• 제목/요약/키워드: Riverbed changes

Search Result 60, Processing Time 0.024 seconds

Flow Characteristics and Riverbed Changes Simulation for the Upstream and Downstream Sections of Gongju Bridge (공주대교 상.하류구간에 대한 흐름특성과 하상변동 모의)

  • Shin, Kwang-Seob;Jeong, Sang-Man;Lee, Joo-Heon;Song, Pum
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.2
    • /
    • pp.119-127
    • /
    • 2008
  • The flow characteristics and the aspects of riverbed changes were analyzed for the upstream and downstream sections of Gongju Bridge. The upstream and downstream had complex topography, and the sections had the confluence of tributaries and several structures. In order to simulate the flow characteristics of the target sections, 1D HEC-RAS and 2D RMA2 were applied. As a result, the longitudinal water level of the target sections matched the results of simulated 1D and 2D samples. Also, 2D SED2D were applied to predict riverbed changes. As a result of the simulation, quantitative analysis was able to be performed for longitudinal riverbed changes from the sections of sudden change, bridges, the confluence of tributaries, and bends. Also, the distribution of riverbed changes on the main sections was in close relation to flow velocity. As a result of evaluating the sensitivity of SED2D, the concentration of suspended sediment, the thickness of sand beds, and the size of sand grains affected riverbed changes sensitively. These results will be used to apply the models of riverbed changes in the future.

Altitude Changes of Riverbedsin Naeseong River Before and After Yeongju Dam Construction (영주댐 건설 전후 내성천의 하상 고도 변화)

  • Lee, Gwang-Ryul
    • Journal of The Geomorphological Association of Korea
    • /
    • v.24 no.1
    • /
    • pp.13-24
    • /
    • 2017
  • This study analyzes altitude changes of riverbed at 6 bridges in the upper and lower reaches of Yeongju Dam in Naeseong River, from 2009 to 2016 just before and after the dam construction. For 5 years from November 2010 to December 2015 when the dam was under construction, approximately 0.091m of the riverbed altitude in average more than twice before the dam construction was lowered, because of the effects of riverbed excavation for riverside maintenance in the upper reaches and transport limitation of flow and sediment by the dam in the lower reaches. Between November 2009 and December 2016 when the dam was in pre-construction and post-construction stages, respectively, the most sites in this study in the upper and lower reaches showed lowering in the riverbed altitudes. On the other hand, the riverbed around Hoeryongpo closed to the river mouth seems to be influenced by channel changes in Nakdong River rather than by the dam construction.

Long-term Riverbed Change Simulation and Analisys in the River (하천의 장기 지형변화 고찰 및 하상변동 모의)

  • Hwang, Soo Deok;Choi, Seon Ho;Lee, Sang Jin;Jang, Chang Lae
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.1-6
    • /
    • 2013
  • Trying to estimate variations of the riverbed is basic and important for river management. When new dam constructed in upstream and a structure were planned, impact of the riverbed changes in downstream should be considered for stably maintained and sustained rivers in the future. In this study, long-term riverbed changes analyzed using aerial photographs in Naeseongcheon. Also applying one-dimensional numerical model, GSTARS analyzed the effects of bed deformation in critical points. Based on Changing Patterns of long-term riverbed, it is possible that after the dam was built, to explore how to manage Naeseongcheon.

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

A Riverbed Change Prediction by River-Crossing Structure -Focused on the Major River Reaches of the Multifunctional Administrative City- (하천 횡단구조물에 의한 하상변동 예측 - 행정중심복합도시 주요 하천구간을 중심으로 -)

  • Yeon, Kyu-Sung;Jeong, Sang-Man;Yun, Chan-Young;Lee, Joo-Heon;Shin, Kwang-Seob
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.1
    • /
    • pp.107-113
    • /
    • 2009
  • This study has been conducted for the long-term riverbed change prediction on Geum River and Miho Stream surrounding the planned Multifunctional Administrative City and the neighboring regions by the construction of a small dam. Based on the analysis of vertical riverbed changes of the cross-sectional data for the years 1988, 2002 and 2007, minimum bed elevation significantly decreased in both Geum River and Miho Stream in 2007 as compared to 1988. Compared to 2002, however, a slight elevation change was observed. To make a long-term prediction on riverbed changes by the construction of a small dam, a one dimensional HEC-RAS 4.0 model has been used. By the fixed bed model test, the water levels were calibrated. By using the cross-sectional data of 1988 and 2002, verification was conducted under a movable bed model. According to the prediction of riverbed changes for each scenario with varying height of small dam, minor impact is expected around Miho Stream while major impact is expected around Geum River by 2017, as the small dam height increases. If the small dam is 7m-high, for example, it's been simulated that 1.59m deposition would be expected around the upper stream of Miho Stream Confluence while 1.98m scour would be expected around the downstream of the small dam.

Temporal Adjustment of Channel Geometry and Spatial Changes in Riverbed Materials along the Downstream Channels of Large Dams in the Geum River basin (금강유역 대형댐 하류 하도지형 경년변화 및 하상재료 종적변이 연구)

  • Ock, Giyoung;Choi, Mikyoung;Park, Hyung-Geun
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.287-294
    • /
    • 2019
  • This study investigated longitudinal changes in riverbed materials properties and temporal alteration of river channel geomorphology in the Geum River basin, where two multipurpose dams(Yongdam Dam and Daecheong Dam) were built in upstream area. We carried out grain size distribution analyses and measured soil organic matter contents of riverbed materials taken at the upper and lower sites of the two large dams. We also estimated the channel width, bar area and vegetation encroachment using the oldest map and aerial photographs taken before and after the construction of the dams. The results can contribute to increasing understandings of dam induced habitat alteration in river ecosystem.

