It can be important framework data to monitor the change of land-use pattern of river boundary in design and management of river. This study analyzed the change of land-use pattern of Gab- and Yudeung River using time-series aerial images. To do this, we carried out radiation and geometric correction of image, and estimated land-use changes in inland and floodplain. As the analysis of inland, the ratio of residential, commercial, industrial, educational and public area, that is urbanized element, increases, but that of agricultural area shows a decline on the basis of 1990. Also, Minimum Distance Method, which is a kind of supervised classification method, is applied to extract water-body and sand bar layer in floodplain. As the analysis of land-use, the ratio of level-upped riverside land and water-body increases, but that of sand bar decreases. These time-series land use information can be important decision making data to evaluate the urbanization of river boundary, and especially it gives us goodness in river development project such as the composition of ecological habitat.
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.132-139
/
2010
The river technology of Japan was highly developed and achieved much result in flood protection, water use and the environment. Nowadays, the function which is requested to the river is changes because the society changes from growth to maturity. In this study, we suggest the functions of the river in the maturity society about future welfare, medical care and education based on field research of case study. In this research, we pay attention to the functions related with culture, one) function of healing, mental stress improvement and life, two) function of landscape, education and recreation. And this paper proposed the usage of the river where adopt to the times, a function and the value of "the river as the space". We made a questionnaire to 187 river managers, and 90% of answers wear positive for use the river as the medical aspect, health and the welfare. Furthermore, based on research result of hospitals and welfare facilities which used a river for their activities, we suggest to develop and use the river walk, to design a city and rivers as one, and to use many facilities which are located on river front more active, those are improve the new river functions.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.74-83
/
2007
The goal of this study is to establish an integrated watershed hydrologic model for the whole Nakdong River basin whose area is an approximately 24,000 km2. Including a number of watershed elements such as rainfall, runoff, water use, and so on, the proposed model is based on SWAT model, and is used to improve the flow duration curve estimation of ungauged watersheds for Korean Total Maximum Daily Load (TMDL). The model is also used to recognize quantitatively the river flow variation due to water use elements and large dam effluents in the whole watershed. The established combined watershed hydrologic model, SWAT-Nakdong, is used to evaluate the quantified influences of artificial water balance elements, such as a dam and water use in the watershed. We apply two water balance scenarios in this study: the dam scenario considering effluent conditions of 4 large multi-purpose dams, Andong dam, Imha dam, Namgang dam, and Habcheon dam, and the water use scenario considering a water use for stream line and the effluent from a treatment plant. The two scenarios are used to investigate the impacts on TMDL design flow and flow duration of particular locations in Nakdong River main stream. The results from this study will provide the basic guideline for the natural flow restoration in Nakdong River.
Proceedings of the Korea Water Resources Association Conference
/
2004.05b
/
pp.1238-1241
/
2004
Yongsan river 4th agricultural comprehensive development project is being developed in order to strengthen the competitiveness in the southwest sea-side district, to construct the area for the special product and so on. Different from other development project, this project is to use water from its watershed by means of using regulating reservoirs, small reservoirs and farm ponds. but the number or regulating reservoirs, small reservoirs and farm ponds involved in this project are 7, 147 and 13 respectively. So it is necessary to develope the irrigation water management system for the purpose of efficient water use in Yougsan river fourth district. In this study, the irrigation water management system was developed and by using this system. efficient water using plans could be established.
Lee, Youngkyeong;Choi, Ye Seul;Kim, Chanyong;Lim, up
Journal of the Korean Regional Science Association
/
v.37
no.1
/
pp.45-61
/
2021
This research purposes to design a methodological framework to suggest the optimal method to resolve the conflicts of stakeholders surrounding the water use charge of the Han River region, and to use the analysis results to provide the direction of policy. For this, it was preceded that the process of understanding the mechanisms of the multifaceted conflict between decision makers taking different positions over water use charge of the Han River region, and an optimal method to resolve the conflict of water use charge of the Han River region was derived by using a graph model for conflict resolution(GMCR). According to the analysis results, the optimal state to find a solution to the water use charge of the Han River is that the Seoul-Incheon-Gyeonggi region pays the charge according to the original rate while Seoul-Incheon requesting discount the water use rate. In addition, the Han River management committee should establish policies desired by Seoul-Incheon-Gyeonggi region including rationalization of the decision-making structure to determine the rate of water use charge, making the basis to support the Han River management fund system for the Seoul-Incheon region, and transparent management of the Han River management fund system considering the characteristics of beneficiary regions and residents. This study is expected to provide objective decision-making information in establishing environmental policy directions related to conflict resolution in the water use charge of the Han River region and to offer a methodological basis for similar follow-up studies related to conflicts derived from sharing nature environment.
