• Title/Summary/Keyword: Road Environment Information

Search Result 476, Processing Time 0.033 seconds

Analysis of Road-to-Stream Linkage Characteristics in a Mountain Catchment using the Discriminant Analysis (판별분석을 이용한 산악지역 도로-하천 연결 특성 분석)

  • Park, Sang-Hyoung;Park, Changyeol;Yoo, Chulsang
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.147-158
    • /
    • 2011
  • This study analyzed the linkage characteristics between road runoff and the nearest streams in mountain regions using a discriminant analysis. The road-to-stream linkage is an important characteristic to evaluate whether the contaminant on road surface is transported directly into the nearby channel system. This study evaluated a total of 51 drainage outlets of mountain roads near the Soyanggang Dam. The linkage between road and stream, slope and width of road, and other information necessary for the discriminant analysis have been collected by in situ investigation and by analyzing the Digital Elevation Model. Finally, as independent variables in the discriminant analysis, the contributing road representing the road characteristics (similar to the runoff from the road drainage outlet) and the distance and slope of the connecting channel between road and nearest stream were selected. Among these three, the distance was found to have the highest discriminant power, the contributing road the lowest. Using the discriminant function derived, 40 out of 51 cases (78.4%) were correctly discriminated and the remaining 11 cases (21.6%) were wrongly discriminated. Reasons of wrongly discriminated cases were mainly due to change in drainage outlet direction, excessive runoff, change in road-to-stream path, etc. This result also indicates that the road-to-stream linkage can be introduced or prohibited by exactly the same way.

The Analysis of User's Degree on Landscape Satisfaction Factors for Pedestrian Road -Case Study of Bun-Dang New Town- (보행자 전용도로의 이용자 경관만족 요인분석 -분당 신도시를 중심으로-)

  • Kim, Dae-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.4 no.2
    • /
    • pp.1-10
    • /
    • 2001
  • The purpose of this study was to investigate factors and variables which have significant effects on landscape satisfaction of urban pedestrian road in Bun-dang new town and to suggest basic information for urban pedestrian road design. These works consist of two phase. First, we tested the Hye-Cheon college students' degree of landscape satisfaction for 37 spots of urban pedestrian road and then selected 10 sports slide by the Sturges' formula. Second, we analysed factors and variables on landscape satisfaction of urban pedestrian road using the semantic differential scale method and then processed using descriptive analysis, factor analysis and multiple linear regression analysis. The major findings of this study can be summarized as follows; 1) The difference of landscape adjectives between the highest score of landscape satisfaction slide and the lowest score landscape satisfaction slide were diversity of vegetation, plenty of the shade of a tree, naturalness and cleanness. 2) Diversity of vegetation, width of road, freedom of danger and diversity of environment can be significant variables of major effects on landscape satisfaction of urban pedestrian road by using the multiple linear regression analysis. 3) Factors covering the landscape satisfaction of urban pedestrian road have been found to be Environment of urban pedestrian road and Constitution of urban pedestrian road. By using the Varimaxs' rotation factor analysis for the number of factors' cumulative percentage has been obtained as 64%. 4) Environment of urban pedestrian road and Constitution of urban pedestrian road can be significant factors of major effects on landscape satisfaction of urban pedestrian road by using the multiple linear regression analysis. In conclusion, the landscape satisfaction factors and variables of urban pedestrian road need to be considered in plan or design the urban pedestrian road.

  • PDF

Prioritization of Potential Technology for Establishing a Safe Work Zone Environment (안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정)

  • Kim, Jin Guk;Yang, Choong Heon;Yun, Duk Geun
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

Application Methodology of Greenhouse Gases Emission Table for Various Types of Roads and Vehicles (도로기하구조 조건에 따른 차량별 온실가스 배출량 산정사례 적용연구 - 맑은 날씨를 기준으로 -)

  • Lee, Jonghak;Choi, Jaisung;Noh, Kwansub;Hu, Hyejung
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.23-31
    • /
    • 2016
  • PURPOSES : This study aimed to offer a greenhouse gases table to assist a road designer in calculating the greenhouse gases for a road environment when making a decision about an alternative road. METHODS : This study developed an operation mode table of greenhouse gases using the MOVES program. Similar factors for Korean vehicles and fuels are reflected in the MOVES program, which was made in the USA. Finally, a paired t-test was conducted to calculate the site data and MOVES data. Through these studies, a methodology was suggested for calculating carbon emissions based on various types of roads alignments. RESULTS : The site results for a passenger truck on the road were statistically significant when the vehicle speed was above 65 km/h. However, a future study will consider factors for various road alignments and vehicles. CONCLUSIONS : This study will contribute to the theoretical basis for reducing carbon emissions from roads by helping road designers make decisions about road alternatives in terms of the road environment.

A Study on the Verification of Traffic Flow and Traffic Accident Cognitive Function for Road Traffic Situation Cognitive System

  • Am-suk, Oh
    • Journal of information and communication convergence engineering
    • /
    • v.20 no.4
    • /
    • pp.273-279
    • /
    • 2022
  • Owing to the need to establish a cooperative-intelligent transport system (C-ITS) environment in the transportation sector locally and abroad, various research and development efforts such as high-tech road infrastructure, connection technology between road components, and traffic information systems are currently underway. However, the current central control center-oriented information collection and provision service structure and the insufficient road infrastructure limit the realization of the C-ITS, which requires a diversity of traffic information, real-time data, advanced traffic safety management, and transportation convenience services. In this study, a network construction method based on the existing received signal strength indicator (RSSI) selected as a comparison target, and the experimental target and the proposed intelligent edge network compared and analyzed. The result of the analysis showed that the data transmission rate in the intelligent edge network was 97.48%, the data transmission time was 215 ms, and the recovery time of network failure was 49,983 ms.

