• Title/Summary/Keyword: Reservoir operation

Search Result 540, Processing Time 0.038 seconds

A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir) (위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로))

  • Park, Myeong-Gi;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.1
    • /
    • pp.37-49
    • /
    • 2002
  • The application of conventional method for optimizing firm water supply and hydro-electric power generation has some limitation during abnormal or extreme drought periods. Hashimoto et al. (1982) suggested there risk evaluation criteria such as reliability, resilience, and vulnerability. These three criteria have been incorporated into a mixed-integer programming model for evaluating the possible performance of water- supply reservoir (Moy et al., 1986; Srinivasan et al., 1999). However, till now, these kind of researches have been conducted only for water-supply reservoir. Therefore there have been no other study for multi-purpose dam including hydro-electric power generation. This study presents an improved formulation of the previous model for evaluating a multi-purpose reservoir system operation considering water supply and hydro-electric power generation. The modified model was applied to the Daechung multi-purpose reservoir system in the Keum river basin to demonstrate the efficiency of the improved formulation.

Potential Release of Environmental Flow through Irrigation Reservoir (농업용 저수지에서의 환경용수 방류 능력 평가)

  • Kim, Sang-Min;Kim, Sung-Jae;Kim, Yong-Wan;Park, Tae-Yang;Kim, Sung-Min;Park, Ki-Wook;Jang, Min-Won
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.6
    • /
    • pp.101-109
    • /
    • 2011
  • The purpose of this study was to establish the methodology for providing the environmental flows from irrigation reservoir. Reservoir water budget for study area was analyzed to simulate the water supply scenarios for environmental flows. Bonghyun and Hi reservoirs area, located in Gyeongnam, Gosung-gun, Hi-myeon, were selected for study watersheds and streams for this study. Reservoir operation was simulated to determine the envionmental flows supply amount from March to October with the constraint that environmental flow supply was restrained when the storage of reservoir were below the half or one-third of effective storage. The simulated results indicated that the supply of environmental flows with the amount of 200 ton/day and 600 ton/day resulted in up to 15 mm and 29 mm of runoff depth increase in the downstream, respectively. The effect of environmental flows supply from existing irrigation reservoir was not significant because the irrigation reservoir was not designed to supply the environmental flows. It is necessary to remodel the irrigation reservoir and develop the reservoir operation technique, to meet the need for the environmental flows.

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

Analysis of Sediment Flushing Effect for Reservoir Sedimentation Management of the Patrind Dam in Pakistan (파키스탄 파트린드댐의 저수지 퇴사관리를 위한 배사효과 분석)

  • Noh, Joonwoo;Park, Jinhyeog;Hur, Youngteck;Kim, Sangho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.6
    • /
    • pp.799-807
    • /
    • 2013
  • Reservoir sedimentation is one of the major concerns for sustainable reservoir operation. Since sediment concentration of the rivers in the Himalayan Mountain is very high, a proper sediment management scheme is necessary. This paper presents long-term reservoir sedimentation and sediment flushing based on the gate operation. Focused on the reservoir to be constructed for the Patrind hydropower project in Pakistan, 4 different flushing scenarios were proposed in this study to prevent successive sedimentation. By extending flushing period and by increasing the flushing discharge for 2 times, the flushing rate increases up to 53.2% and 43.6% in proportion to flushing period and discharge, respectively. Based on the simulation presented in this paper, it is expected to establish efficient sediment management plan to increase hydro power generation and sediment flushing simultaneously.

Application of the SCE-UA to Derive Zone Boundaries of a Zone Based Operation Rule for a Dam (저수지 수위 구간별 운영률의 구간 경계 도출을 위한 집합체 혼합진화 알고리즘의 적용)

  • Kang, Shinuk;Kang, Taeuk;Lee, Sangho
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.921-934
    • /
    • 2014
  • The purpose of the study is to derive a long term reservoir operation method that is easy to understand and apply to practical use for dam operators. The zone based operation rule is a simple method to make operation decisions by criteria corresponding to storage zones. The reservoir storage levels dividing a reservoir, however, must be determined by some methods. We developed a reservoir operation model based on the zone based operation rule and the shuffled complex evolution algorithm (SCE-UA) was used to determine storage levels for zone division. The model was applied to Angat Dam in the Philippines that has trouble in water supply due to imbalance between supply and demand. We derived a zone based operation rule for Angat Dam and applied it to the reservoir simulation of Angat Dam using the historical inflow. The simulation results showed water supply deficit and power generation were improved by 34.5% and 21.2%, respectively, when compared with the historical records. The current study results may be used to derive a long term reservoir operation rule.

Effect of Hydraulic-Gun-Aerators on Cyanobacterial Bloom in a Dam Reservoir (댐저수지의 남조류 수화에 대한 간헐식 폭기장치의 효과)

  • Lee, Jeong-Ho
    • ALGAE
    • /
    • v.19 no.1
    • /
    • pp.23-30
    • /
    • 2004
  • The purpose of this study is to assess the effects that hydraulic-gun-aerators have on cyanobactedial bloom in Sayeon Dam Reservoir in Ulsan City, Korea. A total of nine hydraulic-gun-aerators are in operation at the reservoir withe 100 m spacing between each aerator to control severe cyanobacterial bloom in the dam reservoir. The field studies were performed an total four times at two sampling stations in the reservoir from July to August in 2001. The standing crops of phytoplankton did not changed significantly by the operation. The cell concentration of the cyanobacteria at the surface layer were reduced about 10%, which is a poor result for the dispersing cyandobacteria deeper into the water. The average surface temperature during the study was reduced by 2.0$^{\circ}C$ by the hydraulic-gun-aerators. The effect of the operation on the vertical distribution of DO concentration was clear. However, the hydraulic-gun-aerators were not expected to have an effect in the lowest layer of the hypolimnion. In the study, it was proposed that installation distance between each hydraulic-gun-aerator would be proper when they are apart about 120 m based on DO depth profiles.

