• 제목/요약/키워드: Road Construction

검색결과 2,064건 처리시간 0.027초

Water Barrier Performance of Rubber Related Geosynthetics for Road Construction

  • Jeon, Han-Yong
    • 한국섬유공학회:학술대회논문집
    • /
    • 한국섬유공학회 2003년도 The Korea-Japan Joint Symposium
    • /
    • pp.21-22
    • /
    • 2003
  • 4 types rubber related geosynthetics were manufactured to examine the performance to for applications to the civil and geotechnical fields, especially to the road construction. Reinforcement and water barrier function of these geosynthetics were interpreted as the important properties. Fiber glass mat based and geogrid based geosynthetics showed the excellent mechanical properties as. Also elastomeric bitumen based geosynthetic showed the highest permittivity. From this, it i s thought that this geosynthetic is suitable for water barrier under specific load condition.

  • PDF

고가 구조물 건설에 따른 일조권 분석 (Analysis of the right to sunshine for elevated structure construction)

  • 강기수;김상석;양승태;강인준
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

무선조정 헬리곱터 사진측량시스템을 이용한 도로의 평면선형정보 추출 (Extraction of Horizontal Alignment Information using RC Helicopter Photogrammetric System)

  • 장호식;노태호
    • 한국지리정보학회지
    • /
    • 제8권4호
    • /
    • pp.44-51
    • /
    • 2005
  • 본 연구에서는 무선조정 헬리곱터 사진측량시스템을 이용하여 도로의 중심선 좌표 및 기타 도로시설물을 추출하는 새로운 방법을 제시하였다. 또한, 추출된 도로 중심선 측량에서 X방향은 -0.117m ~ 0.103m, Y축으로는 -0.014m ~ 0.009m 정도의 오차를 얻을 수 있었으며, 이는 기존의 도로 중심선 측량방법보다 나은 값으로 분석되었다. 향후, 이 시스템을 적용하여, 도로시설물의 유지관리뿐만 아니라 교통이 혼잡하고 접근하기 어려운 지역이나 소지역에서의 위치선정 및 선형설계에 필요한 DB을 구축할 수 있다고 판단된다.

  • PDF

도로로부터 거리가 다른 지역에서 번식기 조류군집의 차이 (Differences in Breeding Bird Communities Caused by Different Distance from the Road)

  • 허위행;임신재;이우신
    • The Korean Journal of Ecology
    • /
    • 제26권1호
    • /
    • pp.29-33
    • /
    • 2003
  • 도로의 건설로 인해 산림생태계의 단절이 발생한 백두대간의 진부령, 진고개, 삽당령, 백복령, 화방재, 이화령, 덕산재, 여원재 등 8개 국도 지역에서 번식기 조류군집을 대상으로 2002년 4월부터 6월까지의 기간동안 도로로부터 거리가 다른 지역별 번식기 조류군집의 특성을 파악하였다. 도로로부터 가까운 지역보다 먼지역에서 관찰된 종수와 개체수가 많았다. 또한 길드 구조의 분석 결과 도로의 인접지역이 도로로부터 멀리 떨어져 있는 지역보다 나무구멍 둥지자원과 수관층 먹이자원을 이용하는 조류의 종수와 개체수가 적었다. 이는 도로의 건설로 인해 조류의 서식지 환경이 변화하게 되고 그 결과 조류군집 구조에 영향을 주는 것으로 판단된다.

