Enterprise Risk Management(ERM) is aiming at the establishment of the risk management process to prevent and cope with risks in advance and is composed of Risk Identification, Risk Assessment, Risk Response and Monitoring. It is feedback through the Risk Re-identification. This study has analysed a sample of the risk management system of an airport operating corporation, for this purpose, relevant documents and examples of overseas airports have been reviewed. It has found that corporations establishing ERM have been performing identical procedures such as the process of Identification, Assessment, Effective Reporting, Communication and monitoring and so on. The A corporation has established the process for risk management and crisis management and organized for its organization and system. The risk management has the same process such as above. In this process, when the symptoms of critical crisis have been recognized, it has been transformed into crisis management system, through which, corporate-wide response has been conducted in the process of crisis status analysis, response and follow-up management. This study expects to contribute to systematic foundation for future business continuity on the basis of risks and response procedures acknowledged by this study.
The Railway Safety Management System is based on risk management and the basic purpose of risk management is safety management activities to prevent railway accidents and operational obstacles in advance. In order to manage risk, an acceptable risk standard must be established. This risk criterion is used to evaluate the railway risk with both frequency and severity. In the case of overseas railway or other industrial sectors, various factors are reflected in the main variables that constitute the occurrence frequency, but this is no the case in the domestic railway sector. In particular, the current risk assessment criteria in the railway sector remain at a level that exploits the incidents that have occurred in the past and the severity of the property damage and it dose not properly reflect complex and diverse environmental and situational changes in railway operations. Therefore, in this study, it is possible to calculate the potential occurrence of future events instead of occurrence frequency as a component of the risk assessment criteria, focusing on the High-Speed Railway. In addition to the property damage to the consequence, we suggest a rational methodology, development direction, and theoretical implications for constructing accurate and reasonable risk criteria including actual damage such as human injury and time loss.
There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.
This paper is a comparative study on risk assessment policy between Asian countries such as Japan, Korea, Singapore and EU countries, German, UK. Risk assessment is a tool adopted currently in many countries in order to reduce occupational risk in workplace because it help employers to identify their hazard arousing in their working conditions then to settle the issues. This paper compares institutional framework posed in EU and Asian countries. As a result of comparative study, EU countries have more concrete legal system for risk assessment than Asian countries. But Asian countries are now interested in risk assessment such as Japan, Korea and Singapore. The author also suggests successful ways to settle down the risk assessment policy in a country. These findings help to understand occupational health and safety policy on risk assessment in Asian countries.
Woo, Darae;Choi, Eunmi;Choe, Young June;Yeh, Jungyong;Park, Sangshin
Health Policy and Management
/
v.32
no.4
/
pp.356-367
/
2022
Background: The emergence of new infectious diseases threatens public health, increasing socioeconomic damage, and national risks. This study aimed to develop an evidence-based risk assessment tool to quickly respond to new infectious diseases. Methods: The risk elements were extracted by reviewing the risk assessment methods of the World Health Organization, United States, Europe, United Kingdom, and Germany, and the validity and priority of elements were determined through expert meetings and Delphi surveys. Then, the scale and level for each risk element were defined and a final score calculation method according to the risk evaluation result was derived. The developed risk assessment tool was verified using data at the time of domestic transmission of an emerging infectious disease. Results: In case of spread of actual infectious diseases, priority is determined based on the criticality of the elements in each area of transmissibility and severity, from which the weighted score of the risk assessment is derived. Then, the risk score for each element was calculated by multiplying the average value of the risk evaluation by its weight and the evaluation risk assessment score for the two areas was calculated. At last, the final score is plotted in a matrix where the x-axis indicates the transmissibility and the y-axis the severity and plotted on the coordinate plane for time series use. Conclusion: With respect to transmissibility and severity, this risk assessment method to respond to new and re-emerging infectious diseases enables rapid and evidence-based evaluation by quantitatively and qualitatively assessing various risk elements.
Park, Hyun-A;Choi, Seo-Yeon;Woo, In-Sung;Rie, Dong-Ho
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.4
/
pp.660-668
/
2017
In this study, we conducted an assessment of the risks posed by the noxious chemicals often handled at the analysis centers of organizations involved in Work Environment Measurement (WEM) using the Chemical Hazard Risk Management (CHARM) system. For this purpose, six organizations involved in WEM located in Seoul and Gyeonggi, which conducted the risk assessment, were selected and, as a result, 29 materials were selected as chemical substances presenting a risk of exposure. In terms of their physical properties, there were 16 liquid and 10 solid materials, and for the special management materials (CMR), the findings were as follows: 'Carcinogenic' 1A - 11 and 1B - 1 (2 - 8); 'Mutagenic' 1A - 4 and 1B - 3 (2 - 8); and 'Repro-toxic' 1A - 0 and 1B - 1 (2 - 6). In the risk estimation, 30.4%, 66.1% and 3.6% of the materials presented 'low', 'average' and 'high' risks, respectively. In addition, two of these six institutions had materials presenting a 'high' risk. This study is significant in that the risk assessment was conducted using CHARM, a chemical substance assessment tool. It is expected that the results will be utilized as the basic data for safety assessment, the establishment of a plan for emergency measures and drawing up a safety management manual, and the institutional and legal management of accidents and risks in the analysis centers of organizations involved in WEM and the management of chemicals by drawing attention to the risks involved.