Robust Road Detection using Adaptive Seed based Watershed Segmentation (적응적 Seed를 기초로한 분수계 분할을 이용한 차도영역 검출)

  • Park, Han-dong;Oh, Jeong-su
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.687-690
    • /
    • 2015
  • Forward collision warning systems(FCWS) and lane change assist systems(LCAS) need regions of interest for detecting lanes and objects as road regions. Watershed segmentation is effective algorithm that classify the road. That algorithm is split results appear differently depending on Watershed line with local minimum in the early part of the seed. If not road regions or vehicles combined the road's seed, It segment road with the others. For compensate the that defect, It has to adaptive change by road environment. The method is that image segmentate the several of regions of interest. Then It is set in a straight line that is detected in regions of interest. If It was detected cars on seed, seed is adjusted the location. And If It wasn't include the line, seed is adjusted the length for final decision the seed. We can detect the road region using the final seed that selected according to the road environment.

  • PDF

Extracting Three-Dimensional Geometric Information of Roads from Integrated Multi-sensor Data using Ground Vehicle Borne System (지상 이동체 기반의 다중 센서 통합 데이터를 활용한 도로의 3차원 기하정보 추출에 관한 연구)

  • Kim, Moon-Gie;Sung, Jung-Gon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.3
    • /
    • pp.68-79
    • /
    • 2008
  • Ground vehicle borne system which is named RoSSAV(Road Safety Survey and Analysis Vehicle) developed in KICT(Korea Institute of Construction Technology) can collect road geometric data. This system therefore is able to evaluate the road safety and analyze road deficient sections using data collected along the roads. The purpose of this study is to extract road geometric data for 3D road modeling in dangerous road section and The system should be able to quickly provide more accurate data. Various sensors(circular laser scanner, GPS, INS, CCD camera and DMI) are installed in moving object and collect road environment data. Finally, We extract 3d road geometry(center, boundary), road facility and slope using integrated multi-sensor data.

  • PDF

Cognitive Model-based Evaluation of Traffic Simulation Model (교통 시뮬레이션 모텔의 인지공학적 평가에 관한 연구)

  • 강명호;차우창
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2002.05a
    • /
    • pp.163-168
    • /
    • 2002
  • The road sign in dynamic traffic system is an important element which affects on human cognitive performance on driving. Web-based vision system simulator was developed to examine the cognition time of the road sign in dynamic environment. This experiment was designed in within-subject design with two factors; vehicle speed and the amount of information of the traffic sign. It measured the cognition time of the road sign through two evaluation methods; the subjective test with vision system simulator and computational cognitive model. In these two evaluations of human cognitive performance under the dynamic traffic environment, it demonstrated that subject's cognition time was affected by both the amount of information of traffic sign and driving speed.

  • PDF

Soil displacement from frost heave on forest road cut-slopes

  • Lee, Myeong-Kyo;Lee, Joon-Woo;Choi, Sungmin;Kim, Hyoun-Sook
    • Korean Journal of Agricultural Science
    • /
    • v.45 no.2
    • /
    • pp.177-184
    • /
    • 2018
  • The frost heave process from repeated freezing and thawing actions in winter on forest road cut-slopes is important for forest road maintenance and management. This study investigated the damages of the forest heave process on forest road cut-slopes by measuring the changes in the road-cut surface elevation and sediment production and by conducting vegetation surveys which were aimed at providing information for forest road maintenance plans. The temperature and humidity differences were determined between the north and south cut-slopes. T-test showed that the north slope had a lower temperature and humidity than that of the south slope. Field observations also confirmed frozen soils on the north slopes, indicating that the north slopes are susceptible to frost heave. Sediment was converted to dry weight per unit area ($g/m^2$). T-test showed that the north slope produced more sediment than that of the south slope. The study confirmed that more frost heave occurred on the north cut-slopes than on the south cut-slopes. Vegetation surveys were conducted on five cut-slope plots. Considering the dominant species found above the cut-slopes, vegetations in all the plots are expected to succeed to pine and oak in the future. The dominant species appearing on the cut-slopes of the study area were exotic species because the elapsed time of the site was only 2 - 4 years.

The Construction of Bridges Management System Using GSIS (GSIS를 이용한 교량관리체계(橋梁管理體系) 구축(構築))

  • Yang, In-Tae;Kim, Dong-moon;Shin, Kye-jong
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.43-50
    • /
    • 1998
  • According to complexity and high level of society, the rapid and accurate information for landuse, environment and traffic etc., is required, but the information management by a drawing and a map is confronted with a complicated and sudden change of facilities such as bridge; electricities, city gases and networks. This paper is aim to build a bridge management system of road with GSIS. It operated personal computer will bring easy computing management system of bridge on road. To build this system, presented bridge management system and domestic method for bridge management of road are investigated, and also apply to bridge management system using GSIS for site and character of bridges. And with that, position and character apply to bridge management system using GSIS.

  • PDF