Numerical simulation of flood water level in a small mountain stream considering cross-section blocking and riverbed changes - A case study of Shingwangcheon stream in Pohang before and after Typhoon Hinnamnor flood (단면 폐색과 하상 변화를 고려한 산지 중소하천의 홍수위 수치모의 - 태풍 힌남노 전후의 포항 신광천을 사례로 -)

  • Lee, Chanjoo;Jang, Eun-kyung;Ahn, Sunggi;Kang, Woochul
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.12
    • /
    • pp.837-844
    • /
    • 2023
  • Small and medium-sized mountain rivers that flow through steep, confined valleys carry large amounts of coarse-grained sediment and woody debris during floods. It causes an increase in flood water level by aggrading the riverbed and the cross-section blockage due to driftwood accumulation during flooding. However, the existing flood level calculation in the river basic plan does not consider these changes. In this study, using the Typhoon Hinnamnor flood in September 2022 as an example, we performed numerical simulations using the HEC-RAS model, taking into account the blockage of a cross-section at the bridge and changes in riverbed elevation that occurred during floods, and analyzed the flood level to predict flood risk. This study's results show that flooding occurs if more than 30% of the cross-section is blocked. The rise of flood water levels corresponds to that of the riverbed due to sediment deposition. These results can be used as basic data to prevent and effectively manage flood damage and contribute to establishing flood defense measures that consider actual phenomena.

A Study on Development of Assessment Model for Spatio-Temporal Changes in River Bed Using Numerical Models (수치모형을 이용한 하상변동 시공간 평가 기법 개발 연구)

  • Kim, Chul-Moon;Lee, Jeong-Ju;Choi, Su-Won;Ahn, Won-Sik
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.975-990
    • /
    • 2011
  • In this study, to develop an assessment method for spatio-temporal riverbed changes, a 1-dimensional model (HEC-RAS) and a 2-dimensional model (CCHE2D) were built and applied. As for the analysis of a riverbed's long-term change in a real stream, three new assessment methods were developed, which are called the "Sediment section cumulative curve", "Sediment section moment", and "Sediment probability distribution function." These methods were used to assess the characteristics of riverbed changes using a consistent valuation standard and to understand changes in quantities intuitively. From the results of this study, sediment characteristics of cross sections can be detected effectively by applying the "Sediment section cumulative curve" method to determine whether there is any sedimentation or erosion in total emission. The amount of sedimentation or erosion occurring in the right or left banks, which divided by center column, could be presented as one criterion by applying the "Sediment section moment" method. This approach could be utilized as an indicator for sediment predictions. Spatio-temporal sediment variables can be presented quantitatively by determining the mean and uncertain boundaries through the "Sediment probability distribution function", and finally, the results can be illustrated for each cross section to provide intuitive recognition.

Analyses of Riverbed Changes and Physical Disturbance Evaluations by Weir Installation in a Reach (보의 설치에 따른 하상변동과 물리적 교란평가 분석)

  • Choi, Heung Sik;Lee, Woong Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1203-1213
    • /
    • 2014
  • The hydraulic characteristics and the patterns of riverbed change had been analysed by HEC-RAS simulation in a reach of Cheong-mi river with and without weir. The corresponding physical disturbance had been evaluated with the method suggested by K-water (2008). The occurrences of low physical disturbance score coincide with the corresponding high bed changes by weir installation. The effects of physical disturbance coincide with the patterns of riverbed change along river reach which shows riverbed change is the important factor to physical disturbance. In case of installation of additional weirs at up and down stream sections of no disturbance effect by the existing weir, no physical disturbances occur in certain sections with confirming the appearance of the similar disturbance scores between the simulation results of with and without additional weir installations. In case of installation of additional weirs at up and down stream sections of disturbance effect margins by the existing weir, physical disturbances occur at every section. In case of installation of additional weirs at up and down stream sections within disturbance effect by the existing weir, low physical disturbance scores are given at every section because of superposition of disturbance along river reach. The physical disturbance would be minimized such that the additional weir is installed with sufficient distances of no disturbance and bed change effects along river reach.

Analysis of Hydraulic Impacts due to Sudden Enlargement of Kyungpo-cheon River Channel (경포천 하도 급확대에 따른 수리학적 영향분석)

  • Choi, Jong-Ho;Jung, Tae-Jung;Jun, Kye-Won
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.2
    • /
    • pp.35-45
    • /
    • 2019
  • The enlargement and reduction of river channels can not only change the flow of water but also alter sedimentation patterns, thus hindering smooth flood conveyance. Accordingly, this study aims to analyze the effects of the sudden enlargement of river channels on changes in the riverbed and river flow. For this purpose, as part of the "Hometown River" Construction Project, this study examined the local river Kyungpo-cheon, which a section of the river channel was widened by at least two- to three-fold, using RMA-2 and SED-2D models to simulate the changes in flow characteristics and riverbed variation due to the widening of the channel. The results of the study indicated that widening the Kyungpo -cheon river channel secured its dimensional stability in comparison to before widening. however, due to a flood frequency of more than once per year, future maintenance and management will be costly and time-consuming.