• Title/Summary/Keyword: River Facility

Search Result 188, Processing Time 0.026 seconds

The Evaluation of Location Decision Factors of Environmental Foundation Facilities using Environmental Geographic Information System (환경지리정보시스템을 이용한 환경기초시설의 입지 결정요인 평가)

  • Cho, Deok-Ho;Bae, Min-Ki
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.1
    • /
    • pp.45-57
    • /
    • 2008
  • The purpose of this research is to select an appropriate location of water pollution prevention facilities(WPPF) through evaluating location decision factor using environmental geographic information system. To do that, this research reviewed the current location policies of WPPFs and its related researches. And this paper builds water pollutant statistical databases, integrated them with the geographic information system of the administrative areas where water pollutants are generated, and gears it with statistical programs such as correlation and regression analysis in order to figure out the pollution factors which influence on the location decision of WPPF on the real time base. The volume of discharge of industrial wastewater is one of the most important water pollutants on the location decision of WPPF. And the number of industrial facilities also was the most important location decision factor in constructing the WPPFs. In addition, this paper noted that the number of population in each area makes a role to restraint the construction of WPPF. It identified that the disposal facility in Nackdong river upper-middle watersheds was insufficient in treating the livestock pollutants. Therefore, Gyeongbuk should concentrate on the construction of disposal facilities of livestock pollutant in these areas. The results of this research will contribute to decide what kinds of WPPF should be constructed on which watershed in Nackdong River, and to forecast the future water quality of each watershed.

  • PDF

Groundwater Flow and Water Budget Analyses using HydroGeoSphere Model at the Facility Agricultural Complex (시설농업단지에서 HydroGeoSphere 모델을 이용한 지하수 유동 및 물수지 분석)

  • Kang, Dong-hwan;So, Yoon Hwan;Kim, Il Kyu;Oh, Se-bong;Kim, Suhong;Kim, Byung-Woo
    • The Journal of Engineering Geology
    • /
    • v.27 no.3
    • /
    • pp.313-322
    • /
    • 2017
  • The purpose of this study is to estimate the surface and subsurface flows through the modelling of the model area and facility agricultural complex, and to calculate the groundwater recharge rate through water budget analysis. From results of surface flow modeling, the surface water is flowed to a depth of about 1 to 5 meters from the upper region (northeast) to the lower region (southeast) of the Miryang River. At the M01 point (upper), the observed surface water flux and the model surface water flux are consistent. At the M02 points (lower), the observed surface water flux and the model surface water flux are a difference of 1%. From results of subsurface flow modeling, the depth of groundwater is similar to elevation in the river and higher to the forest area. Ground water depth considering groundwater pumping is that the model values appears higher than the observed values to be within 1.5 m. From results of surface-subsurface integrated modeling, the groundwater recharge area is estimated about 90% of the model area, and the groundwater recharge rate is estimated $1.92{\times}10^5m^3/day$. From results of annual water budget analysis, the groundwater recharge rate per unit area is estimated to be 503.9 mm/year, and average annual rainfall is estimated at around 39%.

Elicitation and Evaluation of Landscape Components for Vitalization of Rural Tourism -Centered on Rural Tourist Attractions of China- (농촌관광활성화를 위한 경관요소 도출 및 평가 -중국 농촌관광지를 대상으로-)

  • Sun, Chang Juan;Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.937-945
    • /
    • 2016
  • Recently, Rural tourism in China is developing rapidly, however, the rural tourism remains unsatisfactory due to ignoring the landscape aspect which is considered as an integral part for rural tourism. Therefore, we aim to investigate the effect of the landscape elements on vitalization of rural tourism by evaluation of the landscape elements. To this end, we made a questionnaire survery concerning importance and satisfaction of landscape elements through factor analysis, and clamp IPA analysis. As the result, 1) Regional product, safety facilities and public parking lots are the primary considerations as primary factor. 2)Traffic facilities and accommodation should reflect regional characteristics; Garbage collection facility, food and beverage facilities, network and electricity facility should be rectified and maintained; Regaining the original nature characteristics of river and lake, Securing the integrity of the visual appreciation by shelter landscape for Sewage Purification. Our study results may provide a basic reference for the development and management of rural tourism attractions in China.

