• Title/Summary/Keyword: River water use

Search Result 798, Processing Time 0.028 seconds

A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road (제방겸용도로 건설에 따른 제방 안정성 해석에 관한 연구)

  • Kim, Sung-Nam;Lee, Young-Woo
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.109-118
    • /
    • 2008
  • This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.

  • PDF

Improving of land-cover map using IKONOS image data (IKONOS 영상자료를 이용한 토지피복도 개선)

  • 장동호;김만규
    • Spatial Information Research
    • /
    • v.11 no.2
    • /
    • pp.101-117
    • /
    • 2003
  • High resolution satellite image analysis has been recognized as an effective technique for monitoring local land-cover and atmospheric changes. In this study, a new high resolution map for land-cover was generated using both high-resolution IKONOS image and conventional land-use mapping. Fuzzy classification method was applied to classify land-cover, with minimum operator used as a tool for joint membership functions. In separateness analysis, the values were not great for all bands due to discrepancies in spectral reflectance by seasonal variation. The land-cover map generated in this study revealed that conifer forests and farm land in the ground and tidal flat and beach in the ocean were highly changeable. The kappa coefficient was 0.94% and the overall accuracy of classification was 95.0%, thus suggesting a overall high classification accuracy. Accuracy of classification in each class was generally over 90%, whereas low classification accuracy was obtained for classes of mixed forest, river and reservoir. This may be a result of the changes in classification, e.g. reclassification of paddy field as water area after water storage or mixed use of several classification class due to similar spectral patterns. Seasonal factors should be considered to achieve higher accuracy in classification class. In conclusion, firstly, IKONOS image are used to generated a new improved high resolution land-cover map. Secondly, IKONOS image could serve as useful complementary data for decision making when combined with GIS spatial data to produce land-use map.

  • PDF

Removal of Odorous Compounds Using Ozone and Hydrogen Peroxide (오존과 과산화수소를 이용한 이취미 물질 산화 제거)

  • Lee, Hwa-Ja;Son, Hee-Jong;Roh, Jae-Soon;Lee, Sang-Won;Ji, Ki-Won;Yu, Pyung-Jong;Kang, Lim-Seog
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.12
    • /
    • pp.1323-1330
    • /
    • 2006
  • In this study, five different odor causing compounds in the Nakdong river and rapid sand filtered waters were treated by oxidation from $O_3/H_2O_2$ process. In addition, the change in BDOC formation by the $O_3/H_2O_2$ process was also investigated for considering this advanced oxidation Process as a pre-treatment to the BAC treatment process. The experimental result showed that the removal efficiency of geosmin was higher with the use of 5 mg/L of $O_3$ and 0.2 mg/L of $H_2O_2$ than with the use of 20 mg/L of $O_3$ alone for the sand filtered water. And in general, the removal efficiency of geosmin in raw water was $12{\sim}27%$ lower than the one in sand filtered water. In sand filtered water. the removal efficiencies of geosmin and IPMP decreased when $H_2O_2/O_3$ ratio increases above the optimum ratio. The optimum ratio of $H_2O_2/O_3$ dose was $0.5{\sim}1.0$ for geosmin and $0.2{\sim}1.0$ for IPMP. However, the optimum ratio of $H_2O_2/O_3$ in raw water remove geosmin appealed to $1.0{\sim}3.0$. According to the experimental results for the removal of 5 different odor causing compounds under varied $O_3$ doses, the removal efficiency of IPMP was the highest with 60% and, in overall, $O_3/H_2O_2$ process showed higher removal efficiency than $O_3$ alone process. The BDOC formation by the $O_3/H_2O_2$ process increased from $0.1{\sim}0.25$ to $0.19{\sim}0.34$ comparing to $O_3$ process alone. Therefore, it is concluded that the advanced oxidation process with $O_3/H_2O_2$ can be used as a pretreatment to the BAC treatment process.

