• Title/Summary/Keyword: Restoration plan

Search Result 612, Processing Time 0.022 seconds

Vegetation Restoration Plan for a Coastal Area through Ecosystem Conservation Fund Return Project: - focus on the Dalmaji-gil area, Haeundae-Gu, Busan Metropolitan City. - (생태계보전협력금 반환사업을 통한 해안 식생복원계획 - 부산 해운대구 달맞이 고개 일대를 대상으로 -)

  • Yoon, sung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.2
    • /
    • pp.191-201
    • /
    • 2019
  • This study suggested a vegetation restoration plan for a coastal area where the ecosystem conservation fund return project, targeting the whole area of Dalmaji-gil, located in Haeundae, Busan. After distinguishing if it would be a proper site for the operation of the ecosystem conservation fund return project by analyzing the ecological environment, human environment, and the current status of land owners, the target species for vegetation restoration was determined, and the facilities and programs were selected in accordance with the spatial division of the biosphere reserve. The basic direction is as follows. First, is the expansion of green space and the securement of life habitats downtown. Second, is the conservation of core areas by separating the conserved area from the space for use. Third, is the establishment of ecological resting space and the reinforcement of an ecological educational programs. The significance of this study is to suggest a vegetation restoration plan of a coastal area, fully utilizing the existing vegetation of the subject area, by suggesting the land use and flow planning, environmental improvement (vegetation restoration) plan, life habitats establishment plan, planting plan, and hydrologic plan, facilities, maintenance, and monitoring plan based on the basic direction. This study would provide useful basic data for ecosystem conservation and restoration in the Korean Peninsula, surrounded by the ocean on three sides.

Establishment of Ecological Environment Plan Item on Urban Development Stages (도시개발 사업 단계별 생태환경계획수립 항목 설정에 관한 연구)

  • Lee, Eun Yeob;Kang, Myung Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.4
    • /
    • pp.12-23
    • /
    • 2008
  • This study has a purpose of setting applicable ecological environment plan items when establishing city development plan. To achieve this purpose, multiple methods of data gathering, documentary surveys, and questionaries research were used in this study. The main findings of this study can be summarized as follows; 1. The appliance of ecological environment plan is appropriate to apply before the establishment of development plan. 2. The items applicable to ecological environment plan establishment step by step is the following. First, it is necessary to prepare the environment improvement plan and ecology restoration on the stage of assigning the area. Second, on the stage of planning development plan, it is required to set the restoration plan of ecological resources and step by step ecological environment plan. Third, on the stage of plan implementation, it is required to set the maintenance guide on ecological environment. 3. The planning items of ecological environment plan are "geographical features and soil", "water resource", "wind resource", "green resource", "circulation of resource", "usage of nature energy" and "habitats", etc. 4. To apply ecological environment plan to the planning of development, it is necessary to specify the clear concepts and specific plan. 5. This study is limited to select generalized planning items and later on, it is necessary to develop detailed planning contents.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

An Evaluation on Restoration Effect in the Restored Yangjae Stream and the Improvement Plan Based on the Result (복원된 양재천에서 복원 효과 평가 및 평가 결과에 기초한 개선방안)

  • Kim, A Reum;Kim, Dong Uk;Lim, Bong Soon;Seol, Jae Won;Lee, Chang Seok
    • Korean Journal of Ecology and Environment
    • /
    • v.53 no.4
    • /
    • pp.390-407
    • /
    • 2020
  • This study was carried out to evaluate the restoration effect in the restored Yangjae stream and to draw up an adaptive management plan based on the results. As the result of evaluation on the restoration effect, the restored Yangjae stream was evaluated with low naturalness in both terms of the morphology of the stream and the composition and spatial distribution of vegetation. The diverse functional groups were introduced in the vegetation restoration, but the flooding regime, which is significant in the spatial distribution of riparian vegetation, were not correctly reflected. Exotic species or species that were not ecologically suitable for the location were introduced on the embankment and thus a measure to improve those problems is required. As the ecological principle was not reflected in the restoration plan, the stream was constructed as the double terrace structure. Therefore, the width of the waterway was narrowed further, and the waterfront was not designed to accommodate changes from flooding disturbance, making the micro-topography of the stream simpler and the naturalness lower. The adaptive management plan was prepared to improve those problems, and a plan for creating an ecological network was recommended to enhance the restoration effect.

