• 제목/요약/키워드: Reservoir modeling

Search Result 238, Processing Time 0.027 seconds

System Development for the Estimation of Pollutant Loads on Reservoir (저수지 유역의 오염부하 산정 시스템 개발)

  • Sim, Sun-Bo;Lee, Yo-Sang;Go, Deok-Gu
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.35-44
    • /
    • 1998
  • An integrated system of GIS and water quality model was suggested including the pollutant loads from the watershed. The developed system consists of two parts. First part is the GIS module. The geographic information system of the study area was built to provide the information on landuse and several surface factors concerning the overland flow processes of water and pollutants. Second part is the modeling modules which include storm event pollutant load model(SEPLM)., non-storm event pollutant load model(NSPLM), and river water quality simulation model(RWQSM). Models can calculate the pollutant load from the study area. The databases and models are linked through the interface modules resided in the overall system, which incorporate the graphical display modules and the operating scheme for the optimal use of the system. The developed system was applied to the Chungju multi-purpose reservoir to estimate the pollutant load during the four selected rainfall events between 1991 and 1993,. based upon monthly basis and seasonal basis in drought flow, low flow, normal flow and wet flow.

  • PDF

Estimation of Local Change in Hydrometeorologic Environment due to Dam Construction (댐 건설로 인한 국지 수문기상환경의 변화 추정)

  • Yoo, Chul-Sang;Ahn, Jae-Hyun;Kang, Sung-Kyu;Kim, Kee-Wook;Yoon, Yong-Nam
    • Journal of Environmental Policy
    • /
    • v.4 no.1
    • /
    • pp.21-38
    • /
    • 2005
  • In this study, a model for analyzing the spatial effect of large dam reservoirs on local hydrometeorology was developed, and then actually applied to the Seomjingang Dam, Soyanggang Dam, Andong Dam, and Chungju Dam. The application included the analysis of land use using the satellite images to derive the change in albedo before and after the dam construction. Summarizing the modeling procedure and its application results are as follows. (1) The change in albedo was found to be closely related with the size of the dam, also the spatial limit of albedo change were estimated to be 10-20km for the Seomjingang Dam, 40km for the Soyanggang Dam, 20-30km for the Andong Dam, and 50km for the Chungju Dam. (2) The change in the coefficient of recycle (ratio of internal supply of moisture to the total available moisture) was found to be big within the narrow boundary of the. dam, but become smaller as the boundary becomes larger. (3) The correlation between the albedo and. coefficient of recycle was found high. Thus, it could be concluded that the change in land use due to dam construction has much effect on the moisture circulation structure. (4) The spatial range of hydrometeorogic effect was compared with the water surface area of dam reservoir. The result showed that the spatial range sensitively increased up to $50km^2$ of water surface area.

  • PDF

A Fundamental Comparison and Enhancement of Simulation and Optimization Modeling Approach for Multiple Reservoir Operation (댐군 연계운영에서 시뮬레이션 기법과 최적화 모형 활용기법의 원론적 비교 및 개선방법에 대한 연구)