Outlook of Discharge for Daecheong and Yongdam Dam Watershed Using A1B Climate Change Scenario Based RCM and SWAT Model (A1B기후변화시나리오 기반 RCM과 SWAT모형을 이용한 대청댐 및 용담댐 유역 유출량 전망)

  • Park, Jin-Hyeog;Kwon, Hyun-Han;No, Sun-Hee
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.12
    • /
    • pp.929-940
    • /
    • 2011
  • In this study, the future expected discharges are analyzed for Daecheong and Yongdam Dam Watershed in Geum River watershed using A1B scenario based RCM with 27 km spatial resolutions from Korea Meteorological Agency and SWAT model. The direct use of GCM and RCM data for water resources impact assessment is practically hard because the spatial and temporal scales are different. In this study, the problems of spatial and temporal scales were settled by the spatial and temporal downscaling from watershed scale to weather station scale and from monthly to daily of RCM grid data. To generate the detailed hydrologic scenarios of the watershed scale, the multi-site non-stationary downscaling method was used to examine the fluctuations of rainfall events according to the future climate change with considerations of non-stationary. The similarity between simulation and observation results of inflows and discharges at the Yongdam Dam and Daecheong Dam was respectively 90.1% and 84.3% which shows a good agreement with observed data using SWAT model from 2001 to 2006. The analysis period of climate change was selected for 80 years from 2011 to 2090 and the discharges are increased 6% in periods of 2011~2030. The seasonal patterns of discharges will be different from the present precipitation patterns because the simulated discharge of summer was decreased and the discharge of fall was increased.

System Development for the Estimation of Pollutant Loads on Reservoir (저수지 유역의 오염부하 산정 시스템 개발)

  • Sim, Sun-Bo;Lee, Yo-Sang;Go, Deok-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.35-44
    • /
    • 1998
  • An integrated system of GIS and water quality model was suggested including the pollutant loads from the watershed. The developed system consists of two parts. First part is the GIS module. The geographic information system of the study area was built to provide the information on landuse and several surface factors concerning the overland flow processes of water and pollutants. Second part is the modeling modules which include storm event pollutant load model(SEPLM)., non-storm event pollutant load model(NSPLM), and river water quality simulation model(RWQSM). Models can calculate the pollutant load from the study area. The databases and models are linked through the interface modules resided in the overall system, which incorporate the graphical display modules and the operating scheme for the optimal use of the system. The developed system was applied to the Chungju multi-purpose reservoir to estimate the pollutant load during the four selected rainfall events between 1991 and 1993,. based upon monthly basis and seasonal basis in drought flow, low flow, normal flow and wet flow.

  • PDF

A Study on the Evaluation of Wide-scale Site Suitability for Water-friendly Recreation Area Planning (친수 휴양활동공간 계획을 위한 광역수준의 부지 적합성 평가)

  • Cho, Hyun-Ju;Ra, Jung-Hwa;Lee, Hyun-Taek;Ku, Ji-Na
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.1-13
    • /
    • 2009
  • The purpose of this study was to look into the feasibility of site suitability focused on the potential for environmentally- and water-friendly recreation area development in a wide area(Nakdong River 35km) and to study new methods for providing basic data in regard to the recreation planning over a wide area as well as in application to other sites. The results of this study are as follows. Through classification by mesh method, the site of this study was classified into 42 grids, and by means of the analysis of evaluation indicators, 20 indicators were established and sorted into 4 types of significant recreation activity. According to the results of the analysis for each recreation activity type, there were 8 essentials for water-friendly recreation activity types based on water use while water-friendly recreation types for static activity included 12 sub-essentials. As a result of the first evaluation(the minimum required evaluation) by each classified grid, 32 of the 42 total grids were implemented by the minimum requirements. These grids were usually distributed evenly through the whole site. In terms of the second evaluation(specific site evaluation) results, 6 grids were highly suitable for recreational nature experiences and landscape ecological learning, 4 grids for developing water-friendly recreation for exercise, 1 grid for building water-friendly recreation based on water use, and 4 grids for planning water-friendly recreation for static activity. The results of the grid evaluation of this study could be extended to contiguous grids or reduced. Actual planning for a water-friendly recreation area must change the grid shape or size through boundary adjustments.

