• 제목/요약/키워드: Road Section

검색결과 637건 처리시간 0.032초

고속도로 노면표시 감속유도시설 효과평가 (Effectiveness of the Peripheral Transverse Line as Speed-Reduction Treatment on Korean Expressway Ramps)

  • 이성관;이기영;김석출
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.85-92
    • /
    • 2012
  • PURPOSES : Since expressways in South Korea are toll roads, many trumpet type interchanges exist, resulting in the installation of loop ramps very frequently. While the travel speed of the main lane is designed to be 100-110 km/h, the structure of a loop ramp is different and is designed for a minimum speed of 40 km/h. In fact, most of the actual travel speeds measured on the ramp exceed the designated speed, which has been a major problem in traffic safety. In this research, a type of pavement marking speed-reduction treatment called the "Peripheral Transverse Line" is installed on expressway loop ramps in order to study the change of driving speeds after the installation. METHODS : To verify statistically the change, this speed-reduction treatment has been installed on the Chungju interchange and the Yeoju junction. The driving speeds before the installation were compared with driving speeds both one month and five monthsafter the installation. RESULTS : As a result, the reductions of the average driving speeds after the treatment were statistically significant. More specifically, the average driving speeds of the Chungju interchange were reduced by 7.1-7.7 % for its tangent road section, and the speeds decreased by 8.5-9.5 % for its curve section. Similarly, in the Yeoju junction, an average speed reduction of 2.9-4.8 % for its tangent section was measured, along with 3.9% long-term speed reduction for its curve section. CONCLUSIONS : Since the pavement marking speed-reduction treatment has been partially proven to be effective from this research, we expect to expand this treatment and re-confirm the effect from a long-term perspective in the future.

고가 구조물 건설에 따른 일조권 분석 (Analysis of the right to sunshine for elevated structure construction)

  • 강기수;김상석;양승태;강인준
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

강원산간지방 도로확장 대절토부 사면 안정 처리에 관한 연구

  • 이승호;황영철;송요원;정응환;지영환;노흥제
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.529-536
    • /
    • 2003
  • In domestic case occurrence of cut slopes according to construction and expansion of road is necessary more than 70% of country has been consisted of mountain area. In the case of Kang-won Do, there are much mountains locals in road wiping away a disgrace and expanded and slant is connoting collapse danger of incision side by each kind calamity being urgent. When route alteration enforces disadvantageous road extension, stability examination and processing way about large slope happened are serious. During road extension work in the Kang-won DO secure stability for falling rock of road slope and failure that happen and established suitable reinforcement and countermeasure in reply in necessity. The Slope is divided rock slope and soil slope, and then in order to analysis soil slope apply LEM theory. And rock slope examined stability about stereographic projection and wedge failure. Is going to utilize in reinforcement and failure prevention if it is efficient cutting as reinterpreting stability and secure stability and wish to consider effective and robust processing plan of great principle earth and sand side, and present countermeasure inside with these data hereafter applying suitable reinforcement countermeasure about unstable section.

  • PDF

교통사고심각도 영향요인 분석에 관한 연구 - 곡선부가 포함된 국도를 중심으로 - (Analysis on Factors Affecting Traffic Accident Severity - Case Study : Arterial Included Curve Section -)

  • 박재홍;윤덕근;성정곤
    • 한국안전학회지
    • /
    • 제28권6호
    • /
    • pp.84-89
    • /
    • 2013
  • The main causes of traffic accidents can be classified by 3 factors - human error, vehicle deficiency and road environmental problem and most accidents occurs not only 1 factor but combination of 2 or 3-factors. Among these factors, road environmental factor is the most important factor due to influence the behavior of cars and road users and road environmental factor affects 30% of total accidents approximately. The 5 years traffic accidents data analyzed to verify the accidents severity on Korea National Highways. In order to analyze the severity, Ordered Probit Model was used. As a independent variables of this model the number of lane, neighbor road environments, sight distance, vertical grade, lane width, shoulder width and traffic volume were used and as a dependent variables the minor injuries, serious injuries and fatalities were used. Research results shows that sight distance and lane width are identified as significant factors for the traffic accident severity and lesser sight distance and lane width shows greater traffic accident severity.

