• Title/Summary/Keyword: Risk management factors

Search Result 2,601, Processing Time 0.027 seconds

A Framework for Systematic Management of Operational Risks

  • Akpolat, Hasan;Pitinanondha, Thitima
    • International Journal of Quality Innovation
    • /
    • v.10 no.2
    • /
    • pp.1-17
    • /
    • 2009
  • This paper presents a theoretical research framework that was used to analyse operational risk management (ORM) system practices in Australia. It provides a new perspective on how to use national and international operational management system standards as a basis for systematic management of operational risks. Based on the extensive literature review and the analysis of operational risk management system practices that are common in Australian organisations, this paper identifies the critical factors for effective use of an ORM system. The proposed framework could also be used as a model to research ORM system applications in other countries.

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

Endoscopic retrograde cholangiopancreatography-related complications: risk stratification, prevention, and management

  • Clement Chun Ho Wu;Samuel Jun Ming Lim;Christopher Jen Lock Khor
    • Clinical Endoscopy
    • /
    • v.56 no.4
    • /
    • pp.433-445
    • /
    • 2023
  • Endoscopic retrograde cholangiopancreatography (ERCP) plays a crucial role in the management of pancreaticobiliary disorders. Although the ERCP technique has been refined over the past five decades, it remains one of the endoscopic procedures with the highest rate of complications. Risk factors for ERCP-related complications are broadly classified into patient-, procedure-, and operator-related risk factors. Although non-modifiable, patient-related risk factors allow for the closer monitoring and instatement of preventive measures. Post-ERCP pancreatitis is the most common complication of ERCP. Risk reduction strategies include intravenous hydration, rectal nonsteroidal anti-inflammatory drugs, and pancreatic stent placement in selected patients. Perforation is associated with significant morbidity and mortality, and prompt recognition and treatment of ERCP-related perforations are key to ensuring good clinical outcomes. Endoscopy plays an expanding role in the treatment of perforations. Specific management strategies depend on the location of the perforation and the patient's clinical status. The risk of post-ERCP bleeding can be attenuated by preprocedural optimization and adoption of intra-procedural techniques. Endoscopic measures are the mainstay of management for post-ERCP bleeding. Escalation to angioembolization or surgery may be required for refractory bleeding. Post-ERCP cholangitis can be reduced with antibiotic prophylaxis in high risk patients. Bile culture-directed therapy plays an important role in antimicrobial treatment.

Segmentation of Cooperatives' Mutuality Bank for Effective Risk Management using Factor Analysis and Cluster Analysis

  • Cho, Yong-Jun;Ko, Seoung-Gon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.3
    • /
    • pp.831-844
    • /
    • 2008
  • Since cooperatives consist of many distinct members in the management environment and characteristics, it is necessary to make similar cooperatives into a few groups for the effective risk management of cooperatives' mutuality bank. This paper is a priori research for suggesting a guidance for effective risk management of cooperatives with different management strategy. For such purpose, we propose a way to group the members of cooperative's mutuality bank. The 30 continuous variables which is relative to cooperatives' management status are considered and six factors are extracted from those variables through factor analysis with empirical consideration to avoid wrong grouping and to enhance the practical interpretation. Based on extracted six factors and additional 3 categorical variables, six representative groups are derived by the two step clustering analysis. These findings are useful to execute a discriminatory risk management and other management strategy for a mutuality bank and others.

  • PDF

Risk Factors Affecting Equipment Management in Construction Firms

  • PHAM, Cuong Phu;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To;LE, Loan Phuc;DUONG, My Tien Ha
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.11
    • /
    • pp.347-356
    • /
    • 2020
  • Mechanization and automation constitute an essential stage in the production and operation of any company, as one of the determinants of increase in labor productivity and decrease in product price, while significantly contributing to shortening of the lead time. Businesses are, therefore, able to quickly put projects into operation, improving economic efficiency, quality, and aesthetics, which speeds up the national economic growth. For the construction industry to be the most effective, modern construction equipment is a necessity. It is one of the five main resources of a construction project. Thus, effective construction equipment management contributes to the success of a project and benefits the relevant construction companies economically. This paper presents the critical risk factors affecting equipment management and proposes suitable solutions. The questionnaire-based survey with experienced experts in the construction sector on the management of the likelihood and consequence of risk factors revealed thirty-two risks for equipment management in construction companies. These factors fell into six groups: (i) site organization-related risks; (ii) management-related risks; (iii) owner-related risks; (iv) supplier-related risks; (v) legal risks, and (vi) site condition-related and external risks. The results showed that management-related factors contributed to the most significant risks and problems for equipment management in construction companies.