Restoration and Landscape Ecological Design to Restore Mt. Nam in Seoul, Korea as an Ecological Park (복원 및 경관생태학적 원리에 근거한 남산의 생태공원화 계획)

  • 이창석;문정숙;김재은;조현제;이남주
    • The Korean Journal of Ecology
    • /
    • v.21 no.5_3
    • /
    • pp.723-733
    • /
    • 1998
  • Restoration to improve the ecological quality of Mt. Nam was explored in a viewpoint of restoration in both landscape and ecosystem levels. A restoration plan in landscape level was based on the result on the land-use pattern in Mt. Nam including its surrounding area and that in ecosystem level on the ecological quality of each landscape element. A plant to construct the green network, which extending from Mt. Nam to the Han river through the Yongsan family park and through the Eungbong urban park was prepared as a restoration project in landscape level to improve the ecological quality of Mt. Nam as an ecological park. On the other hand, a plan for restoration and creation of biotop as a restoration project in ecosystem level was also prepared to improve the ecological quality of each green area consisting green network. Green areas composing green network include keystone green area (Mt. Nam), green stations (Yongsan family park, Eungbong urban park, and the han river citizen's park), and green pathway (or ecological corridor) connecting those green areas.

  • PDF

Mistakes Made, Lessons Learned: The Eulsukdo Wetland Restoration Program

  • Lineman, Maurice J.M.;Do, Yuno;Kim, Ji-Yoon;Joo, Gea-Jae
    • Journal of Environmental Science International
    • /
    • v.23 no.8
    • /
    • pp.1523-1536
    • /
    • 2014
  • Restoration is the process of reducing or reversing damage to an ecosystem so that it can function in its original manner. However, many restoration programs do not achieve this. In the Nakdong Estuary, the largest migratory nesting site in the center of the East Asian-Australasian flyway, an estuarine barrage was constructed in the 1980s that required site restoration following its completion in 1987 and the expansion of several large industrial complexes(Noksan and Jangrim) and a residential development(Myeongji). The goal of the restoration was to restore the function of the wetland to its pre-disturbance state. To achieve this, a restoration program was designed consisting of three stages. The first stage(1993-1995), saw the construction of three artificial wetlands(Shinhori, Daemadeung, and Eulsuk), the second(2003-2005) involved the dredging and returning of farmed lands to their natural state, and the third(2008-2012) focused on the rehabilitation and vegetation development of the wetlands. However, the project has not achieved all of the desired goals, and it is an example of the lapses in ecological restoration following anthropogenic disturbance. Issues that resulted in an incomplete restoration included the timing of the stages, noncompliance with the restoration plan, not directly monitoring the restoration or continuing the monitoring following completion of the development project, and the political subversion of the restoration plan. For the success of the restoration plan, it is necessary to avoid mistakes such as inconsistent monitoring, unequal levels of stakeholder involvement, and political interference.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

The Assessment and Restoration Plan for Fragmented Points of Mountain Range in Daejeon (대전광역시 산줄기 단절지점 평가 및 복원방안)

  • Cho, Hyun-Ju;Lee, Eun-Jae
    • Journal of Korean Society of Forest Science
    • /
    • v.104 no.4
    • /
    • pp.622-631
    • /
    • 2015
  • This study was conducted to clarify the distribution and fragmented points of mountain range and to select priority points for restoration by assessment in Daejeon. There were ten Semaek of mountain extended from three Jimaek in Daejeon. As a result of overlapping the main mountain ridge with a network of roads, twelve points out of total thirty-one fragmented points were chosen as practical points for restoration. We developed index and model to assess twelve practical points for restoration. All points were classified into three grades, four points of grade I, five points of grade II and three points of grade III. From this study, we proposed differentiated restoration plan for each grade. Further studies on development of more objective assessment and detailed methodology should be needed to prepare effective restoration plan.

A Study on Establishment of the Directions for Environmentally-friendly Restoration of Underground Stream by Citizen Participation - In the Case of the Yangjae Underground Stream Restoration Project - (주민참여를 통한 도시복개하천의 환경친화적 복원방향설정에 관한 연구 - 과천 양재천 복개하천 복원사업을 사례로 -)

  • Song, Byeong Hwa;Yang, Byoung-E
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.2
    • /
    • pp.33-44
    • /
    • 2006
  • The purpose of this study is to establish future directions of environmentally-friendly restoration of Yangjae underground stream and reflect various opinions of inhabitant in the plan and design process. The opinions from the citizens include the economic and environmental suitability of the restoration projects and preference for the future directions of restoration. The citizens are favorable to removing the existing parking lot and want to have jogging course, walking path and bike road in the stream. Different opinions and resulted in preferred facilities and diminishing existing park along the stream depending on the restoration influencing zone. As a result, citizens agree in restoration but they have different opinions about the feasibility of new facilities, streams restoration and central park reduction locally. It is desirable to reflect the opinions of citizens in the process of plan and design of restoration project.