• Title/Summary/Keyword: Risk Management Plan

Search Result 583, Processing Time 0.028 seconds

A Study on Disaster Prevention and Risk Assessment System Applying Combustion Velocity at Traditional Housing Zone (전통건축물보존지구내에서의 연소속도식을 고려한 방재계획의 수립과 재난위험도평가 시스템 구축에 관한 연구)

  • 김희성;노삼규
    • Fire Science and Engineering
    • /
    • v.15 no.4
    • /
    • pp.1-9
    • /
    • 2001
  • The purpose of this study is to set up disaster prevention plan and risk assessment system considering combustion velocity at traditional housing zone. The combustion velocity analysis could contribute to build in disaster prevention technique through the potential risk analysis of the area, such analysis also able to set up comprehensive disaster prevention management system. Following results have achieved through the combustion velocity calculation. \circled1 The combustion velocity was calculated in order of the below winds, the above winds and the side winds. \circled2 It must be careful to set up disaster prevention plan in case of the below winds. \circled3 The combustion velocity was calculated at the density Bone where neighboring Distance and Length was small. \circled4 It proved that factors of each parameter not mostly effect to analyse the combustion velocity in limit of the 30 minutes after ignition. \circled5 At the density zone where Distance and Length is small the duration of transfer to neighboring house takes up to 4 minutes, it is required to set up of emergency response plan to minimize the fire dispersion.

  • PDF

A Study on the Analysis Method of Safety Cost of Tunnel Accident (터널사고 재난 안전비용 분석 방법에 관한 연구)

  • Baek, Chung-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.23-30
    • /
    • 2021
  • This paper analyzed a survey of 388 general target samples to analyze the correlation between disaster safety costs and human risk factor analysis and evacuation behavior due to tunnel accidents. Considering the impact of the tunnel accident on disaster safety costs and the correlation between human evacuation and risk factors in the tunnel environment, the system should be reorganized to reflect the tunnel's basic plan, tunnel cross-section, tunnel installation.

A study of how Supply Chain companies correspond to water risk resulted from climate change (기후변화에 따른 기업 공급체인의 물 리스크 대응 실태 조사)

  • Park, Jiyoung;Park, Seogha;Lim, Byungsun;Kim, Chesoong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.149-168
    • /
    • 2015
  • It is expected that the temperature in Pyeongyang will be similar to that ($16.6^{\circ}C$) in Seogwipo in the late 21st century, and most of South Korea will enter the subtropical climate due to climate change. Change in the precipitation pattern like the range of fluctuation caused by climate change will lead to expanded uncertainty in securing reliable water supply, along with a serious impact on demands for living and industrial water due to change in the volume and period of river outflow. As industrial water for production activities is estimated based on the contract quantity, it is difficult to apply rationalization of water usage and incentives in water recycling. Therefore many companies are making efforts in complying with the effluent standard while spending few resources on such rationalization and recycling. This study researched water risk management over 115 Korean companies by 28 questions in 4 categories. Through the research, this study aims to understand water risk management levels and seek response plans.

Study on the Plan for Reduction of Credit Risk of Medium-size Construction Companies Preparing for Restructuring (구조조정에 대비한 중견건설사 신용리스크 저감방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.64-73
    • /
    • 2020
  • The government announced a plan for fund support to the enterprises with high possibility of recovery and early restructuring for the enterprises with low recovery by objectifying credit assessment system. Such announcement of government could be extended to restructuring risk of middle standing enterprises with low financial soundness by establishing the basis to prepare prompt restructuring by reinforcing the basis for restructuring through capital market. This research analyzed financial soundness based on the financial evaluation of bank by selecting 10 middle standing construction companies which focused on housing business in 2019, based on such analysis result, it was confirmed that there was a high possibility of restructuring risk. This research determined that there would be a decrease in growth rate of construction industry on the whole in 2020 due to fall of economic growth rate and reinforced real estate regulation, accordingly, there's a big possibility for middle standing construction companies with paid-in capital ratio due to its low possibility of maintenance of stable credit rating. This research established KCSI assessment model by utilizing the material of a reliable research institute in order for middle standing construction companies to evade restructuring risk, and indicated risk ratio differentiated per each item through a working-level expert survey. Such research result could suggest credit risk reduction method to middle standing construction company management staffs, and prepare a basis to evade restructuring risk.

Analysis of Perception Differences between Construction Workers and Managers Implementing for the Severe Accident Punishment Act: Focused on Measures to Improve Safety Management Effectiveness (중대재해처벌법 시행에 따른 건설현장 근로자와 관리자의 인식차 분석: 안전관리 실효성 향상 방안을 중심으로)

  • Jae-Hwan Cho;Sung Hak Chung
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.75-89
    • /
    • 2024
  • The objective of this study was to conduct research and analysis using Group Focus Interview to survey the between construction site workers and managers implementing for the Severe Accident Punishment Act. Focused on measures to improve safety management effectiveness for the effectiveness of establishing a safety management system. A plan to improve the efficient safety management system was presented to 50 construction industrial managers and workers. In order to ensure the industrial accident prevention policies appropriately, it is necessary to be aware of safety obligations for workers as well as business operators. In addition, despite the existence of a commentary on the Serious Accident Punishment Act, confusion in the field still persists, so in the event of a major accidents, the obligation to take safety and health education is strengthened, and effective case education is proposed by teaching actual accident cases suitable for actual working sites. It is necessary to make all training mandatory, and it is necessary to reconsider awareness through writing a daily safety log, awareness of risk factors, etc., and writing down risk information. Above all, at the construction ordering stage, it is necessary to keep the construction safety, request corrections and supplements for problems issues that arise, and consult between the orderer and the construction company about the problems issues. Rather than having only the construction company correct or supplement the safety management plan, the contents should be shared with supervisors and workers to establish a more practical solution. Results of this study will contribute to improving the effectiveness of the serious accident and construction safety management system.

