• Title/Summary/Keyword: Residential Land Development Project

Search Result 46, Processing Time 0.03 seconds

An Empirical Study on Urban Land Use Changing Patterns with the Rapid Urban Expansion (급속한 도시팽창과정에서 도시토지이용변동의 실증적 연구)

  • 김지열;강병기
    • Journal of the Korean Regional Science Association
    • /
    • v.8 no.1
    • /
    • pp.31-50
    • /
    • 1992
  • The aim of this paper is to define major factors influencing land development of each of major uses (residential, commercial, industrial) in the process of rapid urban expansion. The main hypothesis of this study is that land use changing patterns are directed by supply side of land managed to public policies rather than demand side. The graphic analysis is applied to relationships between urban growth and land development process of each use and between land development project managed to public policies and land development process. Public and land development projects and zonning protection seem to be major roles of land supply and main determinants of urban spatial structure. Location factors for land development of each uses are selected in 23 variables. Factor analysis is applied to test correlation between variables in 1971 and 1981. Factor structure between two years is similar, but progressive processing of functional separation is derived such as intensive land use is grouped, different location between residential and industrial use is deep. Dependent variables are standardized to logarithm of land development of each use per unit vacant land in two periods, between 1971 and 1980 year and between 1981 year. Correlation analysis between 6 dependent variables and 23 location factors in each years are applied. Major factors of each use are selected in criteria such as high correlation with dependent variables, low correlation between independent variables and common application in two periods. As the result, major factors for residential land development are Land Readjustment Project (LRP), percent of total zoned area in residential zone, residential floor space density per available area, percent of total area in industrial use; for commercial development is distance to CBD, percent of total area in commercial use, residential floor space density per available area in each year, and volumn rate of industrial use; for industrial use is percent of total area of industrial use is percent of total area of industrial use, Industrial Estate Project (IES), LRP, and distance from CBD. Land development pattern of each use between two periods are slightly different. So 6 equation is derived from appling backward method of regession. Adjusted multiple R squares of all is more than 0.5 and those equation is statistically significant and valuable to assist urban land use forecasting.

  • PDF

The Impact of Plan Characteristics of Residential Land Development Project on Inner Land Price Change (택지개발사업의 계획특성이 사업지구 지가변동에 미치는 영향)

  • Jang, In-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.698-705
    • /
    • 2016
  • The purpose of this study is to analyze the impact which the plan characteristics of Residential Land Development Projects have on land price changes in the project district and to derive policy implications for the efficient promotion of these projects. For this purpose, we analyzed the promotion land price change progress of Residential Land Development Projects step-by-step. After theoretical consideration and a review of the references, 16 plan characteristics of Residential Land Development Projects affecting land price changes were selected ((1) The rate of land price change, (2) Business area, (3) Residential land ratio, (4) Commercial land ratio, (5) Semi-residential land ratio, (6) Neighborhood facilities land ratio, (7) Apartment house ratio, (8) Street ratio, (9) Park & green ratio, (10) Ratio of land for schools, (11) Site development cost for $1m^2$, (12) General residential area ratio, (13) Semi-residential area ratio, (14) Commercial area ratio, (15) Semi-Industrial area ratio, and Natural green area ratio). We used SPSS Version 20.0 to analyze the impact of the 16 selected plan characteristics on the land price changes. As a result, it was found that the land price began to rise two years (before/after?) the appointment of the district and became stabilized after the completion of the project. The plan characteristics that affect the land price changes were found to be the (2) Business area, (4) Commercial land ratio, (6) Neighborhood facilities land ratio, (8) Street ratio, (11) Site development cost for $1m^2$, and (12) General residential area ratio.

Alternative Evaluation Model in the Development of Environment-friendly Residential Land (택지개발사업의 환경친화적 대안평가모형 구축)

  • Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.156-166
    • /
    • 2009
  • Residential land development projects are tending upwards recently. However, an indiscreet residential land development has tended to damage environment by destroying existing green lands and trees of target lands and generating many cut slopes with transformation of its topography. There are Prior Environmental Review(PER) for district designation and Environmental Impact Assessment(EIA) before approval on development plans. PER is implemented after developing a residential land development plan and EIA is implemented after completing a detail design. As the result, many of residential land development projects are passive to reduce potential environmental problems on the designated sites. Object of this study is to construct an evaluation system on alternatives in the early step of site designation for implementing residential land development projects with environment-friendly and sustainable way. For this, alternative evaluation model is constructed by using Fuzzy Inference and Analytic Hierarchy Process(AHP) method based on Environmental Evaluation Factors of residential land development project, which are proposed in the precedent research. If a decision maker evaluates environment damage by ten-point method, the point is transformed Environmental Performance(EP) by Fuzzy Inference, and then, applying weight that is already calculated by AHP method, Total Environmental Performance(TEP) is calculated. After all, an alternative with the highest TEP is selected as the best one. Using this evaluation system, more than two alternatives of residential land development project site, which can hold location appropriateness in the early under undecided land use plan, can be evaluated quantitatively. As environmental damages, which can be generated by implementing a residential land development project, can be detected in the early step, environmental damages can be removed or reduced at the source.

