• 제목/요약/키워드: Rise time

검색결과 2,221건 처리시간 0.026초

Rapid Diagnosis Systems Using Accelerometers in Seismic Damage of Tall Buildings

  • Tsuchihashi, Toru;Yasuda, Masaharu
    • 국제초고층학회논문집
    • /
    • 제6권3호
    • /
    • pp.207-216
    • /
    • 2017
  • Installing accelerometers in a building is an effective way to know how the building shakes when an earthquake happens. In this paper, we will introduce an example of an analysis that captures the acceleration reduction effect of the vibration damping device using data observed by the accelerometer at Roppongi Hills Mori Tower in Minato-ku, Tokyo, during the Great East Japan Earthquake on March 11, 2011. Moreover, as the latest effort, from the standpoint of a developer who builds and operates a number of high-rise buildings in Japan, where frequent earthquakes are experienced, a system for real-time processing of accelerometer data was developed to instantly diagnose the degree of damage to high-rise buildings, and the actual system of earthquake damage health monitoring is discussed. This system is currently in operation in twelve high-rise buildings including Roppongi Hills Mori Tower.

법규적 측면에서 고찰한 고층 건축물 공사현장 화재안전 확보방안 (A Study on the Improvement of Fire Safety in high-rise Building Construction in Legal aspects)

  • 박찬석;정일균
    • 대한안전경영과학회지
    • /
    • 제17권1호
    • /
    • pp.21-32
    • /
    • 2015
  • High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fire building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations.

휴대폰 애플리케이션을 통한 초대형 구조물의 동적특성 분석 (Dynamic Characterization of Large-scale Structures through Mobile-phone Application)

  • 정영석;윤성원
    • 한국공간구조학회논문집
    • /
    • 제15권4호
    • /
    • pp.99-105
    • /
    • 2015
  • The serviceability design of the high-rise building is affected by the wind response vibration such as the acceleration, at this time it is important to calculate the natural frequency correctly. Since the suggestion equation of the natural frequency being used in the design phase is not the regression equation obtained from the vibration measurement of the high-rise building, the verification to use for the serviceability design of the high-rise building is necessary. This thesis conducted an ambient vibration measuring on the high-rise building through the mobile-phone application to calculate the natural frequency and suggested a natural frequency approximate expression following the building's height, and compared with the domestic/foreign standard and the result of the eigen-value analysis.

전자기장을 활용한 초고층 건축물 콘크리트 압송기술개발 (Development of concrete pumping technology for construction of high-rise building using electromagnetic field)

  • 김우재;권승희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.4-5
    • /
    • 2018
  • Recently, high-strength concrete used for shortening the construction time of high-rise building construction, Concrete pumping technology is emerging as the core technology of high-rise buildings. In this paper, we have started to study the use of electromagnetic field as a method to increase the efficiency of the lubricating layer between the inside of the pipe and concrete, which has been established as the most important factor determining the pumping performance. The pumping performance improvement effect of concrete strength was verified and basic research was carried out to utilize it as a method to increase the efficiency of pumping in field application. In the related work, the effect of the electromagnetic field was verified by conducting a mock-up performance evaluation (horizontal 300 m) of the pumping force by the concrete strength.

  • PDF

초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구 (The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction)

  • 차민수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.

  • PDF

Sky-bridge로 연결된 구조물의 지진해석을 위한 등가모델 (An Equivalent Model for Seismic Analysis of Structures Connected by a Sky-bridge)

  • 양아람;김현수;이동근;안상경;오정근;문영종
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.203-208
    • /
    • 2008
  • Recently, high-rise building structures connected by a sky-bridge are frequently constructed. To predict accurate dynamic responses of structures connected a sky-bridge, time history analysis is required. Repetitive analyses are required in the design process. If the entire structure model is employed in the repetitive time history analysis, it would take a lot of computational time and engineers' efforts. Therefore, an equivalent model for high-rise building structures connected by a sky-bridge was proposed in this study. The proposed model consists of cantilever having original structure's stiffnesses and masses. Based on the analytical results, it has been shown that the equivalent model can reduce the analysis time and provide similar seismic responses to the original model.