Risk factors for hypertension in elderly people aged 65 and over, and adults under age 65 (65세 이상 노인과 65세 미만 성인의 고혈압 위험요인)

  • Kim, Ka Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.162-169
    • /
    • 2019
  • This study investigated the risk factors of hypertension among individuals under and over 65 years of age. A total of 6,152 participants were analyzed using the 6th Korean Longitudinal Study of Aging. The collected data were analyzed by Chi-square tests and logistic regression using SPSS 23. The results showed that the subjective health status, diabetes, heart disease, and degree of obesity according to BMI were risk factors affecting hypertension in individuals both under and over age 65. In adults under age 65, chronic lung disease, digestive disease, and drinking were risk factors affecting hypertension. In elderly over age 65, region, arthritis and rheumatic disease, smoking, and cognitive function were risk factors affecting hypertension. There is a need for chronic disease management in Korea due to rapid aging. In particular, it is important to analyze for effective management age-related risk factors affecting steadily increasing hypertension with age. Therefore, it is necessary to manage chronic disease management through social welfare improvement and welfare plans for the elderly, as well as personal management.

A risk management system applicable to NATM tunnels: methodology development and application (NATM 터널의 리스크 관리 시스템 개발 및 현장적용)

  • Chung, Heeyoung;Lee, Kang-Hyun;Kim, Byung-Kyu;Lee, In-Mo;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.155-170
    • /
    • 2020
  • In this paper, a risk management system applicable to NATM tunneling projects is proposed. After investigating case histories in NATM tunnel collapse, this paper analyzes the potential risk factors and their corresponding risk events during NATM tunnel construction. The risk factors are categorized into three groups: geological, design and construction risk factors. The risk events are also categorized into four types: excessive deformation, excessive deformation with subsidence, collapse inside tunnels, and collapse inside tunnels with subsidence. The paper identifies risk scenarios in consideration of the risk factors and proposes a risk analysis/evaluation method for the NATM tunnel risk scenarios. Based on the evaluation results, the optimal mitigation measure to handle the risk events is suggested. In order to effectively facilitate a series of risk management processes, it is necessary to develop a risk register and a management ledger for risk mitigation measures that are customized to NATM tunnels. Lastly, the risk management for an actual NATM tunnel construction site is performed to verify the validity of the proposed system.

A Study on Cybersecurity Risk Assessment in Maritime Sector (해상분야 사이버보안 위험도 분석)

  • Yoo, Yun-Ja;Park, Han-Seon;Park, Hye-Ri;Park, Sang-Won
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.134-136
    • /
    • 2019
  • The International Maritime Organization (IMO) issued 2017 Guidelines on maritime cyber risk management. In accordance with IMO's maritime cyber risk management guidelines, each flag State is required to comply with the Safety Management System (SMS) of the International Safety Management Code (ISM) that the cyber risks should be integrated and managed before the first annual audit following January 1, 2021. In this paper, to identify cyber security management targets and risk factors in the maritime sector and to conduct vulnerability analysis, we catagorized the cyber security sector in management, technical and physical sector in maritime sector based on the industry guidelines and international standards proposed by IMO. In addition, the Risk Matrix was used to conduct a qualitative risk assessment according to risk factors by cyber security sector.

  • PDF

Development of Risk Management Process for KSLV-I Program (KSLV-I 사업을 위한 위험관리 프로세스 개발)

  • Yoo, Il-Sang;Cho, Kwang-Rae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.1
    • /
    • pp.94-100
    • /
    • 2006
  • The risk management is an organized method for identifying and measuring risk and for selecting, developing, and implementing options for the handling of risk. The risk management covers all programatic and technical factors which affect the system development performance, cost, and schedule. While technical issues are primary concern for systems engineering, the three elements(performance, cost, and schedule) must be balanced for a successful risk management process. This paper proposes the risk management process for the KSLV-I(Korea Space Launch Vehicle-I) program using computer-aided systems engineering tool, Cradle. The risk management process of KSLV-I program is similar to the general risk management process, but it has its own specific features to manage large-scale complex characteristics of KSLV-I program.