• Title/Summary/Keyword: Risk Checklist

Search Result 225, Processing Time 0.026 seconds

PRACTICAL APPROACHES TO RISK MANAGEMENT FOR GLOBAL CONTRACTORS

  • Seung Heon Han;Du Yon Kim;Han Him Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1231-1236
    • /
    • 2005
  • Global construction projects manifest more risks than do other industries. Often, firms doing business in construction markets find these risks intimidating. To secure corresponding profits, many global contractors attempt to forecast the effects of risks and establish risk management strategies. However, one key problem with present-day risk management methods is that they are basically analytical or mathematical-oriented approaches which are not easy to adopt in real business. Based on preliminary investigations and evaluations of current tools, this research elicits more practical algorithms for risk checklist by constructing risk scenarios over the whole period of project execution. For the application of the algorithms, a "SE/RF" (Source-Event/Regular-Floating) checklist is suggested, which sorts out risk sources and their subsequent events, as well as dividing various risk factors into either regular or floating categories. In addition, the "PIS" (Probability-Impact-Significance) method is introduced, in place of traditional "PI" (Probability-Impact) methods, by adding the additional criterion of "risk significance" to determine the degree of risk exposure in a more realistic way. As a result, we draw the significant finding that the "PIS" method presents a closer evaluation regarding degree of risk exposure as compared to the level of expert judgments than those from traditional methods. Finally, we provide an integrated procedure for international project risk management with all of the research achievements being incorporated.

  • PDF

A Development of Risk Identification Checklist for Stakeholder in Urban regeneration-Projects (도시재생사업 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.487-490
    • /
    • 2008
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analyzing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

  • PDF

A Development of Risk Identification Checklist for Stakeholders in the Construction Phase of the Urban Regeneration-Projects (도시재생사업 건설단계의 참여주체별 위험인지 체크리스트 개발)

  • Park, Kyu-Young;Young, Moon-Serk;Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.67-75
    • /
    • 2009
  • The mixed-use development project like urban regeneration project has been enforced with long period and participation of various stakeholders. For this character, lots of risk could be occurred during the process of project and the project's success or failure depends on the risk management. So the process of identifying and responding to risks in urban regeneration projects should be followed systemically. The risk identification phase is the first step to identify risk factors and define risk's character. One of the risk identification methods, the checklist, is the most practical and well-known one. This study suggests the check list that devide risks classified by stakeholders through analizing tasks of stakeholders and drawing risks. This kind of checklist which handles risk factors classified by stakeholders is an easy tool to identify risks and expected to be effective to find risks for various stakeholders and themselves in the urban regeneration projects.

An Application of a Baseline Checklist for Risk Assessment of Cumulative Trauma Disorders in Shipyard Workers (범용 위험도 평가서를 이용한 조선업체 작업에서의 누적외상성질환에 대한 인간공학적 분석)

  • Park, Donghyun;Han, Sang-Hwan
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.8 no.1
    • /
    • pp.24-35
    • /
    • 1998
  • Cumulative trauma disorders(CTDs) have been a growing problems for US and European industries with higher incidence rate every year. The increase and their associated costs has led companies to form committes and implement programs to address this problem. In our country, we have just started to recognize and to work on the problems in industry. This study conducted an ergonomic analysis for typical jobs of ship building industry which was not usually surveyed for CTD problem. A baseline CTD checklist which was supposed to do a risk assessment was developed and applied in this study. Initially, we considered five major parts in the checklist which consisted of personal, frequency, posture, force, and miscellaneous information. Most jobs in ship building industry were much different from typical assembly work and VDT work that have been major part of the previous CTD studies. Specifically, job characteristics in terms of frequency and posture were quite different. There were relatively long cycle time, awkward postures for whole body (not just for upper extremities). Also, CTD risk scores based on checklist were a lot higher than the scores for VDT jobs which was a case of preceding application of the checklist. Specifically, grinding jobs turned out to be the most risky one in terms of CTDs. In conclusion, usual CTD prevention guidelines are not likely to he effective in this type of industry. An individual job based interventions are strongly suggested to have a good control of CTD problems in ship building industry.

  • PDF

Nutrients Intake, Zine Status and Health Risk Factors in Elderly Korean Women as Evaluated by the Nutrition Screening Inistiative (NSI) Checklist (NSI Checklist에 의한 우리 나라 일부 노년기 여성의 건강위험도와 영양소 섭취량 및 아연영양상태와의 관련성)

  • 윤진숙;이정현
    • Korean Journal of Community Nutrition
    • /
    • v.7 no.4
    • /
    • pp.539-547
    • /
    • 2002
  • The purpose of this study was to investigate whether the health status as determined by a self-assessment checklist was related to the nutritional status of elderly Korean women. We interviewed 59 female subjects living in the Daegu area aged over 55 years. Information on their dietary intake on two consecutive days was collected by the 24-hour Recall Method. Their body compositions were measured using a Bio-electrical Impedence Fatness Analyzer. Their zinc status was evaluated according to their dietary zinc intake and urinary zinc excretion in urine samples collected for 24 hours. Their heath status was determined by a NSI Checklist. While 50.9% of the total subjects belonged to a moderate nutritional risk group,23.7% of the subjects were at a high nutritional risk. It appeared that only 25.4% of the subjects were evaluated as being healthy. Therefore, the overall nutritional health status of the elderly females belonged to the moderate nutritional risk group. Except for vitamin C, the average daily nutrient intake of the subjects was below the level of the recommended dietary allowances (RDA) for Koreans. The lower the nutritional health score, the better was their dietary intake of energy (p<.05), protein (p<.001), and zinc (p<.01). A positive relationship between their nutritional health score and body fat ratio was also observed (p<.05). Therefore, we suggest that the NSI Checklist could be used as a practical screening tool at the beginning of nutritional surveillance of the elderly in the community.

