The aim of this paper is to define major factors influencing land development of each of major uses (residential, commercial, industrial) in the process of rapid urban expansion. The main hypothesis of this study is that land use changing patterns are directed by supply side of land managed to public policies rather than demand side. The graphic analysis is applied to relationships between urban growth and land development process of each use and between land development project managed to public policies and land development process. Public and land development projects and zonning protection seem to be major roles of land supply and main determinants of urban spatial structure. Location factors for land development of each uses are selected in 23 variables. Factor analysis is applied to test correlation between variables in 1971 and 1981. Factor structure between two years is similar, but progressive processing of functional separation is derived such as intensive land use is grouped, different location between residential and industrial use is deep. Dependent variables are standardized to logarithm of land development of each use per unit vacant land in two periods, between 1971 and 1980 year and between 1981 year. Correlation analysis between 6 dependent variables and 23 location factors in each years are applied. Major factors of each use are selected in criteria such as high correlation with dependent variables, low correlation between independent variables and common application in two periods. As the result, major factors for residential land development are Land Readjustment Project (LRP), percent of total zoned area in residential zone, residential floor space density per available area, percent of total area in industrial use; for commercial development is distance to CBD, percent of total area in commercial use, residential floor space density per available area in each year, and volumn rate of industrial use; for industrial use is percent of total area of industrial use is percent of total area of industrial use, Industrial Estate Project (IES), LRP, and distance from CBD. Land development pattern of each use between two periods are slightly different. So 6 equation is derived from appling backward method of regession. Adjusted multiple R squares of all is more than 0.5 and those equation is statistically significant and valuable to assist urban land use forecasting.
본 연구의 목적은 택지개발사업의 계획특성이 사업지구의 지가변동에 미치는 영향을 분석하여 택지개발사업의 효율적인 추진을 위한 정책적 시사점을 도출하는 것이다. 이를 위해 우선 청주시 택지개발사업 추진단계별 지가변동 규모와 양상을 분석하였다. 그리고 이론적 고찰 및 선행연구 검토를 통해 지가변동에 영향을 주는 택지개발사업의 계획특성 요소 16개((1)지가변동률, (2)사업구역 면적, (3)주거용지 비율, (4)상업용지 비율, (5)준주거용지 비율, (6)근린생활시설용지 비율, (7)공동주택 비율, (8)도로율, (9)공원 녹지율, (10)학교 비율, (11)$1m^2$당 조성비, (12)일반주거지역 비율, (13)준주거지역 비율, (14)상업지역 비율, (15)준공업지역 비율, (16)자연녹지지역 비율)를 선정하였다. 선정된 계획특성 요소 16개 중 지가변동에 영향을 미치는 요인을 분석하기 위하여 SPSS 20.0 Version을 이용하여 상관관계를 분석하였다. 지가변동의 양상을 분석한 결과, 지구가 지정되기 2년 전부터 지가가 상승되기 시작하였고 준공이후 지가상승이 안정화되는 것으로 분석되었다. 그리고 지가변동에 영향을 주는 계획특성 요소를 분석한 결과 (2)사업구역 면적, (4)상업용지 비율, (6)근린생활시설용지 비율, (8)도로율, (11)$1m^2$당 조성비, (12)일반주거지역 비율이 지가변동에 영향을 미치는 것으로 분석되었다.