간선도로 기능별 보행사고 심각도 분석과 모형 개발 (Pedestrian Accident Severity Analysis and Modeling by Arterial Road Function)

  • 백태헌;박민규;박병호
    • 한국도로학회논문집
    • /
    • 제16권4호
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES: The purposes are to analyze the pedestrian accident severity and to develop the accident models by arterial road function. METHODS: To analyze the accident, count data and ordered logit models are utilized in this study. In pursuing the above, this study uses pedestrian accident data from 2007 to 2011 in Cheongju. RESULTS : The main results are as follows. First, daytime, Tue.Wed.Thu., over-speeding, male pedestrian over 65 old are selected as the independent variables to increase pedestrian accident severity. Second, as the accident models of main and minor arterial roads, the negative binomial models are developed, which are analyzed to be statistically significant. Third, such the main variables related to pedestrian accidents as traffic and pedestrian volume, road width, number of exit/entry are adopted in the models. Finally, Such the policy guidelines as the installation of pedestrian fence, speed hump and crosswalks with pedestrian refuge area, designated pedestrian zone, and others are suggested for accident reduction. CONCLUSIONS: This study analyzed the pedestrian accident severity, and developed the negative binomial accident models. The results of this study expected to give some implications to the pedestrian safety improvement in Cheongju.

다기준의사결정기법과 수정 A-STAR 알고리즘을 이용한 목적지 최적경로 탐색 기법 개발 (Development of Destination Optimal Path Search Method Using Multi-Criteria Decision Making Method and Modified A-STAR Algorithm)

  • 최미형;서민호;우제승;홍순기
    • 한국산업융합학회 논문집
    • /
    • 제24권6_2호
    • /
    • pp.891-897
    • /
    • 2021
  • In this paper, we propose a destination optimal route algorithm for providing route finding service for the transportation handicapped by using the multi-criteria decision-making technique and the modified A-STAR optimal route search algorithm. This is a method to set the route to the destination centering on safety by replacing the distance cost of the existing A-STAR optimal route search algorithm with the safety cost calculated through AHP/TOPSIS analysis. To this end, 10 factors such as road damage, curb, and road hole were first classified as poor road factors that hinder road driving, and then pairwise comparison of AHP was analyzed and then defined as the weight of TOPSIS. Afterwards, the degree of driving safety was quantified for a certain road section in Busan through TOPSIS analysis, and the development of an optimal route search algorithm for the transportation handicapped that replaces the distance cost with safety in the finally modified A-STAR optimal route algorithm was completed.

China's Digital Silk Road in Southeast Asia and Vietnam's Responses from 2015 to 2021

  • Dao D. Nguyen
    • 수완나부미
    • /
    • 제15권2호
    • /
    • pp.57-90
    • /
    • 2023
  • China launched the Digital Silk Road (DSR) in 2015 as part of the existing Belt and Road Initiative (BRI) to expand its influence in digital and technological development across Asia, Europe, and Africa. Southeast Asia is one of the key targets of the Digital Silk Road due to its geographical proximity to China and the rapid growth of the digital sphere. Although the DSR opens several potential opportunities for the Association of Southeast Asian Nations (ASEAN) member states to foster the digitalization process in the region, how each country reacts to projects under the DSR is varied. Secondly, Vietnam is the only ASEAN member state that has not signed any official agreement under the BRI framework, and thirdly, Vietnam opted out of Huawei technology. This paper aims to understand the perspective of Vietnam and how Vietnam has responded to the growing technological presence of China in Southeast Asia until 2021. By using qualitative methods, the author argues that the DSR has allowed Beijing to overcome the limitations of the original strategy, BRI, and strengthen its influence in the field of information and communication technologies, particularly fifth-generation (5G) telecommunications. Furthermore, the paper examines Vietnam's digital development and digital diplomacy and how the Vietnamese government has responded to DSR projects. In light of both the potential threats and economic benefits that the DSR has brought to Vietnam and Southeast Asian countries, in the last section, the policy implications for cooperation are discussed.

다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구 (Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects)

