• Title/Summary/Keyword: Risk Assesment

Search Result 119, Processing Time 0.028 seconds

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

The study of development of quantitative risk assesment program for the road tunnel (도로터널 위험도 평가프로그램 개발에 관한 연구(I))

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Rie, Dong-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.460-467
    • /
    • 2006
  • Some large accidents in tunnels in recent years, such as Mont Blanc, Gotthard and Tauern tunnels, have lead to an increasing attention for tunnel safety and necessity of tool for quantitative risk assesment of road tunnel. And the purpose of this study is to develop the quantitative risk assesment tool for the application of road tunnel. The objectives of this paper are as follows : (1) analyze of traffic accident rates in tunnel, (2) make out scenario for fire accidents, (3) develop the evacuation model and FED calculation model, (4) Present the results from quantitative risk assesment for the model tunnel according with the fire heat release rates and distances of cross passage.

  • PDF

Quantitative Fire Risk Assesment for the Subway Platform Types (지하철 승강장 형식에 따른 정량적 화재 위험성 평가)

  • Rie, Dong-Ho;Kim, Ha-Young
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.6 s.78
    • /
    • pp.1-6
    • /
    • 2006
  • Subway platform is divided into Side-platform type and Center-platform type. In this study does quantitative fire risk assesment of subway platform types in numerical analysis by using CFD model. From the result of this study, 1) All exhaust mode was low-end result it seems most fire risk at Side-platform station. 2) All exhaust mode was low-end result it seems most fire risk at Center-Platform station. 3) When comparing same type exhaust mode of Side-platform and Center-platform that last thing was visible $9.1{\sim}72.34%$ low-end fire risk. Center-platform is more opera-tive than Side-platform that reduce fire risk when that was same dimension and external environment. Designer look upon a fire characteristic of subway platform types when he make smoke control air volume and platform area design.

Regional Safety Assesment Due to Urban Flood Using GIS (GIS를 이용한 도시홍수에 대한 지역안전도 평가)

  • Yeo, Chang-Geon;Seo, Geun-Soon;Song, Jae-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.14 no.3
    • /
    • pp.68-77
    • /
    • 2011
  • Flood disasters on the metropolis where population and facilities were densely concentrated cause an enormous damage, therefore it is important to find risk and vulnerable area for floods, and then mid-long term disaster reduction plan should be established by the results. However, there is no rational method which reflects urban characteristics to estimate the regional safety for flood. so it is necessary to develop the standardized method of regional safety assesment due to urban flood. The proposed regional safety assesment model in this study was combined risk and mitigation score which consisted of three and two element, and 12 assesment factors which effect flood disasters were selected. And then the integrated regional safety was estimated by subtracting mitigation score from risk score. GIS tool was used to estimate the factor assesment and integrated regional safety. Developed regional safety assesment model was applied in Seoul to evaluate the suitability.

Urban Flood Regional Safety Assesment Model (도시지역 홍수재해에 대한 지역안전도 평가모형)

  • Lee, Chang-Hee;Lee, Suk-Min;Shin, Sang-Young;Yeo, Chang-Geon;Kim, Youn-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.376-379
    • /
    • 2007
  • In recent years, the natural damage associated with flood disaster has been dramatically increased. However, there is no rational method which reflects urban characteristics to estimate the regional safety assessment for flood disaster. The purpose of this study is to develop the regional safety assesment model for urban flood. Flood risk and reduction assesment were estimated by using the linear sum of the Z score of the assessment factors and the weight value of each factor from the expert survey data. And then the regional safety assessment was estimated by subtracting reduction factor value from risk factor value. GIS tool was used to estimate the factor assesment and integrated regional safety. This study can be used to determine the priority of flood protection project, execute the flood insurance and establish the urban plans and the flood mitigate plan.