A Structural Design of Aviation Safety Inspection Checklist for Safety Information Analysis and Safety Risk Assessment (안전정보분석 및 안전위험평가를 위한 항공안전감독 점검표 구조 설계)

  • Choi, Dongwook;Choi, Soonji;Choi, Young J.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.2
    • /
    • pp.59-67
    • /
    • 2016
  • The checklist currently used for Aviation safety inspection performed by ASIs consists of inspection groups and multiple items, it does not have structured hierarchy system which required to efficiently process aviation safety analysis. On this study, through mapping taxonomy of HFACS onto current checklist to secure structured hierarchy system and present a specification on systematic frequency and severity to perform safety risk assessment of detected hazard.

The Development of a Checklist for Quantitative Assessment of Risk Factors and Management of Cumulative Trauma Disorders : Application to Automobile Assembly Lines (누적외상성질환 위험 요인의 정량적 평가 및 관리를 위한 점검표 개발 -자동차 조립 작업을 중심으로-)

  • Lee, Yun-Keun;Kim, Hyun-Wook;Yim, Shang-Hyuk;Park, Hee-Sok
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.11 no.1
    • /
    • pp.56-69
    • /
    • 2001
  • Objectives : This study was designed to develop and standardize a checklist for ergonomic risk factors, and to provide ergonomic guidelines for managing cumulative trauma disorders (CTDs) in automobile assembly lines. Methods : The Checklist for Ergonomic Risk Factors (CERF-1) was developed based on the results of previous studies, and then modified after performing pilot study. Information on the symptoms possibly related with CTDs was obtained using a self-reported Questionnaire from 465 automobile assembly workers. Their job conditions were examined to assess risk factors through both direct observation and video analysis. Results : Rate of detecting risky job through CERF-1 was 85.6%, and was similar to that (88.8%) by Occupational Safety and Health Adminstration(OSHA) checklist but higher than that (63.7%) by American National Standards Institute(ANSI) Z-365. Relationship of the exposure scores derived from CERF-1 with levels of symptom was greater (r=0.49) than OSHA (r=0.28) and ANSI Z-365 (r=0.22). Considering the relationship, jobs scoring higher than 16 could be classified as the Risk Job. and lower than 16 as the Low Risk Job. Sensitivity and specificity of the Risk Job were 92.5 % and 31.5 %, respectively. Odds ratio (OR) after age adjustment was 5.69 (95 % confidence interval 3.15-10.29) for the Risk Job, and these ORs were significantly different from those of the Low Risk Job. The exposure scores were Quite valid, in that the scores at the main survey were significantly correlated with those at the follow-up survey, as suggested by test-retest(r=0.88) and inter-rater reliability(r=0.80). Conclusions : The CERF-1, developed in this study, will be an efficient tool for evaluation of risk jobs for CTDs in automobile assembly lines, and can be used easily by health care providers.

  • PDF

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

Occupational Health and Safety Risk Assessment Checklist for Preventing Accidents During Building Design Phase (재해예방을 위한 건축공사 설계단계 안전 위험성 평가 체크리스트)

  • Han, Byoung-Soo;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.68-74
    • /
    • 2007
  • It has been recognized that safety management is activated during the construction phase to prevent accidents and fatalities of workers. However, It is revealed that about 15% of fatal death accidents is caused by the lack of management of planning and design phases. There is a crucial need of assessing safety risk during building design phase. This paper is aimed to develop a safety risk assessment checklist that can be used during building design phase, utilizing the concept of Design for Safety. In doing so, a broad literature survey on safety management of building Process, various safety risk assessment toolboxes being utilized in the HSE and the BAA of UK. The proposed checklist contains the followings: 1) classification structure for safety design on space, element, and trade work 2) hazard risk factor, probability and degree of intensity of accident occurrence, and 3) safety assessment criteria. It is expected that the checklist would be an effective tool of preventing and minimizing fatal accidents of building construction projects.

A Study on the Nutrient Intake, Health Risk Factors, Blood Health Status in Elderly Korean Women Living Alone (일부지역 저소득층 독거노인의 영양소 섭취, 영양위험도 및 생화학 지표에 관한 조사연구)

  • Kim Hwa-Young;Kim Myune-Hwan;Hong Seong-Gil;Hwang Sung-Joo;Park Mi-Hyoun
    • Korean Journal of Community Nutrition
    • /
    • v.10 no.2
    • /
    • pp.216-223
    • /
    • 2005
  • This purpose of this study was to investigate the nutrient intake, the health status as determined self-assessment checklist, biochemical indicators of elderly Korean women. We interviewed and 55 female subjects living alone in the Urban aged over 65 years. Information on their dietary intake was collected by 24-hour Recall method. Their health status was determined by a NSI checklist. Biochemical indicators were performed in whole blood and plasma of subjects. Except for protein, Fe, all of the elderly subjects belonged to over moderate nutritional risk. The average daily nutrient intake of the elderly was below the level of the recommended dietary allowances (RDA) for Koreans. A relationship between their health risk score and nutrient intake was observed negatively (not significantly). They had a risk of anemia as hemoglobin and hematocrit of subjects were under the normal value. Therefore, the reason that health risk score and health status badly was thought for lower nutrient intake.