A Practical Research for More Efficient Utilization of Water Resources in the South-Western Part of Korea (서남부지역 수자원의 효율적 이용방안)

  • 김현영;서영제;최용선;문종원
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.279-286
    • /
    • 1998
  • The south-western part of Korea is situated in an unbalance of water supply and demand relating to the Keum, Mankyung, Dongjin and Youngsan River and their estuary reservoirs. For example, the Keum River estuary reservoir is discharging the larger amount of yearly runoff into the sea due to the small storage capacity, while Saemankeum estuary reservoir which is under construction, has the smaller runoff amount comparing with its storage capacity, And the downstream area of the Youngsan River, such as Youngkwang, Youngam are deficient in water due in larger demand and smaller supply. In order to solve the above unbalanced water supply and demand and also to improve the water use efficiency, the Hierarchical Operation Model for Multi-reservoir System(HOMMS) has been developed and applied to analyze the multi-reservoir operation assuming that the above reservoirs were linked each other. The result of this study shows that 2,148MCM of annual additional water requirement for agricultural and rural water demands are required in this region at 2011 of target year, and these demands can be resolved by diverting and reusing 1,913MCM of the released water from the estuary reservoirs into the sea.

  • PDF

Comparison of streamflow runoff model in Korea for applying to reservoir operation (저수지 운영을 위한 한국 하천 유출 모형의 비교)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.3
    • /
    • pp.513-524
    • /
    • 2011
  • To evaluate the applicability of inflow runoff model to reservoir operation in Korea, DAWAST model and TPHM model which are conceptual lumped daily runoff model and were developed in Korea, were selected and applied to simulate inflows to Daecheong multipurpose dam with watershed area of 4,134 $km^2$, and water storages in Geryong reservoir with watershed area of 15.1 $km^2$ and total water storage of 3.4 M $m^3$. Evaluating inflows on an yearly, monthly, ten-day, and daily basis, inflows by DAWAST model showed balanced scatters around equal value line. But inflow by TPHM model showed high in high flows. Annual mean water balance by DAWAST model was rainfall of 1,159.9 mm, evapotranspiration of 622.1 mm, and inflow of 644.6 mm, from which rainfall was 104.8 mm less than sum of evapotranspiration and inflow, and showed unbalanced result. Water balance by TPHM model showed satisfactory result. Reservoir water storages were shown to simulate on a considerable level from applying DAWAST and TPHM models to simulate inflows to Geryong reservoir. But it was concluded to be needed to improve DAWAST and TPHM model together from imbalance of water balance and low estimation in high flow.

A study on the measures to use Gunnam flood control reservoir through a reservoir simulation model (저수지 모의 모형을 통한 군남홍수조절지의 활용방안에 관한 연구)

  • Yang, Wonseok;Ahn, Jaehwang;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.6
    • /
    • pp.407-418
    • /
    • 2017
  • Due to geographical features of being close to DPRK (Democratic People's Republic of Korea), the Imjin River basin has difficulties in hydrological observation, and is vulnerable to unexpected flood occurrence. As a countermeasure, Gunnam Flood Control Reservoir construction was planned in 2005. Despite such a structural measure, damages by DPRK's illegal release continues to occur. Futhermore the Imjin River's flow has been decreased due to the effect of continuous drought in the Korean Peninsula since 2012 and DPRK's unilateral storage of water. A new operation method is derived for the Gunnam Flood Control Reservoir in order to cope with drought damages on the Imjin River basin and to ensure efficient response time upon flooding. The operation method maintaining Gunnam Flood Control Reservoir's water level by raising from EL.23.0 m to EL.31.0 m during the flood season for securing reservoir capacity enables to secure additional $14,000,000m^3$ water compared to the existing operation methods. The operation method to store inflow by controlling release to $250m^3/s$ in the early stage of flood has increased 2.66% on average in terms of detention effect of reservoir compared to the existing operation methods. The method enables to secure 19 hours to prepare flood compared to the existing methods.

A Study on the Real time Reservoir Operation by Optimization Model considering Deviation Losses (편차손실을 고려한 최적화 모형에 의한 실시간 저수지 운영에 관한 연구)

  • 김채원;이종남
    • Water for future
    • /
    • v.27 no.4
    • /
    • pp.69-84
    • /
    • 1994
  • The aim of this paper is suggest how to control the real time reservoir operation for the optimal operation of reservoir during the draught and the rainy season. The realease and the storage lead to the achievement or the deviation losses, higher or lower than the target level. Considering this deviation as one of the losses, putting the penalty on the losses, the way of optimal reservoir operation is discussed in order to minimize the penalty losses. This study draw the deviation losses' curve depending on the operation objectie for the Daechung Dam, and apply the optimal operation to the Dam by the linear programing technique, using the slope of the deviation curve as the losses coefficience for the objective function. Conclusively, in this paper I can combine the opposing subjects -the release and the storage- as one objective function by the deviation curve, and also show how to decide the criterion relate to the real time reservoir operation by analysing to what extent and how easily the objectives can be achieved, subject to the inflows.

  • PDF