Abstract
The aim of this paper is suggest how to control the real time reservoir operation for the optimal operation of reservoir during the draught and the rainy season. The realease and the storage lead to the achievement or the deviation losses, higher or lower than the target level. Considering this deviation as one of the losses, putting the penalty on the losses, the way of optimal reservoir operation is discussed in order to minimize the penalty losses. This study draw the deviation losses' curve depending on the operation objectie for the Daechung Dam, and apply the optimal operation to the Dam by the linear programing technique, using the slope of the deviation curve as the losses coefficience for the objective function. Conclusively, in this paper I can combine the opposing subjects -the release and the storage- as one objective function by the deviation curve, and also show how to decide the criterion relate to the real time reservoir operation by analysing to what extent and how easily the objectives can be achieved, subject to the inflows.
본 연구의 목적은 갈수기와 풍수기간동안 유입량의 변화에 맞추어 저수지를 최적으로 운영하도록 방류와 저류량을 조절하는 실시간 저수지 운영율을 결정하는 것이다. 최적방류와 저유의 결정은 많은 저수지 운영목적을 충족시켜 목표들을 달성해야 하는 복잡한 의사결정 문제이다. 저수지에서 저류와 방류의 목표는 저수지로 유입되는 유입량의 정도에 따라 달성이라는 충족과 초과 및 미달이라는 편차가 발생한다. 이 편차를 손실로 보아 이 손실에 상응하는 벌과점을 부여하여 벌과손실이 최소가 되도록 저수지의 최적운영을 시도하는 것이다. 본 논문은 대청댐 운영목표로부터 편차손실 곡선을 작성하였으며 곡선의 경사를 손실계수로 운영모형의 목적함수에 반영하여 선형계획기법으로 대청댐 운영에 적용하여 보았다. 그 결과 저수지 운영에서 편차곡선을 이용해서 저류와 방류의 상반성을 반영할 수 있었으며, 유입량의 조건에 따른 목표달성의 정도와 운영의 간편성을 분석함으로 실시간 저수지 운영에서 의사결정을 위한 최적 기준의 설정방향을 제시하였다.