Journal of the Korean Society of Industry Convergence
/
v.26
no.5
/
pp.845-853
/
2023
The Ministry of Employment and Labor announced a roadmap for reducing serious accidents to create a "safe and healthy workplace, happy Korea" and ordered a risk assessment for all work processes in all workplaces on November 30, 2022. Accordingly, even workplaces that handle new chemicals must conduct risk assessment when introducing new chemicals, but the risk assessment techniques currently proposed by the government focus on preventing conventional accidents such as falls, getting caught, and bumping. Currently, there is a Chemical Hazard Risk Management (CHARM) technique that is most commonly used for chemical risk assessment, but in small and medium-sized businesses that lack professional manpower related to chemical substances, there are many technical terms in the technique and it is difficult to interpret, so its utilization is very low. Therefore, the purpose of this study is to present a method that can make risk assessment easier and simpler before handling new chemicals so that it can be used well in small and medium-sized businesses that lack professional manpower related to chemical substances. Through actual cases, the method of using CHARM was confirmed step by step, and based on this, risk reduction establishment and execution methods were derived. Based on the results of this study, it is expected that it will be used as the best tool for preventing accidents such as acute poisoning when handling chemicals in small and medium-sized workplaces that lack professional manpower related to chemical substances and make every effort to protect workers' health.
Journal of the Korean Society of Hazard Mitigation
/
v.5
no.4
s.19
/
pp.9-15
/
2005
This research developed the RMIS(Risk Management Information System) which focus on works of risk management fields required of apply of a space information, and focus on the DB to establish and apply the space information efficiently with research scope on the LPG refueling station in city. On the basis of the RMIS, this research provides the baseline to lead on an efficiency of safety inspection of LPG refueling station, advance risk assessment, and efficient making decision of an accident correspondence assessment with interlocking the GIS representing risk through the automation of a quantitative risk assessment standardize requirement to control at real-time. The RMIS development process is as follows. firstly, Relational Database(RDB) was developed by using fundamental data both On-site and Off-site relating data as peforming risk assessment on the LPG refueling station in city. Second, the risk management integral database system was developed to monitor and control the risk efficiently for user with using the Visual Basic Program. Third, through interlocking the risk management integral database system and the GIS(Falcon-map) was suggested the decision making method. Represented results through out the RMIS program development are as follows. Firstly, the RMIS was established the mutual information to advance management the risk efficiently for user and inspector with using the risk management data. Second, as this study managed risk for on-site and off-site separately and considered effect for inside and outside of facility, constructed the basis on safety management which can respond to major accident. Third, it was composed the baseline to making decision that on the basis of user interface.
Risk management of the Fukushima Daiichi Nuclear Power Station decommissioning is a great challenge. In the present study, a risk management framework has been developed for the decommissioning work. It is applied to fuel assembly retrieval from Unit 3 spent fuel pool. Whole retrieval work is divided into three phases: preparation, retrieval, and transportation and storage. First of all, the end point has been established and the success path has been developed. Then, possible threats, which are internal/external and technical/societal/management, are identified and selected. "What can go wrong?" is a question about the failure scenario. The likelihoods and consequences for each scenario are roughly estimated. The whole decommissioning project will continue for several decades, i.e., long-term perspective is important. What should be emphasized is that we do not always have enough knowledge and experience of this kind. It is expected that the decommissioning can make steady and good progress in support of the proposed risk management framework. Thus, risk assessment and management are required, and the process needs to be updated in accordance with the most recent information and knowledge on the decommissioning works.
The hazard conditions on plant works of the steel industry have been investigated to efficiently prevent from industrial accidents. The plant works are eventually carried out by workers of smaller service companies where the safety management systems are not well established, on behalf of the main steel company. Based on the preliminary risk assessment on the plant working and open literature reviews, the safety management systems, which can be applied to the plant workplace of each process, are studied and then the step-by-step 4M check-list method is established. Accordingly, the risk assessment technique using 4M checklist for the plant workplace is proposed. In addition, a standardized flow-chart for safety management of plant work is introduced. These risk assessment technique and flow-chart can definitely contribute to the reduction of industrial accidents, considering the risk characterization and the unsafe conditions in small and medium-sized plant workplace, as effective safety management tools and safety guide line.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.