  • PDF

외부부하가 $I^2L-Inverter$의 기능에 미치는 영향 (The Influence of the External Loads on the $I^2L-Inverter$ Function)

  • 이규영;황호정
    • 대한전자공학회논문지
    • /
    • 제22권2호
    • /
    • pp.75-81
    • /
    • 1985
  • 저전류 범위에서 l2L은 연결되는 소자의 input capacitance, resistance 및 그 소자동작에 필요한 전류들에 의해 출력단의 신호가 손상을 입게 되어 logic기능이 방해를 받게 되며 그로 인한 회로의 불확실성이 증가될 수 있다. 본 논문은 이와같은 외부부하와 연결된 I2L-inverter의 기능에 관한 해석을 다루고 rise time과 fall time의 변화에 관한 simulation 및 실험을 통한 측정결과를 비교 분석하였다.

  • PDF

ED MOS 논리 LSI 의 지연시간 모델링과 디자인 논리 시뮬레이터 (Delay Time Modeling for ED MOS Logic LSI and Multiple Delay Logic Simulator)

  • 김경호;전영준;이창우;박송배
    • 대한전자공학회논문지
    • /
    • 제24권4호
    • /
    • pp.701-707
    • /
    • 1987
  • This paper is concerned with an accurate delay time modling of the ED MOS logic gates and its application to the multiple delay logic simulator. The proposed delay model of the ED MOS logic gate takes account of the effects of not only the loading conditions but also the slope of the input waveform. Defining delay as the time spent by the current imbalance of the active inverter to charge and discharge the output load, with respect to physical reference levels, rise and fall model delay times are obtained in an explicit formulation, using optimally weighted imbalance currents at the end points of the voltage transition. A logic simulator which uses multiple rise/fall delays based on the model as decribed in the above has been developed. The new delay model and timing verification method are evaluated with repect to delay accuracy and execution time.

  • PDF

Estimating Door Open Time Distributions for Occupants Escaping from Apartments

  • Hopkin, Charlie;Spearpoint, Michael;Hopkin, Danny;Wang, Yong
    • 국제초고층학회논문집
    • /
    • 제10권1호
    • /
    • pp.73-83
    • /
    • 2021
  • The door open time, resulting from occupants evacuating from apartments, is an important parameter when assessing the performance of smoke ventilation systems in high-rise apartment buildings. However, the values recommended in UK design guidance appear to have limited substantiation. Monte Carlo simulations have been carried out considering variabilities in door swing time, flow rate and number of occupants. It has been found that the door open time can be represented by a lognormal distribution with a mean of 6.6, 8.7 and 11.1 s and a standard deviation of 1.7, 3.2 and 4.7 s for one, two and three-bedroom apartments, respectively. For deterministic analyses, it is proposed that the 95th percentile values may be adopted in line with recommended practice for other fire safety design parameters such as fuel load density and soot yield, giving door open times of 10 s to 19 s, depending on the number of bedrooms.

Performance-based Fire Protection Design of Domestic Super High-rise Buildings - Evaluation by ASET and RSET -

  • Roh, Hyeong-Ki
    • 한국방재학회 논문집
    • /
    • 제11권2호
    • /
    • pp.9-13
    • /
    • 2011
  • 초고층 빌딩 건설 시 요구되는 성능위주 소방설계는 인명 안전을 확보할 수 있는 능동적인 대책으로서 화재 위험성을 평가하고, 공학적 분석 결과를 토대로 하여 방재시스템을 구축하는 것으로 관련 법규 및 기준을 적용하여 수행하는 기존의 설계 방식보다 인명 안전의 확보에 있어서 매우 효율적이고 타당하다고 보여진다. 본 연구는 피난 요구 시간인 RSET과 피난이 가능한 시간인 ASET에 의한Time-line Analysis을 적용하였으며 또한 ASET과 RSET을 비교, 분석하기 위하여 화재 및 피난 시뮬레이션을 수행하였다. 연구 결과, 스프링클러설비가ASET을 증가시켰으며, 화재감지 및 경보시간의 단축이 RSET을 효과적으로 감소시켜 주고 있다. 단축된 시간은 인명의 안전을 확보하는데 많은 영향을 미치는 것으로 확인되었다. 또한 소화설비, 화재 감지 및 경보설비가 정상적으로 작동되도록 유지 관리되는 것도 중요한 것으로 파악되었다. 화재의 성상을 데이터 베이스화하고 피난 대응 프로그램 등이 구축되면 성능위주 설계에 유용한 자료로 이용될 수 있다.