  • Kong, Jeong-Taek;Kim, Jae-Hee;Kim, Sheung-Kown
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.118-118
    • /
    • 2012
  • 수자원의 효율적 이용 및 관리는 심화되고 있는 기후변화에 선제적으로 대응하고 발생가능한 물위기에 대비하기 위한 필수조건이다. 그 중 가장 핵심이 되는 요소는 댐에 저수된 물을 효과적으로 이용하는 것, 즉 댐 건설목적에 따라 시간 및 공간별로 적절하게 할당시키는 것이라고 할 수 있다(Kim, 1998). 그러나 단일 댐의 운영과는 달리 수계내 댐군의 연계 운영은 매우 복잡하고 어려운 문제이다. 연계된 댐들간 저수 상황을 고려하여 유역내 시 공간적인 용수 수요의 지속적인 충족을 위하여 유입량 예측의 정확성을 높이도록 하고, 상류 댐에 최대한 저류하도록 하며, 여수로 방류 같은 불필요한 방류를 최소화 하고, 서로 상충되는 목표를 갖고 있지만, 홍수용량 및 발전수위를 최대로 확보하도록 하여야 한다. 이처럼 댐 운영을 위한 실제 상황은 단일 목적에 의한 최적화와는 달리 여러 상충되는 목적 및 구성 요소들간의 타협, 조정을 필요로 한다. 댐군의 연계운영 문제는 1960년대 초부터 현재까지 활발히 연구가 진행되어 온 분야 중 하나이나 문제의 복잡성과 어려움으로 인해 아직까지도 최선의 방안을 제시하기 어려운 문제이다(ReVelle, 2000). 이를 위한 방법은 시뮬레이션 모형 활용기법과 최적화 모형 활용기법으로 대별할 수 있으며 각 방법의 서로 다른 구조적 특성과 장단점으로 인하여 이원화된 체계로 사용되는 것이 현재의 국내 실정이다. 대부분의 실무에서는 이해도도 쉽고, 비교적 결과를 빨리 도출할 수 있는 시뮬레이션 기반의 모형을 활용하며 대표적으로 HEC-5, K-ModSim, HEC-ResSim 등이 활용되어왔다. 반면, 학계에서는 DP, MIP, SLP, SDP 등 최적화기법을 댐운영에 활용 할 것을 제안하고 있지만, 활용에 대한 거부감이 남아있는 것이 현실이다. 본 연구에서는 시뮬레이션과 최적화기법의 원론적 비교를 통해 각 방법의 장단점과 한계점을 분석하고, 왜 이원화된 사용체계로 되었는지에 대한 고찰과 이에 대한 해결책으로 시뮬레이션모형의 장점과 최적화기법의 장점을 결합한 모형을 제안한다. 국내에는 Kim and Park(1998)이 시뮬레이션 기반의 최적화 모형 CoMOM(Coordinated Multi-Reservoir Operating Model)을 개발하였으며, 이후 21C프론티어 연구사업(2001-2011)에서 모형의 보완수정 검증을 통해 실무 활용도를 높여 왔다. 본 연구를 통하여 거부감의 원천을 추적해 보고, 타당한 이유가 있는지 대한 것을 심층 분석해보고, CoMOM모형과 시뮬레이션 모형, 다른 최적화 기법들과의 원론적 비교를 통해 각 방법들의 효율적인 활용방안과 최적화모형의 구체적인 활용방안을 제시하고자 한다.

  • PDF

Comparison of Runoff Models for Small River Basins (소하천 유역에서의 유출해석모형 비교)

  • 강인식
    • Water for future
    • /
    • v.29 no.4
    • /
    • pp.209-221
    • /
    • 1996
  • It may be difficult to make exact estimates of peak discharge or runoff depth of a flood and to establish the proper measurement for the flood protection since water stages or discharges have been rarely measured at small river basins in Korea. Three small catchments in the Su-Young river basin in Pusan were selected for the study areas. Various runoff parameters for the study areas were determined, and runoff analyses were performed using three different runoff models available in literatures; the storage function method, the discrete, linear, input-output model, and the linear reservoir model. The hydrographs calculated by three different methods showed good agreement with the observed flood hydrographs, indicating that the models selected are all capable of sucessfully modeling the flood events for small watersheds. The storage function method gave the best results in spite of its weakness that it could not be applicable to small floods, while the linear reservoir model was found to provide relatively good results with less parameters. The capabilities of simulating flood hydrographs were also evaluated based on the effective rainfall from the storage function parameters, the $\Phi$-index method, and the constant percentage method. For the On-Cheon stream watershed, the storage function parameters provided better estimates of effective rainfall for regenerating flood hydrographs than any others considered in the study. The $\Phi$-index method, however, resulted in better estimates of effective rainfall for the other two study areas.