Characteristics of Groundwater Quality in Sasang Industrial Area, Busan Metropolitan City (부산시 사상공단지역의 지하수 수질 특성)

  • Hamm, Se-Yeong;Kim, Kwang-Sung;Lee, Jeong-Hwan;Cheong, Jae-Yeol;Sung, Ig-Hwan;Jang, Seong
    • Economic and Environmental Geology
    • /
    • v.39 no.6 s.181
    • /
    • pp.753-770
    • /
    • 2006
  • In urban areas, groundwater pollution is heavily affected by urbanization with land use types. This study aims to characterize groundwater quality and contamination in Sasang industrial area of Busan Metropolitan City where metalworking, machinery and footwear factories are located. Busan Metropolitan City is the highest in the utilization of groundwater resources among the metropolitan cities in Korea. $K^+,\;Na^+,\;Ca^{2+},\;Mg^{2+},\;Cl^-,\;SO_4^{2-}\;and\;HCO_3^-$ concentrations, and electrical conductivity (EC), total dissolved solids (TDS) and salinity are high in the areas near the Nakdong River. The results are attributed to the influence of salt water which intruded into the coastal sediments during sedimentation. In addition, the dominant chemical type of Ca-Cl indicates the influence of salt water in the geological formations as well as anthropogenic pollution. $SiO_2$ ion is interpreted to originate from both water-silicate mineral reactions and the decomposition of cement concretes. Trichloroethylene (TCE) was detected at 12 sites of total 18 sites. However, tetrachloroethylene (PCE) was detected at f sites and 1.1.1-trichloroethane (TCA) at 3 sites. According to the factor analysis, factor 1 was explained by 49.8%, factor 2 19.8%, and factor 3 11.0% with total 80.6% explanation. pH, TDS, salinity, $Ca^{2+},\;K^+,\;Mg^{2+},\;Na^+,\;Al^{3+},\;As^{3+},\;Cl^-\;and\;Fe^{2+}$ were positively highly loaded to factor 1. The chemical components loaded to factor 1 represent the chemical characteristics of both industrial pollution and influence by salt water. Based on the cluster analysis and distribution pattern of chemical components, the concentration of $Na^+,\;Ca^{2+},\;Cl^-,\;SO_4^{2-}\;K^+,\;and\;Mg^{2+}$ is high in the riverside area of the Nakdong River composed of coastal sediments that is influenced by salt water. The downstream area of the Hakjang Stream is judged to be affected by both salt water and artificial pollution. The other part of the study area is interpreted by anthropogenic pollution.

Study on the Selecting of Suitable Sites for Integrated Riparian Eco-belts Connecting Dam Floodplains and Riparian Zone - Case Study of Daecheong Reservoir in Geum-river Basin - (댐 홍수터와 수변구역을 연계한 통합형 수변생태벨트 적지 선정방안 연구 - 금강 수계 대청호 사례 연구 -)

  • Bahn, Gwonsoo;Cho, Myeonghyeon;Kang, Jeonkyeong;Kim, Leehyung
    • Journal of Wetlands Research
    • /
    • v.23 no.4
    • /
    • pp.327-341
    • /
    • 2021
  • The riparian eco-belt is an efficient technique that can reduce non-point pollution sources in the basin and improve ecological connectivity and health. In Korea, a legal system for the construction and management of riparian eco-belts is in operation. However, it is currently excluded that rivers and floodplains in dam reservoir that are advantageous for buffer functions such as control of non-point pollutants and ecological habitats. Accordingly, this study presented and analyzed a plan to select a site for an integrated riparian ecol-belt that comprehensively evaluates the water quality and ecosystem characteristics of each dam floodplain and riparian zone for the Daecheong Dam basin in Geum River watershed. First, the Daecheong Dam basin was divided into 138 sub-basin with GIS, and the riparian zone adjacent to the dam floodplain was analyzed. Sixteen evaluation factors related to the ecosystem and water quality impact that affect the selection of integrated riparian eco-belt were decided, and weights for the importance of each factor were set through AHP analysis. The priority of site suitability was derived by conducting an integrated evaluation by applying weights to sub-basin by floodplains and riparian zone factors. In order to determine whether the sites derived through GIS site analysis are sutiable for actual implementation, five sites were inspected according to three factors: land use, pollution sources, and ecological connectivity. As a result, it was confirmed that all sites were appropriate to apply integrated riparian ecol-belt. It is judged that the riparian eco-belt site analysis technique proposed through this study can be applied as a useful tool when establishing an integrated riparian zone management policy in the future. However, it might be necessary to experiment various evaluation factors and weights for each item according to the characteristics and issues of each dam. Additional research need to be conducted on elaborated conservation and restoration strategies considering the Green-Blue Network aspect, evaluation of ecosystem services, and interconnection between related laws and policy and its improvements.