스마트 건설에서 디지털 측량정보의 활용 (Using Survey information of BIM-applied Project - Construction Industry Specialist Interview -)

  • 조재희;최영우;이지우;김환용
    • 한국BIM학회 논문집
    • /
    • 제10권3호
    • /
    • pp.33-42
    • /
    • 2020
  • Recently, in the smart construction field, it is possible to construct spatial information of 3D data base quickly and accurately using drones, LiDARs and ARs,. Most public ordering institutions are pushing for the efficiency of construction work through establishing and announcing road maps and guidelines for utilizing BIM for the entire life cycle of construction. However, in most policies, the impact of 3D data on the entire life cycle is limited by only partially constructing and utilizing 3D data or by being mentioned. In addition, many public institutions, construction companies and planning companies did not actively utilize survey information during the actual construction phase, despite the possibility of using 3D survey information. In order to confirm the utilization of survey information, a total of eight private construction companies were selected and interviewed by experts. The analysis shows that most of companies lack the performance of drone measurements or have a lack of awareness of advantages, and among them, construction companies are relatively active. Based on these opinions, this study examined the usability of surveying information and examined measures to expand the utilization of survey information in legal and institutional aspects, technology development aspects and industrial development.

Web-system development for the feasibility of national road

  • Park, T.;Shin, E.;Kang, T.;Park, W.;Lee, Y.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.698-699
    • /
    • 2015
  • For last three years, our research team have conducted the project named "Development of construction project management technology based on BIM/GIS platform. "We developed construction cost estimation system as well as 3D modeling engine at the first two year and established a web-system which could estimate the benefits of the project and further analyze the economic and financial feasibility of the project. This paper mainly focused on the functions and specifications of web-system. The system was composed of two modules: economic feasibility estimation module and financial feasibility estimation module. While the economic feasibility estimation module determines economic feasibility of the project based on traffic demand forecasting from the public's perspective, the financial feasibility estimation module determine financial viability of the project using toll fee of the road from private entity's perspective. Compared with traditional feasibility study, the proposed system provide users with better flexibility which can make users easily to validate the project upon the change of project environments. The system was also verified with an already accomplished project. The verification showed that proposed system could provide satisfactory accurate results with reduced time and resources.

  • PDF

사회경제적 특성과 도로망구조를 고려한 고속도로 교통량 예측 오차 보정모형 (A Model to Calibrate Expressway Traffic Forecasting Errors Considering Socioeconomic Characteristics and Road Network Structure)

  • 이용주;김영선;유정훈
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.93-101
    • /
    • 2013
  • PURPOSES : This study is to investigate the relationship of socioeconomic characteristics and road network structure with traffic growth patterns. The findings is to be used to tweak traffic forecast provided by traditional four step process using relevant socioeconomic and road network data. METHODS: Comprehensive statistical analysis is used to identify key explanatory variables using historical observations on traffic forecast, actual traffic counts and surrounding environments. Based on statistical results, a multiple regression model is developed to predict the effects of socioeconomic and road network attributes on traffic growth patterns. The validation of the proposed model is also performed using a different set of historical data. RESULTS : The statistical analysis results indicate that several socioeconomic characteristics and road network structure cleary affect the tendency of over- and under-estimation of road traffics. Among them, land use is a key factor which is revealed by a factor that traffic forecast for urban road tends to be under-estimated while rural road traffic prediction is generally over-estimated. The model application suggests that tweaking the traffic forecast using the proposed model can reduce the discrepancies between the predicted and actual traffic counts from 30.4% to 21.9%. CONCLUSIONS : Prediction of road traffic growth patterns based on surrounding socioeconomic and road network attributes can help develop the optimal strategy of road construction plan by enhancing reliability of traffic forecast as well as tendency of traffic growth.

대구광역시 팔현리 지역 도로공사가 백로류 번식지에 미치는 영향 (The Effects of the Breeding site of the Egrets and Herons by Road Construction, Palhyun-ri, Daegu, Korea)

