• Title/Summary/Keyword: Review Procedure

Search Result 1,184, Processing Time 0.033 seconds

A Study on Program Review Model for Human Factors in Railway Industry (철도산업의 안전업무 종사자 인적요인 관리를 위한 검토모델 연구)

  • Kwak, Sang-Log;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2040-2044
    • /
    • 2008
  • Recently, many safety measures are developing for the prevention of human error, which is main factors of railway accident. For the efficient management of human factors, many expertise on design, conditions, safety culture and staffing are required. But current safety management activities on safety critical works are focused on training, due to the limited resource and information. In order to establish railway human factors management, a systematic review model is required. Based on system engineering and nuclear industry model, a program review model is proposed in this study. The model includes operating experience review, task analysis, staffing and qualification, human reliability analysis, huma-system interface design, procedure development, training program, verification and validation, implementation and monitoring. Results can be applied for the review of safety measures relating to human factors.

  • PDF

Bronchopulmonary Sequestration - Report of 2 cases and review of 19 cases published in the Korean Journal of Thoracic and Cardiovascular Surgery - (폐격리증 2례 보고 및 대한 흉부외과학회지에 발표된 19례의 문헌 고찰)

  • 곽영태
    • Journal of Chest Surgery
    • /
    • v.20 no.4
    • /
    • pp.829-838
    • /
    • 1987
  • Bronchopulmonary sequestration is a rare congenital malformation of the lung, concerning about the abnormal feeding systemic artery, may happen a serious complication of heeding during operation if not recognized before operation. High index of suspicion of sequestration is the key to successful operative procedure with the aid of characteristic recurrent and long-standing symptoms, its location, and invasive or non-invasive diagnostic tools. We report 2 cases of intralobar type of bronchopulmonary sequestration and review 10 articles about the subject, totaling of 21 cases.

  • PDF

Two Echelon Inventory System With Stochastic Demand (확률적 수요를 가지는 2단계 재고 시스템)

  • 최규탁;김정자
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.26
    • /
    • pp.99-109
    • /
    • 1992
  • This paper presents a cost model of the system which is managed under a continuous review (Q,r) policy at each retailer and peridic review (R,T) policy at the central warehouse. An iterative procedure is performed to find the optimal or near-optimal' solution for the policy parameters at each retailers and a central warehouse in this study.

  • PDF

Augmentation Mammaplasty Using Implants: A Review

  • Takayanagi, Susumu
    • Archives of Plastic Surgery
    • /
    • v.39 no.5
    • /
    • pp.448-451
    • /
    • 2012
  • One of the techniques for augmentation mammaplasty is the procedure using implants. Even though this technique has been used for many years, there are still several controversial issues to be discussed and overcome for patient safety. In this review article, capsular contracture, leak or rupture of the implants, possible systemic disease, relation with breast cancer, and recent problems with Poly Implant Prothese implants are described and discussed.

Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study- (연구과제 선정.평가 체계설계에 관한 연구)

  • 용세중;최덕출;한종우;정용훈;이원영
    • Journal of Technology Innovation
    • /
    • v.2 no.1
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF

A review of ATP Onboard System's Test procedure (열차방호장치(ATP) 차상설비 시험절차에 대한 고찰)

  • Chang, Seok-Gahk;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1163-1168
    • /
    • 2008
  • Automatic Train Protection(ATP) System is developed by ETCS(European Train Control System) CONSORTIUM for unify Europe railway system. ATP system is composed of Eurobalise and EuroATC. Nowadays, Korea construct ATP system in conventional line and new electrical locomotives also install ATP system. It is important to verify quality which form checklist during Factory Acceptance Test at beyond the seas. In this paper, review the process, test item, norm and checklist for the Balise Transmission Module, Compact Antenna Unit, Vehicle Control Unit and Communication Controller at the Plymouth Bombardier and Vasteras enics factory.

  • PDF

Complications Related to Transarterial Treatment of Hepatocellular Carcinoma: A Comprehensive Review

  • Hyoung Nam Lee;Dongho Hyun
    • Korean Journal of Radiology
    • /
    • v.24 no.3
    • /
    • pp.204-223
    • /
    • 2023
  • Currently, various types of transarterial treatments are performed for hepatocellular carcinoma from the early to advanced stages. Its indications and efficacy have been widely investigated. However, procedure-related complications have not been updated in the literature, although new types of transarterial treatments, such as drug-eluting bead transarterial chemoembolization and transarterial radioembolization, are common in daily practice. Herein, a comprehensive literature review was carried out, and complications were organized according to the organs affected and treatment modalities.