A Study on Designation Potential as Ramsar Site and Management Method of Massive Scale of Wetland - A Case of Jang Hang Estuary Wetland, Han River, Korea - (대규모 습지의 Ramsar Site 지정 가능성 검토 및 관리방안 연구 - 한강하류 장항습지를 대상으로 -)

  • Yeum, Jung-Hun;Han, Bong-Ho;Lee, Kyong-Jae
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.249-257
    • /
    • 2010
  • The purpose of this paper is to weigh the possibility of endangered Jang-hang wetland at the estuary of Han River to be included on the Ramsar List of Wetlands of International Importance and come up with ways to manage the wetland depending on its biotope patterns. The target area is located between Gimpo bridge and Isanpo I.C. with about $2.7km^2$ area. Through the analysis of RIS(Information Sheet for Ramsar Wetlands), it was known that the wetland is located on the sedimentary topography and formed as a result of sediment at the estuary of the river owing to the concentration of rainfall during summer. The vegetation environment in the area is divided into brackish water and fresh water areas depending on salinity. Rhizosphere soil(RS) of the area was analyzed to be Silt loam while bottom RS to be Sand loam. The plant ecology was composed of 52 families 135 species and 11 varieties and 146 types. Among indigenous species found are Salix koreensis, Phragmites communis and Miscanthus sacchariflorus. The analyzed results of the actual vegetation showed that willow community accounts for 37% of the area and rice field is 13.5%. As for animal ecology, total of 62 species and 25,977 individual wild birds were observed. After comparing and analyzing the RIS we compiled with the Ramsar Site designation standards, it turns out that the Jang-hang wetland meets criteria 1(biographic region), criteria 2,3 and 4(species and ecological communities) and criteria 5 and 6(water birds). Thus, Jang-hang wetland is eligible for the Ramsar site. As a result of establishing and evaluating the biotope types for setting management areas, Jang-hang wetland has a total of 13 different types, and the grade I represents 75.4% of the area while the grade III 0.8% of the land status. We categorized four management zones for the wetland depending on the biotope patterns - preservation, restoration, use and buffer zones and suggested management methods for each zone.

Parameters Estimation of Clark Model based on Width Function (폭 함수를 기반으로 한 Clark 모형의 매개변수 추정)

  • Park, Sang Hyun;Kim, Joo-Cheol;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.6
    • /
    • pp.597-611
    • /
    • 2013
  • This paper presents the methodology for construction of time-area curve via the width function and thereby rational estimation of time of concentration and storage coefficient of Clark model within the framework of method of moments. To this end time-area curve is built by rescaling the grid-based width function under the assumption of pure translation and then the analytical expressions for two parameters of Clark model are proposed in terms of method of moments. The methodology in this study based on the analytical expressions mentioned before is compared with both (1) the traditional optimization method of Clark model provided by HEC-1 in which the symmetric time-area curve is used and the difference between observed and simulated hydrographs is minimized (2) and the same optimization method but replacing time-area curve with rescaled width function in respect of peak discharge and time to peak of simulated direct runoff hydrographs and their efficiency coefficient relative to the observed ones. The following points are worth of emphasizing: (1) The optimization method by HEC-1 with rescaled width function among others results in the parameters well reflecting the observed runoff hydrograph with respect to peak discharge coordinates and coefficient of efficiency; (2) For the better application of Clark model it is recommended to use the time-area curve capable of accounting for irregular drainage structure of a river basin such as rescaled width function instead of symmetric time-area curve by HEC-1; (3) Moment-based methodology with rescaled width function developed in this study also gives rise to satisfactory simulation results in terms of peak discharge coordinates and coefficient of efficiency. Especially the mean velocities estimated from this method, characterizing the translation effect of time-area curve, are well consistent with the field surveying results for the points of interest in this study; (4) It is confirmed that the moment-based methodology could be an effective tool for quantitative assessment of translation and storage effects of natural river basin; (5) The runoff hydrographs simulated by the moment-based methodology tend to be more right skewed relative to the observed ones and have lower peaks. It is inferred that this is due to consideration of only one mean velocity in the parameter estimation. Further research is required to combine the hydrodynamic heterogeneity between hillslope and channel network into the construction of time-area curve.