Imnam Dam construction and inter-basin water transfer use by North Korea have caused several problems including water resources management aspects in the downstream reach of North Han River. Therefore, cooperative works between North and South Korea are required to make a reasonable management situation of the shared river for water quantity and quality. However, efforts by the North and the South has done not enough to achieve equitable water use in the shared river. This study analyzes main impacts caused by Imnam Dam in key sectors for reviewing water use right regarded as the most important decision-making criterion in international rivers. As the results, water deficit by Imnam Dam is calculated at 379 million $m^3$/year when river drought year for water assessment is set in 1978 in the Han River basin. Additionally hydropower production is decreased by 234 GWh/year in exclusive hydropower generation dams. In respective of water quality, BOD concentration is increased by 0.065 ppm at Sambongli in North Han River. Finally it is identified that unequitable water use based on the absolute territorial sovereignty by North Korea in North Han River has directly and indirectly affected severe impacts to South Korea as the downstream user.
Proceedings of the Korea Water Resources Association Conference
/
2004.05b
/
pp.204-208
/
2004
In the forthcoming 21C, the barometer of cultural lives depends on that the water demand will increase or not. On the opposite site of that, the small watersheds will influence directly on how to cover the surface of watersheds with land use, no planning developing watersheds, and the rearrangement of small rivers. Espacially as the exordinary climatic phenomena, water resources and water content of the small watersheds will be confused oil exactly not to make a plan of water resources. This study area has four small watersheds groups in Gangwon-Do Province, that is, group I five small river watersheds including Changchoncheon etc., group II fiver rivers watersheds including to Hwalsanmogicheon etc., group III five small river watersheds including Singicheon etc., group IV including to Sabulanggolcheon etc. According to the land use such as dry field(or farm), ice field, forest land, building lot arid others, in small watersheds, the amount of runoff will be impacted by precipitation. The comparison between the runoff was getting from Kajiyama Formular and calculated runoff from multi-linear regressed equations by land use percentage was performed. Its correlation which was estimated by coefficient of correlation will be accepted or not, as approched 1.00000 values. As the monthly water resources amount is estimated by multi-linear regressed equations, we make a plan to demand and supply the water quantity from small river watersheds during any return periods.
Shin, Hyoung Sub;Hong, Il;Kim, Ji-Sung;Kim, Kyu Ho
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.4
/
pp.2419-2427
/
2014
This paper defines the hydro-geomorphological river area to estimate the change of the river function before/after levee construction, and proposes the methodology that calculates the river area by using GIS. The boundary of river area is determined by the 100-year potential flood inundation area without the levee effect of the flood protection. Firstly, 1918' land-use map was digitized and the changes were analyzed by comparing with 2007' digitized map. The result shows that urban/farmland zone in Mankyung river area were increased by 0.4%/11.6% and bare ground was decreased by 10.0% so that the effective use of floodplain due to levee construction leaded to better productivity, but the decrease of the environment function of the river was predicted as result of the reduction of the river area.
Land-use change has an important role in the hydrologic characteristics of watersheds because it alters various hydrologic components such as interception, infiltration, and evapotranspiration. For example, rapid urbanization in a watershed reduces infiltration rates and increases peak flow which lead to changes in the hydrologic responses. In this study, a physical hydrologic model the soil and water assessment tool (SWAT) was used to assess long-term continuous daily streamflow corresponding to land-use changes that occurred in the Naesungchun river watershed. For a 30-year model simulation, 3 different land-use maps of the 1990s, 2000s, and 2010s were used to identify the impacts of the land-use changes. Using SWAT-CUP (calibration and uncertainty program), an automated parameter calibration tool, 23 parameters were selected, optimized and compared with the daily streamflow data observed at the upstream, midstream and downstream locations of the watershed. The statistical indexes used for the model calibration and validation show that the model performance is improved at the downstream location of the Naesungchun river. The simulated streamflow in the mainstream considering land-use change increases up to -2 - 30 cm compared with the results simulated with the single land-use map. However, the difference was not significant in the tributaries with or without the impact of land-use change.
Mikyoung Choi;Kwangya Lee;Bosung Koh;Sangyeon Yoo;Dongho Jo;Minchul La;Sangwoo Kim;Wonho Nam
Korean Journal of Agricultural Science
/
v.50
no.4
/
pp.903-916
/
2023
This study aims to establish basic data for efficient management of rural water by analyzing regional irrigation facilities and benefitted areas in the statistical yearbook of land and water development for agriculture at the watershed level. For 511 domestic rural water use areas, water storage facilities (reservoirs, pumping & drainage stations, intake weirs, infiltration galleries, and tube wells) are spatially distributed, and the benefitted areas provided at the city/county level are divided by water use area to provide agricultural water supply facilities. The characteristics of rural water district areas such as benefitted area, were analyzed by basin. The average area of Korea's 511 rural water districts is 19,638 ha. The average benefitted area by rural water district is 1,270 ha, with the Geum River basin at 2,220 ha and the Yeongsan River basin at 1,868 ha, which is larger than the overall average. The Han River basin at 807 ha, the Nakdong River basin at 1,121 ha, and the Seomjing River basin at 938 ha are smaller than the overall average. The results of this basic analysis are expected to be used to set the direction of various supply and demand management projects that take into account the rational and scientific use and distribution of rural water and the characteristics of water use areas by presenting a quantitative definition of Korea's agricultural water districts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.