  • PDF

Analysis of Hydraulic Fracture Geometry by Considering Stress Shadow Effect during Multi-stage Hydraulic Fracturing in Shale Formation (셰일저류층의 다단계 수압파쇄에서 응력그림자 효과를 고려한 균열형태 분석)

  • Yoo, Jeong-min;Park, Hyemin;Wang, Jihoon;Sung, Wonmo
    • Journal of the Korean Institute of Gas
    • /
    • v.25 no.1
    • /
    • pp.20-29
    • /
    • 2021
  • During multi-stage fracturing in a low permeable shale formation, stress interference occurs between the stages which is called the "stress shadow effect(SSE)". The effect may alter the fracture propagation direction and induce ununiform geometry. In this study, the stress shadow effect on the hydraulic fracture geometry and the well productivity were investigated by the commercial full-3D fracture model, GOHFER. In a homogeneous reservoir model, a multi-stage fracturing process was performed with or without the SSE. In addition, the fracturing was performed on two shale reservoirs with different geomechanical properties(Young's modulus and Poisson's ratio) to analyze the stress shadow effect. In the simulation results, the stress change caused by the fracture created in the previous stage switched the maximum/minimum horizontal stress and the lower productivity L-direction fracture was more dominating over the T-direction fracture. Since the Marcellus shale is more brittle than more dominating over the T-direction fracture. Since the Marcellus shale is more brittle than the relatively ductile Eagle Ford shale, the fracture width in the former was developed thicker, resulting in the larger fracture volume. And the Marcellus shale's Young's modulus is low, the stress effect is less significant than the Eagle Ford shale in the stage 2. The stress shadow effect strongly depends on not only the spacing between fractures but also the geomechanical properties. Therefore, the stress shadow effect needs to be taken into account for more accurate analysis of the fracture geometry and for more reliable prediction of the well productivity.

Prediction of Water Storage Rate for Agricultural Reservoirs Using Univariate and Multivariate LSTM Models (단변량 및 다변량 LSTM을 이용한 농업용 저수지의 저수율 예측)

  • Sunguk Joh;Yangwon Lee
    • Korean Journal of Remote Sensing
    • /
    • v.39 no.5_4
    • /
    • pp.1125-1134
    • /
    • 2023
  • Out of the total 17,000 reservoirs in Korea, 13,600 small agricultural reservoirs do not have hydrological measurement facilities, making it difficult to predict water storage volume and appropriate operation. This paper examined univariate and multivariate long short-term memory (LSTM) modeling to predict the storage rate of agricultural reservoirs using remote sensing and artificial intelligence. The univariate LSTM model used only water storage rate as an explanatory variable, and the multivariate LSTM model added n-day accumulative precipitation and date of year (DOY) as explanatory variables. They were trained using eight years data (2013 to 2020) for Idong Reservoir, and the predictions of the daily water storage in 2021 were validated for accuracy assessment. The univariate showed the root-mean square error (RMSE) of 1.04%, 2.52%, and 4.18% for the one, three, and five-day predictions. The multivariate model showed the RMSE 0.98%, 1.95%, and 2.76% for the one, three, and five-day predictions. In addition to the time-series storage rate, DOY and daily and 5-day cumulative precipitation variables were more significant than others for the daily model, which means that the temporal range of the impacts of precipitation on the everyday water storage rate was approximately five days.

Numerical Analysis of Fault Stability in Janggi Basin for Geological CO2 Storage (CO2 지중저장에 따른 장기분지 내 단층안정성 기초해석)

  • Jung-Wook Park;Hanna Kim;Hangbok Lee;Chan-Hee Park;Young Jae Shinn
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.399-413
    • /
    • 2023
  • The present study conducted a numerical modeling of CO2 injection at the Janggi Basin using the TOUGH-FLAC simulator, and examined the hydro-mechanical stability of the aquifer and the fault. Based on the site investigations and a 3D geological model of the target area, we simulated the injection of 32,850 tons of CO2 over a 3-year period. The analysis of CO2 plume with different values of the aquifer permeability revealed that assuming a permeability of 10-14 m2 the CO2 plume exhibited a radial flow and reached the fault after 2 years and 9 months. Conversely, a higher permeability of 10-13 m2 resulted in predominant westward flow along the reservoir, with negligible impact on the fault. The pressure changes around the injection well remained below 0.6 MPa over the period, and the influence on the hydro-mechanical stability of the reservoir and fault was found to be insignificant.