  • 구본상
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.134-145
    • /
    • 2013
  • 국내에서 시행되는 대형 도로건설사업은 공구별로 분리 발주되고 개별 시공사는 단절된 형태로 시공을 하게 된다. 공구별 공종 및 활용 장비는 유사하나, 공구 간 장비의 공유는 비공식적이고 부분적으로만 일어난다. 이로 인해 도로 현장에서 사용되는 고가의 장비들은 낮은 가동률을 보이며 임대비용이 공사비의 높은 비중을 차지한다. 본 연구에서는 린 건설과 프로그램 매니지먼트의 이론에 근거하여 개별 공구에서 발생하는 유휴 및 부족 장비를 전체 사업 차원에서 공유함으로서 장비 생산성을 향상 시킬 수 있는 방안을 모색하였다. 개발된 장비공유시스템은 정의된 기준(최단거리, 연속성, 빈도 및 일대일) 및 일련의 절차에 따라 공구들의 장비 수급현황을 바탕으로 비용을 최소화하면서 가동률을 높여주는 조건하에 두 공구 간 장비의 매칭(matching)을 자동화해준다. 본 시스템을 실제 도로공사 현장 4개 공구에 3개월 간, 3개 장비를 대상으로 시뮬레이션을 실시한 결과, 다공구에서의 생산성을 측정하는 지표인 nDPR이 향상되었으며, 장비 비용 또한 4.45% 개선되었다. 더불어, 공유횟수가 많은 장비일수록 nDPR 및 비용이 비례적으로 개선되는 것을 관찰할 수 있어 장비의 공유를 통한 긍정적 효과를 입증하였다. 본 연구의 결과는 개별 사업이 아닌 전체사업 차원의 관리를 통해 증대되는 사업 가치를 정량적으로 제시함으로서 프로그램 차원의 사업관리모델을 조기 도입하는데 일조할 수 있을 것으로 사료된다.

공간 빅데이터를 활용한 지방도 포장보수 우선지역 예측 서비스 (Priority Area Prediction Service for Local Road Packaging Maintenance Using Spatial Big Data)

  • 이민영;최지우;김인영;손수진;최인호
    • 지능정보연구
    • /
    • 제29권3호
    • /
    • pp.79-101
    • /
    • 2023
  • 전라북도의 지방도 포장보수 이력 관리 현황은 현장 건설사의 포장보수 후 성과품에만 의존하여 엑셀, 한글 문서로만 관리되고 있는 실정이며, 덧씌우기 예산 등은 매년 불규칙적인 투입으로 안정적인 도로 관리 불가한 현황이다. 그에 따라 지방도의 체계적인 유지관리 방안 필요하다. 해당 논문에서는 도로 파손과 관련이 있는 데이터 및 도로 환경과 관련이 있는 데이터를 수집 및 가공하여, 도로 파손이 발생할 수 있는 위험지역을 도출하였다. 해당 예측 결과 지역을 현장검수하여 해당 방법론의 유효성을 파악하였다. 국토부에 따르면 일반국도의 도로 파임 발생 건수는 18년도에 약 4만7천건, 19년도에 약 3만8천 건이며 도로 파임 피해 소송건수는 18년도에 93건, 19년도에 119건으로 증가했다. 일반국도의 경우 도로 파임 발생 건수가 18년도에 비해 줄었으나 이는 도로 포장 보수 등을 진행하면서 발생 건수가 줄어든 것이라고 한다. 전라북도의 지방도의 포장보수 우선순위를 분석하기 위해 연구를 진행하기 위해, 엑셀, 한글 문서로만 관리되는 지방도 포트홀 상습발생지, 덧씌우기 사업구간, 긴급 보수구간위치와 같은 보수 이력데이터를 데이터화 하여, 분석하고, 보수 이력 데이터에서 벗어나 지방도의 체계적인 유지관리를 개선한다. 더 나아가, 도로와 관련된 다양한 현황데이터를 활용하여 공간 융합 데이터를 구축하고, 머신러닝 학습 데이터 및 예측에 필요한 데이터 형태로 가공하였다. 해당 공간 빅데이터를 사용하여 지방도 유지관리가 필요한 우선지역을 예측하고 도로포장 유지관리 우선순위 예측하였으며, 해당 결과를 활용하여 도로관리 예산 및 정책 수립에 활용하려 한다.

자동차 후류에 대한 3차원 유동의 PIV 측정 (PIV Measurements of Three-Dimensional Wake Around a Road Vehicle)

  • 김진석;김성초;성재용;김정수;최종욱
    • 한국가시화정보학회:학술대회논문집
    • /
    • 한국가시화정보학회 2004년도 추계학술대회 논문집
    • /
    • pp.1-4
    • /
    • 2004
  • The PIV measurements are performed to get the quantitative flow visualization around a road vehicle. The model scaled with 1/48 is located in the middle test section of the closed-loop water tunnel and the measuring system consists of CCD camera, diode laser, synchronizer, and computer. The experimental data are obtained at two Reynolds numbers of 50,000 and 100,000 based on the model length. The quasi-three-dimensional isovorticity surfaces, based on two-dimensional velocity field data, are generated. There is little difference between the results in part of the recirculation region and the vorticity contour according to the Reynolds number. Also a little bit complicated three dimensional flows are predicted behind the road vehicle.

  • PDF