Analysis of the Physical Characteristics and Tranquility of the Valley in Gangwon Province (강원지역 계곡의 물리적 특성 및 고요함 분석)

  • Kim, Kyoung-Nam;Han, Gab-Soo
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.152-160
    • /
    • 2014
  • The purpose of this study is to investigate and analyze the physical characteristics and tranquility of the valleys located in Gangwon region. For this study we analyzed the field survey data 135 valleys using GIS. The elements for measurement of tranquility were divided into visual elements including terrain, objects, forest, water and auditory elements including noise. These elements were divided further into positive and negative factors. The weight of each element and item was calculated by applying the AHP method. The results of this study are as follows. The length of the valley ranged from 126 m to 17 km, and the elevation ranged from 40 m to 1,800 m. Type of mixed forest was common in the valleys. The depth of the water was over 20 cm in 83% of the total area and most of the water was in good condition in visual quality. Regarding the positive factors of tranquility, the weighted scores of the objects, waterfall sounds and visual transparence of the water were of relatively high value. Relatively high values were also shown in closed and curved topography in the landform, forest type and natural forests. In the negative factors, the weights of the objects and forest elements had high values. Within the facility groups, facility of the river produced a considerable negative. After applying the index of tranquility, the natural physical attributes affected the tranquility value, more than the manmade structures to a much greater degree.

Study on the growth and control of algae using effluent of sewage treatment facility (하수처리장 방류수 재이용에 따른 조류 생장 및 제어방안 연구)

  • Park, Soo young;Kim, Jin Han;Park, Jung Hwan;Ahn, Kyung Soo
    • Journal of Wetlands Research
    • /
    • v.7 no.3
    • /
    • pp.67-73
    • /
    • 2005
  • At research, the river's water which the sewage treatment facility will ask growth suppression the algae in the artificial rivers which it is using or it researched the method for the removal of the algae which grew. At results, when 60ppm of Chlorine was put in, the possibility of getting the result where 90% chlorophyll-a was removed and LC50 was 0.8ppm. The algae did not create even after 20days by which uses prevent agent of creation of the algae. Controlling the chlorine almost there was not an extinction effect of the algae which was already in large quantities multiplied, with in the effect against an water ecosystem widely known it is not. The prevent agent could inhibit creation of the algae, but it was judged with the fact that the methods are directly applied to the field must be researched continuously.

  • PDF

Development of an Approximate Cost Estimating Model for River Facility Construction at Planning Stage (이.치수형 하천공사 개략공사비 산정모델 개발)

  • Lee, Si-Wook;Lee, Jeong-Yoon;Park, Sung-Hwan;Choi, Jae-Joon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.95-103
    • /
    • 2009
  • The case of rivers facilities works, expense the standard unit cost for the quality and a rough public corporation expense estimating of the rivers public corporation which is fixed form with the information available which it follows basic design phase absently and possibility of fluctuation. It exists many difficulties in rough public corporation expense estimating. The rivers public corporation expense rough estimating method of existing produces does not exist the amount of material of representative section of the rivers dike and the rough public corporation expense estimating method which is systematic with the method which multiples the seniority (M). The research sees the rough public corporation expense predictive model from the planning stage which is not basic design to consider the quality of the rivers facility public corporation. From this study, it can prevent the waste of national budget from the general public corporation and is more accurate and public corporation expense production possibly.

Quality Assessment of the Nationwide Water Pollution Source Survey Results on the Prioritized Toxic Water Pollutants from Industrial Sources in the Geum-River Basin by Exploratory Data Analysis (금강유역 산업계 특정수질유해물질 배출현황에 대한 탐색적 데이터 분석을 통한 전국오염원조사 결과 적합성 평가)

  • Kim, Eun-Ah;Kim, Yeon-Suk;Kim, Yong Seok;Rhew, Doug Hee;Jung, Je Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.6
    • /
    • pp.585-595
    • /
    • 2014
  • The temporal trends of the prioritized toxic water pollutants generated and discharged from the industrial facilities in the Geum-River basin, Korea were analyzed with the results of the nationwide Water Pollution Source Survey conducted in 2001 - 2012. The statistical results indicated rapid increase in the volume of raw toxic wastewaters whereas the amount of each toxic pollutant kept fluctuating for 12 years. Serious discrepancies in the survey data of the same type of industries demonstrated a low reliability of the survey result, which stemmed from several error factors. A unit-load for each type of industrial facility was devised to estimate the amount of prioritized toxic water pollutant based on the total volume of industrial wastewater generated from the same type of industrial facilities. The supplementary measures with an effective permit issuance policy and adding survey parameters of terminal wastewater treatment plants to use them as references to the Water Pollution Source Survey were suggested as means to minimize the errors associated with the false reports from the industries.