Development of Methods for Estimating Sediment Yield Rate (I) - Modeling Strategies and Field Data Analysis - (비유사량(沸流砂量) 추정방법의 개발(I) -개발방향의 설정 및 자료의 수집·분석 -)

  • Yu, Kwon Kyu;Kim, Chang Wan;Kim, Hyoung Seop;Woo, Hyo Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.1
    • /
    • pp.121-130
    • /
    • 1993
  • The major objective of this study is to develop practical methods for estimating sediment yield rates of medium size watersheds of which areas range from 200 to $2,000km^2$. For this purpose, this study adopts an empirical method of statistical approach and another empirical method of weighting the watershed characteristics factors. A total of 13 data points for sediment yield rate, including five data points from reservoir deposit data and eight data points from sampled river-sediment data have been collected. Meanwhile, seven factors that may affect the sediment yield rate of a watershed have been selected. They are drainage density, rainfall erosivity, ground cover and land use, soil erodibility, topography, river-bed material characteristics, and watershed area. In the companion paper following this paper, methods for estimating sediment yield rate are to be developed using the 13 data points collected and seven watershed characteristics factors selected in this study.

  • PDF

Modeling and Simulation of A Small Hydraulic Actuation System for the Tactical Missile (전술유도무기용 소형 유압식 구동장치의 모델링 및 시뮬레이션)

  • Lee, Doyun;Lee, Hosung;An, Sungyong;Park, Yeonjung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.4
    • /
    • pp.349-357
    • /
    • 2017
  • If an actuation system of the tactical missile is required very fast response time on conditions of short operating time and big loads on the actuator, we would prefer to adopt a small hydraulic system. In this paper, a mathematical model is proposed to analyze and simulate the small hydraulic actuation system. The mathematical model consists of a high pressure vessel model, a pressure regulator model, a hydraulic reservoir model and a actuator model. The suggested model is validated by comparison of simulation results with experimental data. The simulation results show that the mathematical model could be useful for designing a hydraulic actuation system.

Finite element modeling of high Deborah number planar contraction flows with rational function interpolation of the Leonov model

  • Youngdon Kwon;Kim, See-Jo;Kim, Seki
    • Korea-Australia Rheology Journal
    • /
    • v.15 no.3
    • /
    • pp.131-150
    • /
    • 2003
  • A new numerical algorithm of finite element methods is presented to solve high Deborah number flow problems with geometric singularities. The steady inertialess planar 4 : 1 contraction flow is chosen for its test. As a viscoelastic constitutive equation, we have applied the globally stable (dissipative and Hadamard stable) Leonov model that can also properly accommodate important nonlinear viscoelastic phenomena. The streamline upwinding method with discrete elastic-viscous stress splitting is incorporated. New interpolation functions classified as rational interpolation, an alternative formalism to enhance numerical convergence at high Deborah number, are implemented not for the whole set of finite elements but for a few elements attached to the entrance comer, where stress singularity seems to exist. The rational interpolation scheme contains one arbitrary parameter b that controls the singular behavior of the rational functions, and its value is specified to yield the best stabilization effect. The new interpolation method raises the limit of Deborah number by 2∼5 times. Therefore on average, we can obtain convergent solution up to the Deborah number of 200 for which the comer vortex size reaches 1.6 times of the half width of the upstream reservoir. Examining spatial violation of the positive definiteness of the elastic strain tensor, we conjecture that the stabilization effect results from the peculiar behavior of rational functions identified as steep gradient on one domain boundary and linear slope on the other. Whereas the rational interpolation of both elastic strain and velocity distorts solutions significantly, it is shown that the variation of solutions incurred by rational interpolation only of the elastic strain is almost negligible. It is also verified that the rational interpolation deteriorates speed of convergence with respect to mesh refinement.