A Two-Plan Sampling System for Life Testing Under Weibull Distribution

  • Aslam, Muhammad;Balamurali, Saminathan;Jun, Chi-Hyuck;Ahmad, Munir
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.1
    • /
    • pp.54-59
    • /
    • 2010
  • A two-plan sampling system is proposed for a failure-censored life testing when the lifetime follows a Weibull distribution with known shape parameter. The proposed sampling system is based on a switching rule, for switching between the tightened and the normal inspection levels when lots are submitted for inspection in the order of production or in some other systematic way. The design parameters of the proposed sampling system are determined by the two-point approach considering the producer's risks and the consumer's at the specified acceptable reliability level and the lot tolerance reliability level, respectively. It has been observed that the proposed system requires only a single failure for the observation.

A Bulk Sampling Plan for Reliability Assurance (벌크재료의 신뢰성보증을 위한 샘플링검사 방식)

  • Kim, Dong-Chul;Kim, Jong-Gurl
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.2
    • /
    • pp.123-134
    • /
    • 2007
  • This paper focuses on the in-house reliability assurance plan for the bulk materials of each company. The reliability assurance needs in essence a long time and high cost for testing the materials. In order to reduce the time and cost, accelerated life test is adopted. The bulk sampling technique was used for acceptance. Design parameters might be total sample size(segments and increments}, stress level and so on. We focus on deciding the sample size by minimizing the asymptotic variance of test statistics as well as satisfying the consumer's risk. In bulk sampling, we also induce the sample size by adapting the normal life time distribution model when the variable of the lognormal life time distribution is transformed and adapted to the model. In addition, the sample size for both the segments and increments can be induced by minimizing the asymptotic variance of test statistics of the segments and increments with consumer's risk met. We can assure the reliability of the mean life and B100p life time of the bulk materials by using the calculated minimum sample size.

A Study on the Development of an Operation Risk Analysis Model in BTL Projects (BTL사업 운영리스크 분석 모형 개발에 관한 연구)

  • Lee, Jeong-Sun;Lee, Jeong-Hun;Oh, Se-Wook;Yoo, Hyun-Seok;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.475-480
    • /
    • 2008
  • In BTL project, the operation cost covering upcoming 20 years is usually alloted more than construction cost although its plan is made in short time. Therefore, it is a key issue to forecast and to analyze operation risks in the process of making contract in order to successfully finish the BTL project and to ensure the profitability of business. However, only a few domestic professional management companies are capable to carry out funding and facility management. To manage the potential risks efficiently in BLT project, it's essential to prioritize the risk factors by means of considering economical risk level, non-economical risk level and occurrence frequency. Thus, this study suggests risk analysis model for improving efficiency of BTL project from operation company's perspective by means of survey. The suggested risk analysis model is expected to establish a risk management strategy which can improve the efficiency of management affairs in BTL project.

  • PDF

Practical strategies for the prevention and management of chronic postsurgical pain

  • Bo Rim Kim;Soo-Hyuk Yoon;Ho-Jin Lee
    • The Korean Journal of Pain
    • /
    • v.36 no.2
    • /
    • pp.149-162
    • /
    • 2023
  • Chronic postsurgical pain (CPSP) is a multifactorial condition that affects a significant proportion of patients undergoing surgery. The prevention and management of CPSP require the identification of preoperative risk factors to screen high-risk patients and establish appropriate perioperative pain management plans to prevent its development. Active postoperative pain management should be provided to prevent CPSP in patients with severe pain following surgery. These tasks have become important for perioperative team members in the management of CPSP. This review article provides a comprehensive overview of the latest research on the role of perioperative team members in preventing and managing CPSP. Additionally, it highlights practical strategies that can be employed in clinical practice, covering the definition and risk factors for CPSP, including preoperative, intraoperative, and postoperative factors, as well as a risk prediction model. The article also explores various treatments for CPSP, as well as preventive measures, including preemptive analgesia, regional anesthesia, pharmacological interventions, psychoeducational support, and surgical technique modification. This article emphasizes the importance of a comprehensive perioperative pain management plan that includes multidisciplinary interventions, using the transitional pain service as an example. By adopting a multidisciplinary and collaborative approach, perioperative team members can improve patient outcomes, enhance patient satisfaction, and reduce healthcare costs. However, further research is necessary to establish targeted interventions to effectively prevent and manage CPSP.

What are the Risks of using Smart Technology in the Construction Phase?

  • Lee, Baul;Park, Seung-Kook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.103-110
    • /
    • 2022
  • In the era of the 4th Industrial Revolution, smart technology being considered to improve productivity breakthroughs is in the spotlight as a means to replace traditional construction technology in the construction industry. However, various problems are occurring in construction sites using smart technology and causing negative impacts on construction projects. Therefore, the objective of this study is to identify risk factors that occur when smart technologies are used in construction projects. To achieve this purpose, this study investigated the difficulties at construction projects using smart technology, and risk factors were derived based on site surveys and literature. The risk factors were measured by experts, and then a total of 19 risk factors was derived by exploratory factor analysis. As a result, risks were classified as 5 factors, the institutional factor is the most difficult response, and the government needs anticipative system improvement and a long-term plan. The research findings provide practical implications for construction experts trying to apply smart technology in construction sites and construction policy-makers to revitalize smart technology.

  • PDF