150 Consecutive Cases of Delayed Post Mastectomy Reconstruction with TRAM Flap and Results (유경횡복직근피판을 이용한 유방절제술 후 지연재건 150례 및 결과)

  • Jung, In-Uk;Lee, Taik-Jong
    • Archives of Plastic Surgery
    • /
    • v.38 no.1
    • /
    • pp.19-26
    • /
    • 2011
  • Purpose: This is the report on the results of 150 consecutive cases of delayed postmastectomy reconstruction with TRAM flap performed by single surgeon. The purpose of this study is to review the merits, demerits and other considerations of this method by analyzing the results. Methods: 150 patients were reviewed retrospectively who had breast reconstruction by a single surgeon from July 2001 to July 2008. Reviewed factors include demographic factors, mastectomy method, adjuvant therapies (such as radiation, chemotherapy) complication rate, simultaneous contralateral breast procedure rate, secondary touch-up procedure rate, and patients' satisfaction. Results: Ovarall TRAM flap complication rate was 22.6%. Among them, donor site complication rate was 36%, simultaneous contralateral breast procedure rate was 44.6%, secondary touch-up procedure rate was 40%. All rates were higher compared to immediate reconstruction with TRAM flap. But the patients' satisfaction was about the same as immediate reconstruction. Conclusion: Delayed postmastectomy reconstruction with TRAM flap can yield satisfactory results despite of relatively high complication rate and concomitant procedure rate when it is performed by a experienced surgeon.

Oropharyngeal Complications Associated with Laryngomicrosurgery(LMS) (후두 미세수술과 연관된 구강 및 후두 합병증)

  • 강진욱;최승효;남순열
    • Journal of the Korean Society of Laryngology, Phoniatrics and Logopedics
    • /
    • v.14 no.1
    • /
    • pp.5-9
    • /
    • 2003
  • Introduction : Laryngomicrosurgery(LMS) is frequent procedure applying to benign and early malignant larygeal disease such as vocal cord polyp, nodule and early glottic cancer. LMS has been known as safe procedure and short time consuming treatment. So few reports about complications in LMS was done. In this study, complications and problems from LMS were investigated and reported. Method : From 2000, January to 2001, December, 180 patients who were treated with LMS in Asan medical center were studied by retrograde chart review. Results : In these patients, total 9 patients(5%) were suffered from complication. 4 patients (2%) had teeth injury and 4(2%) were suffered from foreign body sensation in tongue and 1(1%) had hypoglossal nerve injury. Main mechanism of complications is thought by pressure injury by laryngoscope blade. No definite correlation between procedure and complication was observed. Conclusion : There are few neural complications with LMS such as lingual and hypoglossal nerve injury. Before operation of LMS, warning and informing of complications by mechanical stress must be done. Gentle procedure and short operation time are necessary to avoid these problems. And patients who have risk factors of oral complications such as dental disease or dental prosthesis must have dental evaluation and treatment before LMS procedure.

  • PDF

A Study on the Evacuation Procedure Analysis Model of General Hospital Considering Patients Types (환자의 유형을 고려한 종합 병원의 피난 절차 분석 모델에 관한 연구)

  • Lee, Seonyeong;Kweon, Jihoon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.28 no.2
    • /
    • pp.7-16
    • /
    • 2022
  • Purpose: This study aimed to present an analysis model evaluating evacuation performance considering patient types and procedural evacuation in the medical facility. The user group of the medical facility, including users challenged in evacuation behavior, entails the risk of many casualties. Therefore, it is necessary to plan an evacuation procedure that considers the evacuation characteristics of users. Methods: Through the review of precedent studies, the evacuation procedure of the medical facility, the classification of patient types, and the evacuation procedure was set as conditions and variables for the analysis. The result caused by a variety of conditions and variables were explored. Results: 1) The total evacuation completion time and congestion time were shortened at the procedural evacuation. Moreover, it derived many users from evacuating at the initial phase. 2) The proposed model can provide a basis for proposing a space planning direction that considers the possibility of not carrying out the evacuation plan. 3) It supports safe evacuation by identifying variables that reduce overcrowding by comparing the congestion time of overcrowded spaces. 4) The analysis model can identify the overcrowded space through the evacuation route and suggest the basis for architectural improvements that reduce overcrowding. Implications: The study results can be used to analyze the performance of evacuation procedures and support the establishment of evacuation procedures and building plans for safe evacuation for medical facilities.