  • PDF

A study on the Risk Assesment Procedure for Work in the Operational Railway (철도운행선 공사의 위험도 평가절차 수립 연구)

  • Wang, Jong-Bae;Park, Ju-Nam;Park, Chan-Woo;Kwak, Sang-Log
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1037-1045
    • /
    • 2006
  • In this study, a hazard analysis was performed on the accident related work in the operational railway during 2000-2006 years in order to establish risk assesment procedure for work in the operational railway. As a result of hazard analysis, various hazard events for person accident and operation incident were identified, and risk for the each events was evaluated. Also risk matrix was structurized for setting the risk control criteria.

  • PDF

An Objective Method of Risk Assessment Based on Stochastic Modelling (확률 기반의 위험등급평가 객관화 방안)

  • Shin, Sang-Sik;Lee, Kil-Soo;Cho, Heung-Gi
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.465-474
    • /
    • 2013
  • Purpose: To provide a variety of stable military supplies, risk should be avoided or removed. This paper aims to provide an objective method of risk assesment for risk matrix to evaluate risk level. Methods: According to previous results of risk assesment through risk matrix, some parameters and probability density functions, which include characteristics of military supplies, are selected and Risk matrix is modelled based on that. Results: Results show that a proposed method can evaluate objectively risk level through the stochastic modelling and provide well-balanced risk assessments by categorizing into 3 levels such as high, middle and low level risk. Conclusion: A current risk assessment method includes substantial subjectivity of risk assessment and as a problem about military supplies comes up, we can not show any appropriate evidences for decision of risk assessment. We propose an objective scheme employing stochastic modelling with parameters and probability density functions.

Viaduct seismic response under spatial variable ground motion considering site conditions

  • Derbal, Rachid;Benmansour, Nassima;Djafour, Mustapha;Matallah, Mohammed;Ivorra, Salvador
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The evaluation of the seismic hazard for a given site is to estimate the seismic ground motion at the surface. This is the result of the combination of the action of the seismic source, which generates seismic waves, the propagation of these waves between the source and the site, and site local conditions. The aim of this work is to evaluate the sensitivity of dynamic response of extended structures to spatial variable ground motions (SVGM). All factors of spatial variability of ground motion are considered, especially local site effect. In this paper, a method is presented to simulate spatially varying earthquake ground motions. The scheme for generating spatially varying ground motions is established for spatial locations on the ground surface with varying site conditions. In this proposed method, two steps are necessary. Firstly, the base rock motions are assumed to have the same intensity and are modelled with a filtered Tajimi-Kanai power spectral density function. An empirical coherency loss model is used to define spatial variable seismic ground motions at the base rock. In the second step, power spectral density function of ground motion on surface is derived by considering site amplification effect based on the one dimensional seismic wave propagation theory. Several dynamics analysis of a curved viaduct to various cases of spatially varying seismic ground motions are performed. For comparison, responses to uniform ground motion, to spatial ground motions without considering local site effect, to spatial ground motions with considering coherency loss, phase delay and local site effects are also calculated. The results showed that the generated seismic signals are strongly conditioned by the local site effect. In the same sense, the dynamic response of the viaduct is very sensitive of the variation of local geological conditions of the site. The effect of neglecting local site effect in dynamic analysis gives rise to a significant underestimation of the seismic demand of the structure.

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

Evaluation Tool for Analyzing Method of the Information System (정보시스템 위험분석 평가도구)

  • Kim, Kang;Cho, Kyoung-Sik
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2007.06a
    • /
    • pp.773-777
    • /
    • 2007
  • Very various infusion by development of systems that is based on network is spread. Therefore, Evaluation Tool has been an active research area to reduce the risk from intrusion. On this thesis, during threat assesment, we have planned possible an equal-weight applied assesment and considering the characteristics of the organization an assesment which security factor's weight is variably applied to, and respective organizations to examine its security by itself in order to support the easy findings of the vulnerabilities on the management point of view, and to show the advices to practice.

  • PDF