용 $20Nm^3/hr$급 수소제조장치 스케일-업 및 성능시험)

  • Oh, Young-Sang;Baek, Young-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.37-42
    • /
    • 2006
  • In this study, $20Nm^3/hr$ scale compact hydrogen generator which can be apply to the hydrogen station was tested for hydrogen station application. $20Nm^3/hr$ scale compact hydrogen generator was developed by upgrading concept of stacking plate reactor from former $20Nm^3/hr$ scale plate hydrogen generator. concepts for improving system efficiency and performance include such as idea of heat recovery from the exhaust, exhaust duct which is especially design for plate type reactor reinforcement of insulation, enlargement of heat exchange area of reactor, introduction of desulphurizer reactor and PROX rector in a compact design, introduction of back fire protection structure of plate burner and so on, We can learn that final prototype of scale-up $20Nm^3/hr$ scale compact hydrogen generator can be operated steadily in 100% road at which over 94% of methane conversion(S/C=3.75) was obtained. In case of making up the weak point, we expect that it is possible to apply to hydrogen station by way of showing an example.

  • PDF

Application Method of GIS for Planning of Forest Road Network (임도망의 계획에 있어서 GIS 활용방안)

  • Jeon, Kwon-Seok;Ma, Ho-Seop
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.99-106
    • /
    • 2002
  • The application method of GIS for planning of forest road network can be save the efforts and cost by frequently change of forest road and evaluation the forest road route before construction. The purpose of this study is to suggest the proper method for planning an optimal forest road network in mountains forest using geographic information system(GIS) in the national forest of Mt. Kumsan at Namhae-gun, Gyungsangnam-do. In the forest road network planning by the minimum longitudinal gradient, The total length was 20.41km, and road density was 6.92m/ha. In the forest road network planning by mixed with the minimum longitudinal gradient and the maximization of investment effect, The total length was 21.15km, and road density was higher than that of the minimum longitudinal gradient as 7.17m/ha. The road length overlapped by cost path was more short than 3.52m/ha of the minimum longitudinal gradient as 1.73km. So, it appeared that forest road has an high effectiveness in yarding function. Therefore, it considered that the geographic information system could provide an effective and resonable solutions for planning of optimal forest road network.

  • PDF

Design Route Analysis of Dangerous Road for Traffic Accident using GIS (GIS를 이용한 사고 위험도로의 설계노선 분석)

  • Lee, Kye-Dong;Jung, Sung-Heuk;Lee, Jae-Kee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.6
    • /
    • pp.591-598
    • /
    • 2008
  • Recently, the government has improvement projects of dangerous road for the site that has very high accident rate due to bad geometric structures of the road. Although, route selecting of the road is a basic and important process, but the process of route selecting must consider the technical, safety and environment factor together. Also, the technology for the 3-dimensional terrain model can be used as an important factor in planning and designing for selecting alternative route projects. In the course of experimenting with the 3-dimensional topography generated by the combination of the digital map and drawing of route, the technology as been developed to offer the multi-dimensional access to the potential construction sites from the nearby main roads. This 3-dimensional digital elevation model has made it possible to make various terrain analysis base on GIS, which provides real-time virtual access to the designated construction sites for development planning and construction projects. Therefore, this study presents a reasonable plan for route selecting from some alternative routes through subjective evaluation and classify the methods linked basic design of road construction.

A study on $NO_2$ and TSP levels of the Major Trunk Road in Asan-area (아산지역 도로변의 $NO_2$ 및 TSP 농도에 관한 연구)

  • 손부순;김현탁;차정훈
    • Journal of environmental and Sanitary engineering
    • /
    • v.14 no.2
    • /
    • pp.68-74
    • /
    • 1999
  • The atmospheric concentrations of Nitrogen Dioxide ($NO_2$) and Total Suspended Particulates (TSP) at the traffic road side were measured n Asan area, Choongchumg-namdo during May 1998 and January, 1999.The results of the study are as follows;1. The aversge value of airbone $NO_2$ and TSP levels were 28.5ppb and 5.9mg/me in Asan area. 2. The concentration distribution of NO2 and TSP is high for the season of winter. On a daily pattern, somewhat high value is appeared in the afternoon. 3. For the station, terminal, and Shinchang, the average value of $NO_2$ is 33.6ppb, 27.9ppb and 24.1ppb in sequence, and the ones of TSP is 6.3mg/m3, 6.0mg/m3 and 5.3mg/m3 in order.4. The high levels of $NO_2$ and TSP were positively related to traffic volume.

  • PDF

Stabilization Method by Timber Pile for Fill Slope Failure on Forest Road (임도(林道) 성토사면(盛土斜面)의 소경재(小經材) 붕괴억지공법(崩壞抑止工法)에 관한 연구(硏究))

  • Ji, Byoung Yun;Jung, Do Hyun;Kim, Jong Yoon;Cha, Du Song
    • Journal of Forest and Environmental Science
    • /
    • v.17 no.1
    • /
    • pp.104-115
    • /
    • 2001
  • This study was carried out to to execute the slope stabilization scheme of soil and weathered rock slope with forest road generating slope failure due to heavy rainfall. The timber piled stabilization by Shin's formulae for landslide-restraint pile as elastically supported elastic columns under distributed loads was applied on the unstable fill slope. The results obtained were summarized as follows: The timber piled stabilization was applied for unstable slopes such as the soil slope and weathered rock slope of metamorphic rock regions. The results indicated that pile interval of 0.5~1.0m was appropriate in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of soil slope, and Pile interval of 0.5~1.3m in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of weathered rock slope. Recommended pile length was around 4m for pile 1, 2 and 3, and nearly 3m for pile 4 and 5.

  • PDF