A Study on the Development Alternatives for the Port Facility in the Han River Estuary (한강하구지역의 항만시설 개발대안에 대한 연구)

  • Choi, Yong-Seok;Choi, Sang-Hei;Yang, Chang-Ho
    • Journal of Navigation and Port Research
    • /
    • v.30 no.8 s.114
    • /
    • pp.699-709
    • /
    • 2006
  • The objective of this paper is to quickly examine the prosperity of a marine transportation system and port development in the Han river Estuary and Yellow Sea border areas and to establish a cooperative management plan for the development of marine transportation and port service for cargo transportation in Seoul, as well as between South Korea and North Korea. Specifically, a development plan with a sincere effort to preserve the environment surrounding Marine Peace Park. The intent is to prove that prosperity is possible through the development of marine transportation and port service. Considering conditions of navigation, site, cost, and transportation, four port candidates are proposed for the port in near Seoul and we performed the analysis of candidates to develop the port.

Assessment of Accuracy of SRTM (SRTM(Shuttle Radar Topography Mission)의 정확성 평가)

  • Yoo, Seung-Hwan;Nam, Won-Ho;Choi, Jin-Yong
    • KCID journal
    • /
    • v.14 no.1
    • /
    • pp.80-88
    • /
    • 2007
  • The Shuttle Radar Topography Mission (SRTM) obtained elevation data on a near-global scale to generate the most complete high-resolution digital topographic database of Earth. SRTM consisted of a specially modified radar system that flew onboard the Space shuttle SRTM consisted of a specially modified radar system that flew onboard the Space Shuttle Endeavour during an 11-day mission on February 2000. Since 2004, in a GLCF (Global Land Cover Facility, http;//glcf.umiacs.umd.edu/) web-site, products of SRTM including 1Km and 90m resolutions for outside US and a 30m resolution for the US have been provided. This study is to assess the accuracy of SRTM-DEM in comparing with NGIS-DEM generated from NGIS digital topographic map(1:25,000) in Guem river watershed. For the Geum river watershed, SREM-DEM elevation ranged from 0 to 1,605m and NGIS-DEM ranged from 6 to 1,610m, and the average elevation of SRTM-DEM was 226.7m and 218.9m for NGIS-DEM, respectively. NGIS-DEM was subtracted from SRTM in three zones -Zone I (0~100m), Zone II (100~400m), Zone III (over 400m)- to estimate difference between SRTM and NGIS-DEM. As the results, the differences of these DEM were 5.2m (11.6%) in Zone I, 8.8m (3.8%) in Zone II, 12.5m (2.1%) in Zone III. Although there were differences between SRTM-DEM and NGIS-DEM, SREM-DEM would be possible to be utilized as DEM data for the region where DEM is not prepared.

  • PDF

A successful province of agriculturalwater-saving: Gansu

  • Bin, Jiang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.194-194
    • /
    • 2016
  • Gansu, located in the northwestern region, is a typical agricultural province of arid, semiarid in China. The shortage of water resources is the biggest obstacle of Gansu Province's development, and the dry farming water-saving is the eternal theme of Gansu agricultural sustainable development. In recent years, intensify reform in Gansu, has walked out a successful way in the agricultural water-saving. Using the integrated river basin governance as opportunity, the total water-using quantity was regarded as rigidity to retrain, distributed to counties (districts), irrigated areas, towns, associations, groups step by step. Agricultural water price was substantially increased, with the surface water price from about $0.1RMB/m^3$ to more than $0.2 RMB/m^3$, and the ground water from zero to more than $0.1RMB/m^3$. Simultaneously, the difference water prices and over-quota water progression price markup were carried out. The transaction of water rights was encouraged to impel the peasant to establish the consciousness of saving-water. The regulatory documents were formulated to standardize the scope, condition, mode, program etc. of agriculture water-rights transaction, to guarantees the transaction of water rights is carries out in order. The pattern of farming was optimized and adjusted, reducing the high water-consumption crop, increasing economic crops with high benefit and low water-consumption, developing industrialized agricultures such as green house. The relative engineering and measuring facility were comprehensively improved, with the anti-seepage of canal system and the enforcement of dynamo-electric well, developing high-efficient water-saving irrigation and overall metering facilities. The water fine-grained management has realized, and obvious water-saving effect has obtained: water-using rate in the irrigation area by river water has brought up to 0.57 from 0.52, and by well water up to 0.84 from 0.76. Although the water price has increased, the proportion that the water rate expenditure accounted for the cost lasts decline, and the farmers' income has gone up. The peasants express, the used water is few, and it is few to till land, but the income is many, and life is better.

  • PDF