  • 차재석;김재웅;박희천
    • 한국환경생태학회지
    • /
    • 제22권2호
    • /
    • pp.152-158
    • /
    • 2008
  • 이 연구는 2003년부터 2006년까지 4년간 대구시 수성구 팔현리 백로류 집단번식지 인근의 도로공사가 백로류 번식에 미치는 영향을 분석하였다. 2003년부터 2005년까지 3년간 공사가 진행되면서 백로류 개체수는 감소하였다. 공사가 중단된 2006년에는 황로를 제외한 왜가리와 중대백로의 개체수가 증가하였고, 왜가리는 다른 백로류에 비해 공사의 영향을 가장 많이 받은 것으로 나타났다. 중대백로, 쇠백로 및 해오라기의 개체수도 공사기간동안 감소하였다. 둥지목의 벌목과 번식지의 일부가 절개된 후 백로류의 둥지는 도로변에서 번식지의 안쪽으로 이동하는 경향이 나타났다. 조사기간 동안 번식지내 백로류의 분변으로 인한 고사목의 증가와 태풍으로 인한 도복으로 둥지목의 그루 수는 감소하였고, 둥지목 당 번식 둥지의 수는 늘어났다. 둥지목의 구성비율은 매년 소나무의 비율이 낮아지고, 아카시와 참나무의 비율이 증가하였다.

임도 준공도면의 수평위치 정확도 평가에 관한 연구 (Evaluation of Horizontal Position Accuracy in Forest Road Completion Drawing)

  • 김명준;권형근;최윤호;염인환;이준우
    • 농업과학연구
    • /
    • 제37권3호
    • /
    • pp.471-479
    • /
    • 2010
  • Forest roads of 16,424km have been constructed as infrastructure for efficient management of forest. The demand of forest road have been also increased steadily with SOC conception for forest management and wood production. But, accuracy verification by completion drawing of forest road needed aspects extration of geographic information to sound like forest road construction and completion drawing. However, verification for completion drawing has not ascertained. This study carried out the evaluation for position accuracy about constructed forest road in Chungcheongnam-do for evaluating horizontal position accuracy of completion drawing of forest road. In result, first of distance of completion drawing and real route designed completion drawing longer than the real route as Gongju 83m, Seosan 66m, Nonsan 27m and Dangjin 19m, respectively. Second, RMSE by point-correspondence was 11m~14.7m, buffering analysis appeared difference of 18~24m. Finally, index of shape was the similar completion and real route through 6.5~7.4 and data information of forest road corresponds to be perfect. For such reasons, the existing completion drawings have a problem that it cannot use graphic information for drawing digital map according to the regulation, and there is an urgent need for improvement to solve this problem in the process of design and construction.

MN/Road 시험포장 구간내의 공기량 측정 및 결과값 분석을 통한 RAP 및 저온 아스팔트(WMA) 혼합물의 특성 평가 (Performance Evaluation of RAP and WMA Mixtures Located in MN/Road Test Cells through Air Voids Analyses)

  • 문기훈;;정진훈
    • 한국도로학회논문집
    • /
    • 제16권4호
    • /
    • pp.63-74
    • /
    • 2014
  • PURPOSES: This research is to evaluate the mechanical performance of different types of Hot Mix Asphalt (HMA) pavement cells prepared for MN/Road field testing section through an extensive experimental analysis of air voids and simple statistical evaluation tools (i.e. hypothesis test). METHODS: An extensive experimental work was performed to measure air voids in 82 asphalt mixture cores (238 samples in total) obtained from nine different types of road cell located in MN/Road testing field. In order to numerically and quantitatively address the differences in air voids among the different test Cells built in MN/Road, a simple statistical test method (i.e. t-test) with 5% significance was used. RESULTS: Similar trends in air voids content were found among the mixtures including conventional HMA, Reclaimed Asphalt Pavement (RAP) and Warm Mix Asphalt (WMA) combined with taconite aggregate this provides support to the use of RAP and WMA technology in the constructions of asphalt pavement. However, in case of acid modified HMA mixtures, significant differences in air void content were observed between on the wheel path and between wheel path location, which implies negative performances in rutting and thermal cracking resistances. Conclusions : It can be concluded that use of RAP and WMA technology in the construction of conventional asphalt pavement and the use of PPA (Poly Phosphoric Acid) in combinations with SBS (Styrene Butadiene Styrene) in asphalt binder production provide satisfactory performance and, therefore, are highly recommended.