International conference on construction engineering and project management
/
2009.05a
/
pp.1201-1208
/
2009
A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1998.10a
/
pp.41-46
/
1998
The purpose of the study was changed of Flood Characteristics in Down stream of Keum River by the Keum River Estuary Dam Construction. The water surface slope of Kuem river after the Keum River Estuary Dam construction was steeper then before. The flood control capacity increase after construction. But, Increasing sediment in Kuem river will be decreased flesh reservoir volume for yield irrigation.
Shin, Hyoung Sub;Hong, Il;Kim, Ji-Sung;Kim, Kyu Ho
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.4
/
pp.2419-2427
/
2014
This paper defines the hydro-geomorphological river area to estimate the change of the river function before/after levee construction, and proposes the methodology that calculates the river area by using GIS. The boundary of river area is determined by the 100-year potential flood inundation area without the levee effect of the flood protection. Firstly, 1918' land-use map was digitized and the changes were analyzed by comparing with 2007' digitized map. The result shows that urban/farmland zone in Mankyung river area were increased by 0.4%/11.6% and bare ground was decreased by 10.0% so that the effective use of floodplain due to levee construction leaded to better productivity, but the decrease of the environment function of the river was predicted as result of the reduction of the river area.
International conference on construction engineering and project management
/
2017.10a
/
pp.353-361
/
2017
In order to improve the urban ecological environment, the central government has developed a series of water pollution control policies and measures since April 2015, and required local governments to complete the work of the polluted river and lake restoration within specified period. Moreover, the polluted river and lake restoration has been selected as a key evaluation indicator of achievements of the sponge city construction implemented since April 2015. This paper describes how to apply the sponge city construction technology to rehabilitate the polluted rivers and lakes through the polluted water treatment project in Xinghan New Area, Hanzhong and the polluted Huaguping River restoration project in Pingshan District, Shenzhen. The experience and lessons of the polluted river and lake restoration are summed up. Some measures to solve existing problems are put forward.
This study was conducted to investigate the characteristics of meteorological environment variation before and after construction of Nak-dong river estuary barrage. We used meteorological data(air temperature, precipitation, relative humidity, visibility, wind) at Gimhae airport meteorological station. The construction of river estuary barrage can change climate at the neighboring districts and influence human's health and vegetable. The construction of Nakdong river estuary barrage brought rise of temperature, decrease of relative humidity and increase of poor visibility frequency.
Journal of The Geomorphological Association of Korea
/
v.24
no.1
/
pp.13-24
/
2017
This study analyzes altitude changes of riverbed at 6 bridges in the upper and lower reaches of Yeongju Dam in Naeseong River, from 2009 to 2016 just before and after the dam construction. For 5 years from November 2010 to December 2015 when the dam was under construction, approximately 0.091m of the riverbed altitude in average more than twice before the dam construction was lowered, because of the effects of riverbed excavation for riverside maintenance in the upper reaches and transport limitation of flow and sediment by the dam in the lower reaches. Between November 2009 and December 2016 when the dam was in pre-construction and post-construction stages, respectively, the most sites in this study in the upper and lower reaches showed lowering in the riverbed altitudes. On the other hand, the riverbed around Hoeryongpo closed to the river mouth seems to be influenced by channel changes in Nakdong River rather than by the dam construction.
The estuary has a very complex coastline and bottom topography. Before the close of floodgate, the Keum river estuary was deposited with sediment from the Keum river, created bythe construction of the Keum river estuary dike. So, a periodical dredging is necessary to assure water depth for boat entry and departure to Kunsan port. Theof this study is to find the change of tidal current of M2tide and the topography before and after construction at the Geum River estuary dike. The change of water depth is investigated by digitizing the sea map (No.305) of Kunsan port, which was edited by National Oceanographic Research Institute. The calculated co-range and co-tidal charts of M2tide before the dike construction are similar to the observed ones. Therefore, the amplitude and phase after construction at Geum River estuary dike increases compared to before construction at Geum River estuary dike. The scour occurred in the A-A' section.
A numerical assessment using mesoscale-CFD (computational fluid dynamics) coupled A2C (atmosphere to CFD) model was carried out to analyze the variation of microscopic air flow pattern due to the construction of the Chilgok barrage in the Nakdong River. Scenarios with air flow patterns were classified into pre- and post-construction. The increased width of the river due to the construction of the Chilgok barrage induced obvious changes in moisture and the thermal environment around the river. However, air temperature variation was restricted within an area along the windward side in the numerical assessment. The impact of barrage construction on air temperature tends to be stronger during the nighttime than the daytime. It also stronger during the winter than the summer. In the simulation, the convergence of mesoscale wind is more pronounced after barrage construction than before. This is caused by the change of heat flux pattern induced by the widening of the river. Although this work is a case study with restricted atmospheric stability conditions that has several limitations in the numerical simulations, the impacts of the land-use changes brought about by the construction of the barrage in the river acceptable.
Journal of the Korean Society of Environmental Restoration Technology
/
v.11
no.3
/
pp.74-86
/
2008
To assessment the disturbances of the Namgang caused by dam construction, upstream area was selected for the reference reach and downstream area was selected for the comparison reach. And these reaches were surveyed and analyzed according to the assessment criteria of the river disturbances.The artificial factors of river disturbances were classified as river improvement works, dam construction and aggregate dredging. The indexes were physical factors as like epifaunal (bottom), embeddedness, velocity/depth regime, sediment deposition, channel flow status, channel alteration, frequency of riffles, bank stability, vegetative protection, riparian zone etc.The assessment results showed 46% of the assessment criteria which was serious status in dam downstream area and 89.5% of it which was excellent status in dam upstream.Finally, the results showed that physical river environment in downstream area was disturbed by the discharge control and the interception of sediment discharge by dam, consequently this disturbance give rise to impact of ecosystem in river.
International conference on construction engineering and project management
/
2017.10a
/
pp.62-72
/
2017
In this study, liner unit root tests and panel unit root tests to the ratio of city to regional house price were applied to examine the ripple effects across 28 cities in the Yangtze River Delta region. Then invert LM unit root tests with two structural breaks for 10 representative cities were conducted. The results showed that there is overwhelming evidence of the existence of ripple effect in the Yangtze River Delta region, while segmentation is restricted to a small group of cities in which there is no long-run relationship with the Yangtze River Delta region average; compared to no- and one-break case, there is overwhelming evidence of a ripple effect with the LM test with two structural breaks. Furthermore, the results of the Granger causality test showed that changes in house prices in Shanghai, Nanjing and Hangzhou have led to changes in house prices in other cities. The findings of this research make certain contributions to the improvements of research system of ripple effect among regional house prices in the Yangtze River Delta Region,and could be referenced by other markets of other cities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.