Browse > Article

A Study on the Topography and Current Characteristic of the Before and After Construction at Geum River Estuary Dike  

Shin Moon-Seup (Division of Civil & Environmental Engineering, Kunsan Univ)
Bae Ki-Seong (Department of Ocean Civil Engineering)
Kang Shin-Jung (Department of Civil Engineering, Kunsan Univ)
Kim Jae-Hyoung (Department of Civil Engineering, Kunsan Univ)
Publication Information
Journal of Ocean Engineering and Technology / v.20, no.3, 2006 , pp. 61-66 More about this Journal
Abstract
The estuary has a very complex coastline and bottom topography. Before the close of floodgate, the Keum river estuary was deposited with sediment from the Keum river, created bythe construction of the Keum river estuary dike. So, a periodical dredging is necessary to assure water depth for boat entry and departure to Kunsan port. Theof this study is to find the change of tidal current of M2tide and the topography before and after construction at the Geum River estuary dike. The change of water depth is investigated by digitizing the sea map (No.305) of Kunsan port, which was edited by National Oceanographic Research Institute. The calculated co-range and co-tidal charts of M2tide before the dike construction are similar to the observed ones. Therefore, the amplitude and phase after construction at Geum River estuary dike increases compared to before construction at Geum River estuary dike. The scour occurred in the A-A' section.
Keywords
Estuary; Geum river estuary; Topography change; Digitizing; Change of water depth;
Citations & Related Records
연도 인용수 순위
  • Reference
1 군산지방해양수산청 (2001). 군.장항 매몰저감대책시설 기본 계획수립 용역 보고서
2 권효근, 이상호 (1997). '금강 하구언의 수문닫음으로 인한 하구의 해수면 변화' 춘계학술발표회 요약집, 한국해양학회 pp 1-1
3 서승원 (1998b). '금강하구역의 수동역학적 변화(2) -수치실험을 중심으로-' 한국해안.해양공학회논문집, 제10권, 제1호, pp 18-26
4 신문섭, 배기성, 김남형 (2001). '새만금 간척전.후 금강 하구의 퇴적 과정에 관한 연구' 한국지반환경공학회논문집, 제2권, 제3호, pp 5-15
5 최병호, 오윤근 (1987). '금강하구둑에 의한 조석변화의 초기 추정' 한국수문학회지, 제20권, 제2호, pp 161-168
6 해운항만청 (1982). 군산항 수심측량 용역보고서
7 Masch, F.D., Branders R.J. and Reagan J.D. (1997). 'Computation of Numerical Hydraulic Models' Masonboro Inlet, North Carolina, Giti Report 6
8 서승원 (1998a). '금강하구역의 수동역학적 변화(1) -관측자료를 중심으로-' 한국해안.해양공학회논문집, 한국해안.해양공학회, 제10권, 제1호, pp 10-17
9 박원경, 서승원 (1995). '대규모 공사로 인한 금강하구역의 퇴적환경변화' 정기학술강연회 발표논문 초록집, 한국해안.해양공학회, pp 44-47
10 신문섭, Yanagi T. (2002). '새만금간척 전.후 잔차류의 계절 변화에 관한 연구' 한국수자원학회논문집, 제35권, 제4호, pp 425-442
11 안희수, 오임상 (1995). '유한요소법에 의한 금강하구역의 조석 및 금강 유입의 수치실험' 한국해양학회지, 제30권, pp 299-308
12 군산지방해양수산청 (1999). 금강하구 수리현상 변화조사 보고서
13 신문섭 (2002). '새만금간척 퇴적과정에 관한 연구(II)' 한국농공학회지, 제44권, 제5호, 별책. pp 33-40