최근 들어 택지개발사업이 크게 증가하는 추세이지만, 무분별한 택지개발은 개발대상 부지의 기존 녹지나 수목을 훼손시키게 되며 지형에도 많은 변화를 가져와 절개지가 발생하게 하는 등 환경을 많이 훼손하고 있다. 택지개발 등 개발사업을 시행할 때 지구지정시 수행하는 사전환경성검토제도와 개발계획의 승인전 협의를 하게 되어 있는 환경영향평가제도가 있다. 사전환경성검토는 택지개발계획 수립 후에 시행하며 환경영향평가는 실시설계 완료 후에 수행하기 때문에 선정된 택지개발지에서 발생할 수 있는 환경문제에 대한 저감방안 강구 등 소극적이고 수동적인 대처에 그치는 경우가 많다. 본 논문의 목적은 초기 입지선정단계에서 택지개발사업을 환경친화적으로 지속가능하게 수행할 수 있도록 대안평가모형을 구축하는 것이다. 이를 위해 선행연구에서 조사된 택지개발사업의 환경평가요인을 바탕으로 퍼지추론과 AHP기법을 이용하여 대안평가 모형을 구축하였다. 의사결정자가 각 대안의 환경훼손도를 10점 척도법에 의해 평가하면 퍼지추론에 의해 환경성능(EP: Environmental Performance)으로 변환하고, AHP기법에 의해 미리 산정된 항목별 가중치를 적용하여 통합환경성능(TEP: Total Environmental Performance)을 산정한다. 통합환경성능이 가장 높은 대안이 최적안으로 선택된다. 이 연구에서 제시한 평가방법을 적용하면 토지이용계획이 확정되지 않은 상태에서 두 가지 이상의 택지개발 예정지역 대안을 정량적으로 평가할 수 있을 것이다. 이로써 택지개발 사업시행으로 발생할 수 있는 환경훼손을 초기 입지단계에서 확인하여 환경오염을 원천적으로 제거해 나갈 수 있을 것이다.
This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.
To accomodate increasing housing shortage in many cities, Korean Government has implemented various residental land development projects to provide more land for new housing construction. Most of the residential areas developed by these projects were used for multi-family housing units. Under this process, the size and location of the neighborhood service facilities in the development area were regulated by uniform standards. For this reason, the neighborhood service facilities were not able to be provided according to the household density but provided in minimum status required by these standards. Based on these considerations, this study aimed to evaluated residential land development project conducted by pubilc authority, one of the residential land development projects in Korea. Results of the case studies confirmed findings from literature review and proposed that existing regulations applied to these projects need to be amended not only to accomodata unique situation of each development area but also to enhance level of the dwelling environment. As ways to resolve these problems, this study suggests followings: (1) more flexible operation of the regulations, (2) inclusion of the socio-economic characteristics of the perspective resident in planning process, and (3) introduction of design techniques in the project. Finally, this study proposed future study directions in relation to this issue.
One of the problems associated with the current system of land development projects implemented by the public sector in Korea is that various service facilities are not ready in time for the occupation of residential dwelling. A major cause of the problem is the lack of financial arrangements which would smooth the cash-flow of the suppliers of the facilities during the project period. In this paper we present two schemes which will contribute to the optimal provision of service facilities by easing the financial constraint facing the land developers and suppliers of the facilities. The first scheme involves channeling a fraction of profits from a land development project and of the proceeds of mandatory sales of Type II National Housing Bonds as a loan to the suppliers of the service facilities. The second scheme considers the participation of the private sector in the project as a member of a consortium comprising the Korea Land development Corporation, the National Housing Fund, and private developers. It is proved that each scheme is superior to the current system. as well as entailing a very small cost.
The purpose of this study was to analyze land use plans of 61 residential complexes and identify the factors that caused the variation of urban parks and green space ratio depending on the land ownership processing method. The ratio of urban parks and green space of expropriation districts was higher than that of replotting districts. Within the same city and country as well as other regions, the parks and green space ratio of land expropriation districts increased higher than 7% compared to that of replotting districts. The variation of urban parks and green space ratio was mainly related to the ratio of road. Small housing complexes such as detached house and quasi-residential sites resulted to expand space for road construction, thus, the areas of urban parks or green space came to reduce. The average urban parks and green space ratio in the urban development by the expropriation method and replotting method are 24.5% and 16.8% respectively. In order to prevent the reduction of urban parks and green space ratio according to the preference of detached house sites or quasi-residential sites in development zones, it is necessary to make systematic adjustment such as adjusting the urban parks and green space ratio securing standard.
Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.
Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.
This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.