A Study on the Changes in Residential Environments after Residential Environments Improvement Projects (주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 -)

  • Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

A Study on the Relationship between Dwelling Environment and Household Density in Multi-Family Housing Development (공동주택단지 건설에 있어서 주거환경과 가구밀도에 관한 연구 -택지개발사업지구를 중심으로-)

  • 한상훈
    • Journal of the Korean housing association
    • /
    • v.9 no.2
    • /
    • pp.33-41
    • /
    • 1998
  • To accomodate increasing housing shortage in many cities, Korean Government has implemented various residental land development projects to provide more land for new housing construction. Most of the residential areas developed by these projects were used for multi-family housing units. Under this process, the size and location of the neighborhood service facilities in the development area were regulated by uniform standards. For this reason, the neighborhood service facilities were not able to be provided according to the household density but provided in minimum status required by these standards. Based on these considerations, this study aimed to evaluated residential land development project conducted by pubilc authority, one of the residential land development projects in Korea. Results of the case studies confirmed findings from literature review and proposed that existing regulations applied to these projects need to be amended not only to accomodata unique situation of each development area but also to enhance level of the dwelling environment. As ways to resolve these problems, this study suggests followings: (1) more flexible operation of the regulations, (2) inclusion of the socio-economic characteristics of the perspective resident in planning process, and (3) introduction of design techniques in the project. Finally, this study proposed future study directions in relation to this issue.

  • PDF

Optimal Provision of Service Facilities for Large-scale Land Development Projects: A Loan Scheme and a Consortium Approach (택지개발에 따른 기반시설 적기공급을 위한 유관기관 협조융자와 민간참여 방안)

  • 서승환;김경환
    • Journal of the Korean Regional Science Association
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 1992
  • One of the problems associated with the current system of land development projects implemented by the public sector in Korea is that various service facilities are not ready in time for the occupation of residential dwelling. A major cause of the problem is the lack of financial arrangements which would smooth the cash-flow of the suppliers of the facilities during the project period. In this paper we present two schemes which will contribute to the optimal provision of service facilities by easing the financial constraint facing the land developers and suppliers of the facilities. The first scheme involves channeling a fraction of profits from a land development project and of the proceeds of mandatory sales of Type II National Housing Bonds as a loan to the suppliers of the service facilities. The second scheme considers the participation of the private sector in the project as a member of a consortium comprising the Korea Land development Corporation, the National Housing Fund, and private developers. It is proved that each scheme is superior to the current system. as well as entailing a very small cost.

  • PDF

Changes in Parks and Green Spaces Ratio According to Land Ownership Processing Method in Urban Development

  • Lee, Sang Jo;Huh, Keun Young;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.21 no.6
    • /
    • pp.545-555
    • /
    • 2018
  • The purpose of this study was to analyze land use plans of 61 residential complexes and identify the factors that caused the variation of urban parks and green space ratio depending on the land ownership processing method. The ratio of urban parks and green space of expropriation districts was higher than that of replotting districts. Within the same city and country as well as other regions, the parks and green space ratio of land expropriation districts increased higher than 7% compared to that of replotting districts. The variation of urban parks and green space ratio was mainly related to the ratio of road. Small housing complexes such as detached house and quasi-residential sites resulted to expand space for road construction, thus, the areas of urban parks or green space came to reduce. The average urban parks and green space ratio in the urban development by the expropriation method and replotting method are 24.5% and 16.8% respectively. In order to prevent the reduction of urban parks and green space ratio according to the preference of detached house sites or quasi-residential sites in development zones, it is necessary to make systematic adjustment such as adjusting the urban parks and green space ratio securing standard.

Revitalization of Urban Regeneration through the Happiness Housing Project as Public Housing Policy

  • Kim, Ok-Yeon;Lee, Jae-Pyeong
    • Land and Housing Review
    • /
    • v.5 no.3
    • /
    • pp.151-167
    • /
    • 2014
  • Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.

Improvement of Biotope-Area-Ratio-Indicator and Appraisal System Applicable to Environmental Impact Assessment Projects (환경영향평가 대상사업에 적용가능한 생태면적률 지표 평가체계 개선)

  • Lee, Gwan-Gyu;Lee, Sang-Hyuk;Kim, Gyung-Ho;Lee, Jung-Hwan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.5
    • /
    • pp.113-125
    • /
    • 2011
  • Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.

Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement (거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구)

  • Paik, Hae-Sun;Lee, Young-Hwan;Kim, Jae-Seung
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.